| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC AMBARI PO KAMALA BAGAN DIST DARJEELING WEST BENGAL 734 426 | DARJEELING | WEST BENGAL | 734426 | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.5 L+₹10,958.49 (2.47%)Rejected-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | ₹4.5 L+₹10,958.49 (2.47%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.6 L+₹18,190.21 (4.10%)Rejected-Finance | ₹4.6 L+₹18,190.21 (4.10%) | L3 | Rejected-Finance L3 |
Tender Value
₹4.4 L
EMD Value
₹9,000
Closing Date
21 Feb 2026, 11:00 amClosed
EE(C)
79 BIDHAN SARANI
REPAIRING OF UTTARAN I.P.S AND PAVER BLOCK SURFACE AT 23,26,26/1 TARAK CHATTERJEE LANE , 16 JADU PANDIT ROAD, 19 MASJID BARI STREET AND OTHERS UTTARAN IN WARD NO- 18
2026_KMC_1001679_1
KMC/EEC/II/18/21/25-26/UTT/2ND
Open Tender
CIVIL WORKS
Percentage
30 days
WD-18
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
15 Sept 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 44.58 | M3 | 79.9 | ₹3,562.06 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-2) | 14.86 | M3 | 1,627.46 | ₹24,184.87 |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 198.14 | SQM | 24 | ₹4,755.36 |
| 4 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 14.86 | M3 | 5,672 | ₹84,288.76 |
| 5 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete | 168.42 | SQM | 124 | ₹20,883.96 |
| 6 | BUILDING WORKS (D) FLOORING A. ORIGINAL WORKS 48. SUPPLYING & LAYING AS PER IRC-SP:063-2004 PAVER UNIT OF ANY SHADE OF APPROVED QUALITY AS PER RELEVANT IS CODE, LAID IN PATTERN AS DIRECTED IN PAVEMENT, FOOTPATH, DRIVEWAY (PAVER BLOCK ONLY), ETC INCLUDING NECESSARY UNDERLAY COMPLETE IN ALL RESPECT WITH ALL LABOUR AND MATERIAL. [BORDER CONCRETE IF NECESSARY TO BE PAID SEPARATELY]. NOTE: SUB-GRADE CBR SHOULD NOT BE LESS THAN 5. (B) 50 MM THICK INTERLOCKING DESIGNER CONCRETE PAVER BLOCK M- 30 GRADE FOR NON-TRAFFIC ZONE,BUIDING PREMISES,GARDEN,PARKS,DOMESTIC DRIVE AS PER IS: 15658- 2006(OVER 20-30 MM MEDIUM SAND BED ON 200MM THK BOUND GNAULAR /GRANULAR BASE COURSE INCLUDING COST OF SAND FOR SAND BED BUT EXCLUDING COST OF BASE COURSE & SUBGRADE PREPARATION.) (II) COLOURED DECORATIVE | 29.72 | SQM | 875 | ₹26,005.88 |
| 7 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 409.7 | SQM | 50 | ₹20,485 |
| 8 | BUILDING WORKS(P) SOLING, EDGING AND METALLING??(15)Labour for taking out old soling edging including removing debris. (a) Single flat soling | 4.1 | %SQ | 981 | ₹4,019.16 |
| 9 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 2. Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 245.82 | SQM | 40 | ₹9,832.8 |
| 10 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 163.88 | SQM | 361 | ₹59,160.68 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_2454456.xls
BOQ • 0.30 MB
civil.pdf
Additional Documents • 4.88 MB
tenderform.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .