| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC LOA ISSUED, ELECTRONIC CLOSING OF LOA IS BEING DONE NOW |
Tender Value
₹2.3 L
EMD Value
₹2,300
Closing Date
3 May 2018, 2:00 pmClosed
Superintending Engineer/ MEDC
Superintending Engineer, MEDC,K.Pudur, Madurai
E-tender for Strengthening works of both HT and LT Lines in Alanganallur Town Panchayat of Alanganallursection in Samayanallur Division of Madurai Electricity Distribution Circle, Madurai under IPDS
2018_EB_91837_1
SE/MEDC/ET/ WC (IPDS)/ 011 /18-19 Dt 18.04.18
Open Tender
Electrical Works
Works
90 days
Alanganallur
As per BQR Condition in the tender document
2 documents required · 2 mandatory
₹0
₹2,300
Yes
8 Sept 2021
18 Apr 2018
3 May 2018
18 Apr 2018
3 May 2018
18 Apr 2018
Amount
Labour charge for transporting of 42' RSJ Pole from road side to work spot, including loadingand unloading charges, T&P etc, Complete upto 500 M (PART A)
Labour charge for Earth work excavation to 42' RSJ pole in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3 (PART A)
Labour charge for Erection of 42' RSJ Pole with base plate in the excavated bit, tools and plants etc, complete. (PART A)
Labour charge for transporting of 9 M PSC (400 KG-Wind pressure) Pole from road side to work spot, including loading and unloading ,T&P ,Machineries , Complete etc., upto 500 M (PART A)
Labour charge for Earth work excavation to 9 M PSC (400 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3 (PART A)
Labour charge for Erection of 9 M PSC (400 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for transporting of 8 M PSC (200 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART A)
Labour charge for Earth work excavation to 8 M PSC (200 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including Tools and plant, lead and lift complete etc. Pit Size 1.13 M3 (PART A)
Labour charge for Erection of 8 M PSC (200 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for earthing of 42' RSJ / 36' RSJ /9M PSC pole (400 KG-Wind pressure) / 8 M PSC (200 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART A)
Providing PCC sleeve concrete and plastering of concrete for 42' RSJ / 36' RSJ /9M PSC pole (400 KG-Wind pressure) / 8 M PSC (200 KG-Wind pressure) Pole for the size of - 0.12 M3 (0.6 X 0.45 X 1.2) Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART A)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc (PART A)
Labour charge for Erection of stay set complete with stay plate incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART A)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART A)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/4.09mm conductor complete, etc., (PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator complete etc in Pin point location. (PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator and Disc complete etc in Cut Point location (PART A)
Labour charge for Erection HT Tapping channel Cross arm ,Guarding cross arm , Top insulator Fitting with pin insulator and Disc complete etc (PART A)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc. (PART A)
Labour charge for releasing of ACSR 7/2.59 mm conductor and hand over to the section officer including hire vehicle and tools charges complete etc. (PART A)
Labour charge for transporting of 8 M PSC (200 KG-Wind pressure) Pole from road side to work spot, including loading and unloading charges, T&P etc, Complete upto 500 M (PART B)
Labour charge for Earth work excavation to 8 M PSC (200 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including Tools and plant, lead and lift complete etc. Pit Size 1.13 M3 (PART B)
Labour charge for Erection of 8 M PSC (200 KG-Wind pressure) Pole with base plate in the excavated bit, tools and plants etc, complete. (PART B)
Labour charge for earthing of 8 M PSC (200 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART B)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc (PART B)
Labour charge for Erection of stay set complete incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART B)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/3.35 mm conductor (PART B)
Labour charges for erection of Three Phase cross arm with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location (PART B)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc. (PART B)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc (PART C)
Labour charge for Erection of stay set complete incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART C)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART C)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/3.35 mm conductor (PART C)
Labour charges for erection of LT Top instulator fitting with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location (PART C)
Labour charges for erection of Three Phase cross arm with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location (PART C)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc.(PART C)
Applicable SGST has to be quoted as numbers
Applicable CGST has to be quoted as numbers
Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .