| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.5 LAdmitted-Finance SHOP NO 4 NIRMAL VIHAR SECTOR 7 KARNAL HARYANA 132001 | KARNAL | KARNAL | HARYANA | 132001 | -9.90% | ₹64.5 L | L1 | Admitted-Finance |
| 2 | L2₹71.6 L+₹7.1 L (11.0%)Admitted-Finance NOT AVAILABLE | +0.00% | ₹71.6 L+₹7.1 L (11.0%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-The firm has not submitted the valid registration /enlistment on HEW Portal and a valid affidavit |
Tender Value
₹71.6 L
EMD Value
₹1.4 L
Closing Date
14 May 2026, 11:00 amClosed
YOGESHWAR
HSVP DIV 1 Sec 8 Panchkula
Prov and lay of RCC Pipe line 900mm NP-3 Pipe and Construction of Man hole from Ind Area Ph II to Disposal near Plot No. 73 in I Area Ph I Panchkula including mtc. and defect liability period of three years free of cost.
2026_HBC_520530_1
2026AC427775 9E1C 42C6 A12B 8C683862C3CE269HSV
Open Tender
Civil Works
Works
90 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
Yes
₹1.4 L
Yes
18 Aug 2026
8 May 2026
15 May 2026
8 May 2026
14 May 2026
8 May 2026
8 May 2026 - 14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 4.12.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil. | 4,485 | P. Cum | 78 | ₹3,49,830 |
| 2 | 4.31.1:-Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil [Through Rate] | 4,485 | P. Cum | 51 | ₹2,28,735 |
| 3 | 11.5.3 12 mm cement plaster of mix : 1 :4 (1 cement: 4 fine sand) | 725.38 | P. Sqm | 113 | ₹81,968.17 |
| 4 | 10.100.2 Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 40 mm size in foundation and plinth. | 22.05 | P. Cum | 1,863 | ₹41,079.15 |
| 5 | 7.21.1:- Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate] | 233.5 | P. Cum | 4,128 | ₹9,63,875.62 |
| 6 | 21.93.1:-Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer- in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 42 | Each | 1,155 | ₹48,510 |
| 7 | 21.95.8]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment
gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 8. 900 mm [Through Rate] | 1,250 | P. Mtr. | 4,127 | ₹51,58,750 |
| 8 | 6.14.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to stone aggregate 20 mm nominal size) | 28.79 | P. Cum | 3,875 | ₹1,11,541.88 |
| 9 | 6.33.3 Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Cold twisted bars. | 2,615.34 | P. Kg | 68 | ₹1,77,843.12 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_599427.xls
BOQ • 0.25 MB
AD0133734.pdf
Additional Documents • 1.44 MB
OT0133734.pdf
Other Document • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .