Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | +0.00% | ₹4.1 L | L1 | Admitted-Finance |
Tender Value
₹4.1 L
EMD Value
₹8,240
Closing Date
10 Aug 2026, 10:00 amClosed
EO
NP TODA
WORK NO 16 E NIT NO 11/2026
2026_DLB_578456_16
E NIT NO 11/2026-27 REF NO 1942 DATE 27-07-2026
Open Tender
Civil Works
Percentage
NP TODA
WORK NO 16 E NIT NO 11/2026
2 documents required · 2 mandatory
₹500
NP TODA
₹8,240
Yes
19 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART - A BUILDING AND STRUCTURE WORKS | |||||
| 1.02 | Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete 30cmx30cmx60cm, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 of MoRT&H specification & type "A" as per IS : 278-1978 size designation 5 (line wire 2.24, point wire 2.00mm mass 97-106 g/m) including all material, labour. | - | Mtr | 616 | - |
| 1.03 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | - | kg | 114.5 | - |
| 1.04 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 4,860 | - |
| 1.05 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm). | - | sqm | 93.1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1028126.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .