Tender Value
₹5.8 Cr
EMD Value
₹11.6 L
Closing Date
22 Jul 2020, 12:00 pmClosed
Executive Engineer PHED Tohana
Executive Engineer PHED Tohana
Providing sewerage scheme and Const of STP for Tohana Town of Distt Fatehabad including O and M for 12 months during defect liability period after trail run of 3 months and Five years thereafter at Tohana Town
2020_HRY_134351_1
Const of STP Tohana Town
Open Tender
Civil Works - Others
Works
540 days
Tohana Town
As per Approved NIT
3 documents required · 3 mandatory
₹20,000
Yes
Executive Engineer PHED Tohana
₹11.6 L
Yes
28 Sept 2020
4 Jul 2020
22 Jul 2020
4 Jul 2020
22 Jul 2020
4 Jul 2020
Amount
Main Pumping Station - Design, construction, erection, testing and Commissioning of MPS and following Components including O & M for 6 Years including defect liability period :- (i) Panel room of 30 sq. mtr. Covered area and PLC room including toilet block of 20 sq. mtr. covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float. The toilet block shall be with one half staff urinal & one European W/C, one wash hand basin as per approved drawings. (ii) RCC inlet chamber, screen chamber, rectangular collecting tank suitable for 5.00 MLD average flow with peak factor of 2.25, landscaping of the campus, providing and installing 1 No. of 468.17m3 / hour, 2 No. of 208.33m3/ hour and 2 No. of 104.17m3 / hour at 20 mtr. head each with suitable LT Panel equipped with all safety devices, automatic capacitor bank and submersible cable from LT Panel to pump sets complete in all respects. (iii)K-9 D.I. Pipe of suitable dia at MPS including welding and screwing of Flanges. ISI Marked D.I. fittings, Sluice Valves, Non return valves as per requirement even for bye pass arrangement complete in all respects. Pipe from MPS to inlet channel of STP and for bye pass and from chlorination tank to nearby drain will be issued by department free of cost. (iv) 3 Nos. CI Gear Operated Sluice Gate with SS spindle (SS 410) and seats (SS 304) (2 Nos for Screens and 1 no. for partition of collecting tank) as per design. (v) Supply and installation of 2 Nos. mechanical coarse screens of minimum length 6 meters for 5.00 MLD average flow with peak factor of 2.25. Note: 1. The connecting sewer of same diameter and material of construction, laid at adequate depth between sewers to newly constructed structures is included in scope of work. 2. All the infrastructure except construction of staff quarter, and path ways/ roads required to be executed at site to make the MPS functional is included in the scope of work of lump sum job. 3. All the Pumping Machinery, Panel Board, Level Sensor etc shall be controlled by PLC & SCADA and shall be synchronized with the PLC panels at MPS & STP site through broadband internet facility. 4. The size and quantities of all the above components will be as per approved Structural/ Hydraulic/ Mechanical/ Electrical Design to be approved by Department before actual execution of work.
SEWAGE TREATMENT PLANT - “Design, construction, erection, testing & commissioning of 5.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including disposal of treated effluent through DI rising main=50 mtrs, mechanical fine screen. Landscaping, MCC Panel Room & all other contingent Electrical, Mechanical, Piping & Instrumentation work. With PLC & SCADA Arrangement for STP & MPS along with Synchronizing it with each other including furniture & laboratory equipments as per detail given in the bid document and including following components including O&M for 6 years:- (i) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 4 No. LED energy efficient lamps on each pole. (ii) Supply and installation 2 Nos. Fine Screens of minimum length of 6 meters for 5.00 MLD average flow with peak factor of 2.25 than 500 kg) at STP site. (iii) Providing and installing 2 No. centrifuges (1Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same to market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.5 of the NIT, including operation & Maintenance of 6 Years. (iv) Construction of Laboratory Building min. 30 Sqm (v) Provision of Collecting Tank min. size = 3x5x3 mtr
CCTV CAMERAS - Providing and Installing 5 CCTV Cameras 3 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site. Cameras: i) At STP & MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12mm lens size, 1 Nos. 3.6mm lens size. Make: - Sony/ Canon/Panasonic/ Samsung. CCTV Cameras should be installed and commissioned before starting execution of work including operation & Maintenance of 6 Years.
TRANSFORMER, D.G. SET & FENCED ENCLOSURES - Design, Supply & Erection of 1No. copper wound Transformer for MPS 200 KVA & STP 250 KVA on load tap changer or suitable capacity on higher side (at STP) of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 6 Years
TRANSFORMER, D.G. SET & FENCED ENCLOSURES - Design, Supply & Erection of 1 Nos. DG Set of 125 KVA on STP 200 KVA on MPS or suitable capacity on higher side capacity each with Acoustic Canopy, AMF Panel and Copper Earthling of suitable rate with change over switch & synchronizing panel complete as per DNIT including operation & Maintenance of 6 Years.
TRANSFORMER, D.G. SET & FENCED ENCLOSURES -Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, windows & fittings with toilet block including all Sanitary fittings etc. as per drawings attached in DNIT at MPS & STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminium frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float Covered Area (600 sqm) including operation & Maintenance of 6 Years.
Bidder Name
Amount
Shiv Construction Company
WOG TECHNOLOGIES PRIVATE LIMITED
WOG TECHNOLOGIES PRIVATE LIMITED
WOG TECHNOLOGIES PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .