| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹7.3 L Quoted ₹6.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹6.9 LRejected-AOC PLOT NO 41 T H ROAD KESAVAPURAM MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | ₹6.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHARTHI TECKMA CONTRACTS L2 | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Overhauling of Turbine Lub Oil Cooler Booster Pump Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges ,dismantling of bearing housings &bearing at DE & NDE and their inspection & changing the bearings if necessary (Bearing will be supplied by TNPGCL) | 2 | Nos | 13,717 ₹27,434 | 12,844 ₹25,688 |
| 2.00 | Dismantling of Glands from DE & NDE stuffing box, inspection of gland sleeves and replacing if necessary. Opening of top cover of split casing, dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Renewal of Gaskets & Gland ropes. Reassembling and positioning of the rotor and closing of top casing . (Necessary spares will be provided by the TANPGCL) | 2 | Nos | 13,717 ₹27,434 | 12,844 ₹25,688 |
| 3.00 | Reconditioning of Pump Top, Bottom Casing & Casing Rings etc., grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & Bottom casings, and casing wear rings and Welding with suitable special electrodes after preheating the casing and rings as per requirement. Dismantling the Suction Strainer from the strainer well, cleaning the strainer, reconditioning the strainer basket if required & renewal of strainer well top cover ‘O’ ring. (Welding Electrodes will be provided by the BOARD) | 2 | Nos | 11,308 ₹22,616 | 10,588 ₹21,176 |
| 4.00 | Checking and correcting the pump alignment with motor and rechecking of pump alignment after connecting the suction & discharge flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper. | 2 | Nos | 15,400 ₹30,800 | 14,420 ₹28,840 |
| 5.00 | Overhauling of Hydrogen Cooler Booster PumpDecoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump, Dismantling of Suction strainer top cover and the strainer. | 2 | Nos | 6,259 ₹12,518 | 5,861 ₹11,722 |
| 6.00 | Dismantling of the Bearing Covers, Bearing Bracket, Bearing Bracket Lantern, splash ring, Dismantling of mechanical Seal, shaft sleeve and dismantling of the casing cover from the volute casing etc., | 2 | Nos | 9,768 ₹19,536 | 9,146 ₹18,292 |
| 7.00 | Dismantling the impeller Assembly from the Volute Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably | 2 | Nos | 10,123 ₹20,246 | 9,479 ₹18,958 |
| 8.00 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the mechanical seals after inspection and replacement of the spares & sleeves, Assembling the splash ring, Bearing Bracket Lantern, Bearing Bracket, Bearings, Bearing Covers and assembling the half coupling in shaft | 2 | Nos | 9,768 ₹19,536 | 9,146 ₹18,292 |
| 9.00 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper (paint under Contractor Scope) | 2 | Nos | 20,394 ₹40,788 | 19,096 ₹38,192 |
| 10.00 | Overhauling of Hydrazine Dozing Pump Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges. | 2 | Nos | 2,443 ₹4,886 | 2,288 ₹4,576 |
Tender Value
Refer Docs
EMD Value
₹6,300
Closing Date
25 Nov 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit II Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26
2025_EB_622206_1
CE / MTPS-I / SE / M-I / TM /OT. 357 / 2025-26
Open Tender
Power/Energy Projects/Products
10 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹6,300
Yes
18 May 2026
11 Nov 2025
26 Nov 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
Amount
Overhauling of Turbine Lub Oil Cooler Booster Pump Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges ,dismantling of bearing housings &bearing at DE & NDE and their inspection & changing the bearings if necessary (Bearing will be supplied by TNPGCL)
Dismantling of Glands from DE & NDE stuffing box, inspection of gland sleeves and replacing if necessary. Opening of top cover of split casing, dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Renewal of Gaskets & Gland ropes. Reassembling and positioning of the rotor and closing of top casing . (Necessary spares will be provided by the TANPGCL)
Reconditioning of Pump Top, Bottom Casing & Casing Rings etc., grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & Bottom casings, and casing wear rings and Welding with suitable special electrodes after preheating the casing and rings as per requirement. Dismantling the Suction Strainer from the strainer well, cleaning the strainer, reconditioning the strainer basket if required & renewal of strainer well top cover ‘O’ ring. (Welding Electrodes will be provided by the BOARD)
Checking and correcting the pump alignment with motor and rechecking of pump alignment after connecting the suction & discharge flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper.
Overhauling of Hydrogen Cooler Booster PumpDecoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump, Dismantling of Suction strainer top cover and the strainer.
Dismantling of the Bearing Covers, Bearing Bracket, Bearing Bracket Lantern, splash ring, Dismantling of mechanical Seal, shaft sleeve and dismantling of the casing cover from the volute casing etc.,
Dismantling the impeller Assembly from the Volute Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably
Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the mechanical seals after inspection and replacement of the spares & sleeves, Assembling the splash ring, Bearing Bracket Lantern, Bearing Bracket, Bearings, Bearing Covers and assembling the half coupling in shaft
Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, coupling pads and replacing if necessary, coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings and suction strainer well inside area, also the connected pipelines and painting of the pump base concrete structure with Oil Distemper (paint under Contractor Scope)
Overhauling of Hydrazine Dozing Pump Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges.
Dismantling the crosshead piston and connecting rod, removing the well crank plate, removal of sleeve for cross head, removal of the bearings properly, dismantling of worm and worm wheel assemblies, cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure
Dismantling of the pump, plunger assembly, valve and valve seats, inspection and replacing the worn-out parts if necessary and reassembling the pump.
Inspection of couplings, coupling pads and replacing if necessary, Coupling the motor and the liquid well assembly, Filling of oil in the sump, Assembling the speed reduction assembly, connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and successful commissioning of the pump. Cleaning & painting the complete pump assembly & Base structure, painting the connected pipelines and painting of the pump base concrete structure with Oil Distemper. (Paint under Contractor Scope)
Overhauling of phosphate Dozing Pump Decoupling the motor and the liquid well assembly, Draining the oil from the pump, dismantling the speed reduction assembly, dismantling the plunger and the pump bodies and connected flanges.
Dismantling the crosshead piston and connecting rod, removing the well crank plate, removal of sleeve for cross head, removal of the bearings properly, dismantling of worm and worm wheel assemblies, cleaning and inspection of all the above parts for wear and replacement if necessary. Reassembling all the above after overhauling as per the procedure
Dismantling of the pump, plunger assembly, valve and valve seats, inspection and replacing the worn-out parts if necessary and reassembling the pump
Inspection of couplings, coupling pads and replacing if necessary, Coupling the motor and the liquid well assembly, Filling of oil in the sump, Assembling the speed reduction assembly, connecting the plunger and the pump bodies and connected flanges, checking of alignment with the motor and successful commissioning of the pump. Cleaning & painting the complete pump assembly & Base structure, painting the connected pipelines and painting of the pump base concrete structure with Oil Distemper . (Paint under Contractor Scope)
Overhauling of Heater Drip PumpDecoupling and removing the pump & motor from the bed and Dismantling the DE & NDE bearing housings of pump.
Cleaning the Suction line, suction filter and Discharge line flanges, CW line flanges and renewal of gaskets and connecting suction and discharge lines with the pump, connecting and welding of the leak off line with the pump and other connected CW lines for the commissioning of the pump.
Dismantling and cleaning of oil coolers & cooling water lines and changing gaskets and assembling with the pump.
Dismantling pump internals
Renewal of defective shaft sleeves, checking measurements.
Cleaning the pump parts and assembling after replacing of worn-out parts, Checking pump float and Other required dimensions.
Dismantling the cooling chamber plate, renewal ‘O” rings & Gasket and assembling, heating Bearing housings for fitting bearings, Reconditioning the pump tie rods.
Shifting the motor to plinth place, aligning & coupling the pumps with motors and Commissioning of HDP.
Centering of heater drip pump main shaft for free rotation
Charges for dynamic balancing including transportation (A) For Dynamic balancing (B) For Transportation
Enamel paint
Shaft Sleeve for TLOCBP Pump
Non-Drive End/Heater Drip Pump Bearing/ Model:7311B
Drive End/Heater Drip Pump/ Model: NU 411
Charges for Consumables and T&P’s item Sl.No:1 to 25
SHARTHI TECKMA CONTRACTS (BID ID -1519118)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_743936.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid