| 1 | L1₹13.6 LAdmitted-Finance | ₹13.6 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sree Ragu Contracts & Consultancy Ast Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details) | 4,40,880 | M2 | 0.25 ₹1.1 L |
| 2.00 | Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines. | 4,40,880 | M2 | 0.32 ₹1.4 L |
| 3.00 | Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File. | 4,40,880 | M2 | 0.27 ₹1.2 L |
| 4.00 | Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself. | 4,40,880 | M2 | 0.52 ₹2.3 L |
| 5.00 | Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas. | 4,40,880 | M2 | 0.37 ₹1.6 L |
| 6.00 | Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print. | 4,40,880 | M2 | 0.44 ₹1.9 L |
| 7.00 | Marking of Village Topo-map: Marking radius of 400m, 800m, 1200m, 1600m from the centre oint of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India. | 14 | No | 3,950 ₹55,300 |
| 8.00 | Preparation of documents for fixing land value: Preparation of 6 sets of documents required for arriving land compensation including obtaining sales value from Registration Department for all survey numbers within 400m radius, 800m (R), 1200m (R) and 1600(R) for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor and assisting the Revenue officials at the Collectrate Land Section as per the guidelines of the Revenue Department. | 14 | No | 9,850 ₹1.4 L |
| 9.00 | SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | 9 | Percentage | 9 ₹1.0 L |
| 10.00 | CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only | 9 | Percentage | 9 ₹1.0 L |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
4 Feb 2026, 2:00 pmClosed
SE GCC CBE
Office of the SE GCC CBE TATABAD COIMBATORE 641012
Conducting Revenue survey and Preparation of LPS and related documents for assessing land compensation for LILO of Palladam Tiruppur 230 DC line and 110 KV Kethanur-Sultanpet DC line and LILO of 110 KV Gudimangalam- Poonapuram DC line
2026_EB_644862_1
ETS No. 58/25-26 of SE GCC Cbe
Open Tender
Civil Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
Yes
12 May 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
Collection of Field Maps and Revenue records: Towards the charges for collection of field maps, patta, chitta, land owners details, etc., pertaining to both sides of approved alignment as instructed by the Department Officers for survey numbers involved from the starting chainage to ending chainage of this project for the proposed alignment for formation of corridor. (Field work to collect details)
Conversion of Individual FMB into Auto CAD File: Identification of respective lands that are corridored by the Transmission Line by Transect Walking System aiding with GPS devices along the center line of the corridor. Preparation of rough alignment sketch by denoting the Survey Numbers of the land that pass through. Based on the sketch, conversion of indivdual FMB Sketch with Ladder measurements that are corridored by the Transmission Line to be done within the Tolerance Limit in AutoCAD. Tolerance Limit shall be applied as per the Survey of India's Guidelines.
Combining FMB Sketches and converting into KML File: As per prevailing practices/guidelines, width markings to be carried out on either side from mid-line for entire individual FMB Sketches that pass through the Transmission Line Corridor. Further, entire Individual FMB sketches to be combined for forming alignment Topo Drawing. Profiling of the combined FMB Sketches in the field by providing Control Points at every 2km interval using DGPS Instrument. With Reference to the Control Points, the entire Transmission Line Corridor to be compiled as KML File.
Conducting Topographical Surveying: Towards the charges for conducting topographical survey along the Transmission Line to ascertain a corrider width by using Total station (Detailed field survey), including taking of all existing features in the field. The base area of all the towers to be surveyed, Total land area of all the Land owners to be surveyed with the reference of survey stones. Cost of leads, lifts, conveyance, survey tools & plants, hire charges, all labour charges, head loads etc., to be accompanied by the contractor itself.
Sub-Division Work: Towards the charges for marking Transmission Line Corridor, Tower Base in the individual FMB sketches and combined FMB Sketches. Calculation of land areas of Tower base, Transmission Alignment along with Corridor Width and identification of land owners. Sub-division sketches to be formed based on the identified land areas.
Print: Individual FMB, Combined FMB Sketch, Patta, Sub-division FMB, Topo Map - 6 Sets Colour print.
Marking of Village Topo-map: Marking radius of 400m, 800m, 1200m, 1600m from the centre oint of location to be marked in the village Topo-map by using AutoCAD software by using guidelines of the Survey of India.
Preparation of documents for fixing land value: Preparation of 6 sets of documents required for arriving land compensation including obtaining sales value from Registration Department for all survey numbers within 400m radius, 800m (R), 1200m (R) and 1600(R) for fixing the market value of lands for Survey numbers in Tower locations / Transmission Corridor and assisting the Revenue officials at the Collectrate Land Section as per the guidelines of the Revenue Department.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
58s.pdf
Tender Documents • 0.51 MB
BOQ_772780.xls
BOQ • 0.87 MB
Download all tender documents and submit your bid