Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹8,475
Closing Date
21 Jun 2026, 5:00 pm6d left
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
Construction of New Boundary Wall infront of Balangi College, Badakhua in W.N_02
2026_ORULB_131363_52
BM_08_2026_27
Open Tender
Civil Works - Roads
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,475
Yes
10 Jun 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
21 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 250mm dia 3.00 mt long Single under reamed pile foundation with RCC M20 using 12mm size hgcb chips incl all cost but excluding steel cost | 47 | nos | 2,615.81 | ₹1,22,943.07 |
| 2 | Earth Work in ordinary soil within 50met. Initial lead and 1.5met. Initial lift including rough dressing and levelling the bed including all labour T&P etc. complete as directed by the Engineer - in Charge. | 4.05 | Cum | 210.52 | ₹852.61 |
| 3 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 2.03 | Cum | 1,080.6 | ₹2,188.21 |
| 4 | Cement concrete (1:3:6) using: 4cm size hard granite hand broken metal with all cost conveyance,royalty,taxes etc all complete. | 2.03 | Cum | 6,224.35 | ₹12,604.31 |
| 5 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. | 12.1 | Cum | 6,448.33 | ₹78,024.79 |
| 6 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete. | 16.55 | Qntl | 9,372.95 | ₹1,55,103.58 |
| 7 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. | 56.6 | Sqm | 249.83 | ₹14,140.38 |
| 8 | Rigid and smooth centring,shuttering for RCC works for beam/Column incl all cost | 58.8 | Sqm | 1,219.7 | ₹71,718.36 |
| 9 | Supplying all labour T&P material for 1st Class Brick masonry in CM (1:6) using Fly Ash Bricks in Superstructure | 36.75 | Cum | 5,738.31 | ₹2,10,882.89 |
| 10 | 12mm thk plastering in CM (1:6) incl all cost | 343 | Sqm | 196.44 | ₹67,378.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_595551.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid