Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | ₹3.2 L | L1 | Accepted-Finance L1 LOWEST |
| 2 | L2₹3.2 LAccepted-Finance | ₹3.2 L | L2 | Accepted-Finance L2 LOWEST |
| 3 | L3₹3.2 LAccepted-Finance C O ROSHAN YADAV ADVOCAT E SHOP NO 6 KAMLA MARKET KAITHI BAZAR ROAD BANDA BANDA UTTAR PRADESH 210001 | BANDA | UTTAR PRADESH | 210001 | ₹3.2 L | L3 | Accepted-Finance L3 LOWSET |
Tender Value
₹3.2 L
EMD Value
₹6,325
Closing Date
7 May 2026, 5:00 pmClosed
Executive Officer
NP Bisanda
CONSTRUCTION OF R.C.C NALA FROM H/O BED TO P/O HARIOM IN BANDA ORAN ROAD
2026_DOLBU_1143408_1
420/Nirman/NPBisanda/2026-27 Date 28-04-2026
Open Tender
Civil Works
NP Bisandabujurg
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹373
Executive Officer
₹6,325
16 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
7 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cleaning of site | 1 | Job | 2,000 | ₹2,000 | 1 |
| 2 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete (si. No. 251 chapt. No. 4 page no. 23) | 75.6 | CUM | 120 | ₹9,072 | 2 |
| 3 | 50% Disposal of malwa upto 5km. From site | 56.7 | CUM | 268.5 | ₹15,223.95 | 3 |
| 4 | DEWATRING BY 5 H.P PUMP SET | 8 | DAY | 1,360 | ₹10,880 | 4 |
| 5 | S/L of laying of first class 0 bedding on well compacted sand ,morram or approved granilar materials as per class 1105 b( chapt no. 9 page no. 88) | 7.56 | CUM | 1,500 | ₹11,340 | 5 |
| 6 | cement concrete with 4cm (1/2") gauge approved stone ballest , approved course sand cement in the proportion 1:4:8 including supply of all materials , labours and tools and plants etc.required for proper complition of the work | 5.95 | CUM | 4,300 | ₹25,585 | 6 |
| 7 | R.C.C Work cement approved cource sand and 2cm (3/4) gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with 24B.W.G.I. bindingwire on including | 23.99 | CUM | 7,100 | ₹1,70,329 | 7 |
| 8 | C.C Work cement approved cource sand and 2cm (3/4) gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with 24B.W.G.I. bindingwire on including | 0.6 | CUM | 6,100 | ₹3,660 | 8 |
| 9 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to required shape as cnecessary including bending supply of steel its wastage and hooks and outhorized overlapping shall be measured SI no. 504. | 11.37 | Qtl | 5,600 | ₹63,672 | 9 |
| 10 | S/F OF DISPLAY BOARD | 1 | No | 4,500 | ₹4,500 | 10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
NIT6.pdf
Tender Documents • 0.98 MB
BOQ_2135857.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid