Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.8 Cr
EMD Value
₹17.6 L
Closing Date
6 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANISH KUMAR
DGM TECHNICAL
Udhog bhawan gandhi maidan
Ranjit Kumar
Executive Director (Project)
CONSTRUCTION OF ROAD, DRAIN, SAFETY & DISASTER RISK REDUCTION BUILDING(CUC) & INSTALLATION OF SOLAR STREET LIGHTS, AT INDUSTRIAL AREA-MURLIGANJ(MADHEPURA)
125827
NIT-45/BIADA/2025-26, Group-03
Open Tender
CIVIL
Madhepura
• REGISTRATION
Department
Registration No.
Class No.
Date of Issue
Date of Validity
• LEGAL STATUS OF BIDDER
ITB clause 4.3 (a)(Attach Self Attested Copy)
• PERMANENT ACCOUNT NUMBER (PAN)
• GST REGISTRATION
• COST OF BOQ
• BID SECURITY
(PLEDGED/ISSUED AFTER DATE OF TENDER (AS PER
CLAUSE NO. 16 OF SBD) Scanned Copy to be attached and
Original copy to be submitted in office)
• WORK EXPERIENCE OF SIMILAR NATURE
ITB clause 4.5 (A)(b) (AS PRESCRIBED IN NIT/SBD)
• QUANTITY WISE EXPERIENCE
(EXECUTED QUANTITY IN ANY ONE FINANCIAL YEA
R DURING LAST FIVE YEARS
• ANNUAL FINANCIAL TURN OVER OF LAST FIVE YE
ARS
ITB clause 4.5 (A)(a)
(Balance Sheet, Profit & Loss And Audit Report duly audited
by CA)
• LIQUID ASSETS AND OR AVAILABILITY OF CREDIT F
ACILITY (10% OF PROJECT COST) (ITB clause 4.5 B(c))
• BIDDING CAPACITY (BC=A*N*3-B)
(Should be more than the bid value) ITB clause 4.7 B
• (A) AMOUNT OF EXISTING COMMITMENTS AND ONG
OING WORKS
• (B) AMOUNT OF WORK FOR WHICH BID ALREADY SU
BMITTED
• BANKERS' CERTIFICATE FOR EVIDENCE OF ACCESS
TO OR AVAILABILITY OF CREDIT FACILITIES
• AFFIDAVIT
• CHARACTER CERTIFICATE
• UNDERTAKING
(i) Investment of minimum cash up to 25% of the value of the
work during implementation of the contract
• Bid Validity : 120 days
• LITIGATION HISTORY
(ITB clause 4.3 (j))
• PROPOSED METHODOLOGY AND PROGRAMME OF
CONSTRUCTION (ITB clause 4.3 (1) & 4.5(B)(a)
• TECHNICAL PERSONNEL
(ITB clause 4.5 B(b))
• LIST OF KEY PLANTS & EQUIPMENTS
(ITB clause 4.5 B(a))
• The bidder must have Experience of Interior Renovation/Building Work
CIVIL
PERCENTAGE
L1
1
26 documents required · 26 mandatory
₹11,800
Processing Fee: 5900
₹17.6 L
3rd Floor, Udyog Bhawan, East Gandhi Bhawan, Patna
21 Feb 2026
21 Feb 2026
7 Mar 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
23 Feb 2026
STANDARD BIDDING DOCUMENT (NIT/45/BIADA/2025-26,GR-03)
TECHNICAL BID SHEET
BIHAR INDUSTRIAL AREA DEVELOPMENT AUTHORITY First Floor, Udyog Bhawan, East of Gandhi Maidan, Patna
Name of Work CONSTRUCTION OF ROAD, DRAIN, SAFETY & DISASTER RISK REDUCTION BUILDING(CUC) & INSTALLATION OF SOLAR STREET LIGHTS, AT INDUSTRIAL AREA-MURLIGANJ(MADHEPURA) Cost of Work as per BOQ (Rs.) Time of Completion in months 6 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Cost of BOQ 10000+18% GST = Rs. 11800.00 88100485 Date of Tender 11.02.2026
Sl No. Items Requirement NAME OF THE CONTRACTOR
ADDRESS OF THE CONTRACTOR
1 Bid Validity Affadavit as per SBD Bid validity periods In days
2 BID SECURITY Scanned Copy to be attached) As per attached SBD (A) Indian post office term deposit 3 year/5year/National Saving Certificate/ Kishan Vikash Patra duly endorsed by the Competent Postal authority in Bihar issued in the same year. Amount To be entered (Rs in Lakhs)
(B) Fixed deposit receipt of a Schedule bank, Fixed deposit receipt should be Valid for six months after last date of receipt of tender and shall be pledged in favour of the BIADA. Amount To be entered (Rs in Lakhs)
(C ) 5 year National Development bond/State development loan certificate. Amount To be entered (Rs in Lakhs)
(D) Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given. (As per format attached in SBD) Amount To be entered (Rs in Lakhs)
(E) Bank draft issued by by scheduled bank in favour of BIADA payable at Patna Amount To be entered (Rs in Lakhs)
BID SECURITY AMOUNT (Rs. In Lakhs) Bid Security Amount - (Rs in Lakhs) 1763000
3 (i) Legal Status of Bidder.
(ii) Place of Registration.
(iii) Principal place of Business _(* #,##0.32_);_(* \(#,##0.32\);_(* "-"??_);_(@_)
(iv) Power of attorney of signatory Bid
4 Turn Over As per NIT/SBD Amount To be entered (Rs in Lakhs)
2020-21 Amount To be entered (Rs in Lakhs)
2021-22 Amount To be entered (Rs in Lakhs)
2022-23 Amount To be entered (Rs in Lakhs)
2023-24 Amount To be entered (Rs in Lakhs)
2024-25 Amount To be entered (Rs in Lakhs)
5 Work Experience of Similar nature (As per SBD in attach format) As per NIT/SBD
6 Quantity wise Experience (As per SBD and in attached format) As per NIT/SBD
7 The contractor should possess required valid license for executing the work and should have executed similar works for a minimum amount as indicated in Appendix in any one year. (To be filled in the format specified under 1.3.1)
8 Liquid assets and /or availability of credit facilities As per attached SBD/Appendix
9 Assessed Available Bidding Capacity (A*N*3-B) A = Maximum value of civil engineering works executed in any one year during the last five years (updated to the price level of the year indicated in Appendix) taking into account the completed as well as works in progress. N = Number of years prescribed for completion of the works for which bids are invited. B = Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next one year. (As per attached SBD)
(i) (a) Existing commitments and ongoing works (As per format attached SBD)
(ii) (b) Work for which Bid already submitted (As per format attached SBD)
10 Evidence of access to or availability of creadit facilities As per format attached in SBD Amount To be entered (Rs in Lakhs)
11 Litigation History (As per format attached SBD) As per format attached in SBD
12 Affidavit As per format attached in SBD
13 Undertaking As per format attached in SBD
14 Proposals (As per format attached SBD) Proposal, If any for sub contracting of elements of work, costing more that 10% of the Bid amount.
15 Authority Authority to seek references from the bidders bankers.
16 Proposed methodology and Programme of Construction The proposed methodology and programme of construction, backed with equipment planning and deployment, duly supported broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones (As per attached SBD)
17 List of Key Personnel As per attached SBD
18 List of Key Plants & Equipments As per attached SBD
19 Registration As per attached SBD
20 Permanent Accountant Number (PAN) (As per NIT) and GST As per NIT/SBD
21 Income Tax Return (ITR) As per NIT/SBD
22 Value Added Tax As per NIT/SBD
23 Sales Tax Clearance As per NIT/SBD
24 Character Certificate As per NIT/SBD
25 Non debarred/ blacklisted by any State Govt./Central Govt. / Govt. undertaking in India as on the date of bid As per as per SBD
26 Electrical License As per as per SBD
Note Evaluation will be done as per SBD Clauses & the information provided in the document attached with tender. Bidder may Disqualify, if documents are not attached properly.
STANDARD BIDDING DOCUMENT
TECHNICAL BID SHEET
BIHAR INDUSTRIAL AREA DEVELOPMENT AUTHORITY First Floor, Udyog Bhawan, East of Gandhi Maidan, Patna
TENDER NO. 10/BIADA/2025-26 DATE OF ISSUE OF TENDER 01.07.2025
NAME OF THE WORK Construction work of Multistoried Pre-Engineered (G+2) Building (Phase – 2) for the Development of industrial area Jhanjharpur as a Model Green Industrial Area. COST OF WORK AS PER BOQ Rs. 27, 76,01,086.00
BID SECURITY (EMD)AMOUNT Rs. 5586500 COMPLETION PERIOD IN MONTHS 9 Months
NAME OF TENDERER All Colered Cells Are Mandatory To Be Filled By The Bidders
ADDRESS , E-MAIL & WHATSAPP ENABLED MOOBILE NUMBER OF TENDERER
S.N. ITEMS REQUIREMENT REMARKS PAGE NO.OF UPLOADED DOCUMENT
1 REGISTRATION (Any Contractor Registered with Central Government / Any State Government / Any Public Sector Undertakings or an Agency of National or International repute may tender but Registration with Bihar Industrial Area Development Authority will be essential after issue of Letter Of Acceptance.) Department
Registration No.
Date of Validity
2 ELECTRICAL LICENCE REGISTRATION (The contractor or his identified sub-contractor should possess required valid electrical license for executing the building work and should have executed similar electrical works for a minimum amount as indicated in Appendix in any one year. (To be filled in the format specified under 1.3.1) ( Cl. 4.5 A(d))) Department
Registration No.
Date of Validity
3 LEGAL STATUS OF BIDDER ITB clause 4.3 (a) (Attach Self Attested Copy) (i) Individual/Partnership/Pvt. Ltd./Public Ltd.
(ii) Place of Registration.
(iii) Principal Place of Business
(iv) Power of Attorney of Signatory Bid (ITB clause 4.5(iv))
4 JOINT VENTURE (Bids from Joint ventures are acceptable above Rs. 10.00 Crore Projects) Bids from Joint ventures are acceptable above Rs. 10.00 Crore Projects. The tenderer will have to submit the Joint Venture documents as per eligibility criteria & other instructions issued vide Road Construction Department letter No. 8131(S) dated 24.7.2012.
5 PERMANENT ACCOUNT NUMBER (PAN) Attach self attested copy
6 GST REGISTRATION Attach self attested copy
7 COST OF BOQ (e payment only) 10000+18% GST = Rs. 11800.00
8 BID SECURITY (PLEDGED/ISSUED AFTER DATE OF TENDER (AS PER CLAUSE NO. 16 OF SBD) Scanned Copy to be attached and Original copy to be submitted in office) (A) Unconditional bank guarantee from any scheduled Indian bank in the format given ATTACH AS PRESCRIBED IN SEC-2 OF SBD (B) e-Payment Amount To Be Entered (Rs. In Lakhs)
9 WORK EXPERIENCE OF SIMILAR NATURE ITB clause 4.5 (A)(b) (AS PRESCRIBED IN NIT/SBD) Satisfactory completed at least one similar nature work of value not less than 50% of estimated value of contract (Rs. In Lakhs). The completion certificate shall be issued by employer not below the rank of Executive Engineer.
10 QUANTITY WISE EXPERIENCE (EXECUTED QUANTITY IN ANY ONE FINANCIAL YEAR DURING LAST FIVE YEARS ITB clause 4.5 (A)( c ), 4.5 (A) (d) & 4.5(A)(e)) MINIMUM QUANTITY / AMOUNT AS PRESCRIBED IN SBD
Earth work + Local sand - 4240.26 Cum.
PCC+RCC -1561.00 Cum.
Brick Flat Soling : 1849.00 Sqm
Autoclaved Aerated Cement Blocks (AAC) work - : 635.00 Cum.
Plaster work - 3950.00 Sqm.
Stuctural Steel work - 365.525MT
Reinforcement work - 267.145 MT
Glavanised steel Deck Sheet - 3233.00 Sqm
Painting work - 3679.00sqm.
High Pressure laminate (HPL) : 354.75 Sqm
Flooring work-5010.0 Sqm
Electrical work Rs.32,71,685.00
PHE work -Rs. 16,53,525.00
Fire fighting/ Sprinkler System Rs.42,62,750.00
Water Proofing WORK : 4045.0 Sqm.
11 ANNUAL FINANCIAL TURN OVER OF LAST FIVE YEARS ITB clause 4.5 (A)(a) (Balance Sheet, Profit & Loss And Audit Report duly audited by CA) FY 2020-2021 Amount To be entered (Rs in Lakhs)
FY 2021-2022 Amount To be entered (Rs in Lakhs)
FY 2022-2023 Amount To be entered (Rs in Lakhs)
FY 2023-2024 Amount To be entered (Rs in Lakhs)
FY 2024-2025 Amount To be entered (Rs in Lakhs)
12 LIQUID ASSETS AND OR AVAILABILITY OF CREDIT FACILITY (10% OF PROJECT COST) (ITB clause 4.5 B(c)) CERTIFICATE ISSUED BY BANK AS PER PRESCRIBED FORMAT IN SEC-2 OF SBD ON AND AFTER DATE OF TENDER
13 BIDDING CAPACITY (BC=A*N*3-B) (Should be more than the bid value) ITB clause 4.7 B A = Maximum value of civil engineering works executed in any one year during the last five years (updated to the price level of the year indicated in Appendix) taking into account the completed as well as works in progress. N = Number of years prescribed for completion of the works for which bids are invited. B = Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next ----- year (period of completion of the works for which bids are invited).
14 (A) AMOUNT OF EXISTING COMMITMENTS AND ONGOING WORKS ATTACH AS PER SEC 2- 1.4(A) ON & AFTER DATE OF TENDER ( Bidder must decleare themselve their all exising commitment hiding fact be sufficient cause for rejection)
(B) AMOUNT OF WORK FOR WHICH BID ALREADY SUBMITTED ATTACH AS PER SEC 2- 1.4(B) ON & AFTER DATE OF TENDER ( Bidder must decleare themsslve their all exising commitment hiding fact be sufficient cause for rejection)
15 BANKERS' CERTIFICATE FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF CREDIT FACILITIES CERTIFICATE ISSUED BY BANK AS PER PRESCRIBED FORMAT IN SEC-2 ON AND AFTER DATE OF TENDER
16 AFFIDAVIT (i) ATTACH AFFIDAVIT AS PRESCRIBED IN SEC-2 OF SBD ON AND AFTER DATE OF TENDER
(ii) ATTACH AFFIDAVIT AS PRESCRIBED IN NIT ON AND AFTER DATE OF TENDER
17 CHARACTER CERTIFICATE Attach a Valid Character Certificate of Tenderer issued by competent authority
18 UNDERTAKING (i) Investment of minimum cash up to 25% of the value of the work during implementation of the contract (i) ATTACH AS PRESCRIBED IN SEC-2 OF SBD I.T.B. 4.2(ii)
(ii) Bid Validity : 120 days (ii) ATTACH UNDERTAKING AS PRESCRIBED IN SBD I.T.B. 15.1
19 LITIGATION HISTORY (ITB clause 4.3 (j)) Attach Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount as prescribed in SBD. ATTACH AFFIDAVIT AS PRESCRIBED IN SEC-2 ON & AFTER DATE OF TENDER
20 PROPOSED METHODOLOGY AND PROGRAMME OF CONSTRUCTION (ITB clause 4.3 (1) & 4.5(B)(a) The proposed methodology and programme of construction, backed with equipment planning and deployment, duly supported broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones . ATTACH DESCRIPTIONS,DRAWINGS AND CHARTS AS NECESSARY
21 TECHNICAL PERSONNEL (ITB clause 4.5 B(b)) AS PER SEC-2-1.6 OF SBD ATTACH NECESSARY CERTIFICATE AND CURRENT AIIFIDAVIT OF BOTH EMPLOYEE AND EMPLOYER ON AND AFTER DATE OF TENDER
22 LIST OF KEY PLANTS & EQUIPMENTS (ITB clause 4.5 B(a)) AS PER SEC 2-1.5 OF SBD MAX. AGE 5 YEARS ATTACH OWNED VOUCHER/CASH MEMO/INVOICE AND AFFIDAVIT IN CASE OF LEASED/HIRE ON AND AFTER DATE OF TENDER
Note Evaluation will be done as per SBD , NIT Clauses & the information provided in the document attached with tender. Bidder may Disqualify, if documents are not attached properly. Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
SUMMARY OF BILL OF QUANTITY
Construction of Flexible Pavement ,Pre-Cast RCC Drain and Solar Street Light at IA Murliganj
Sl No. Item of Work Amount (in Cr)
1 Construction of Flexible Pavement 49110249.00
1 Construction of Pre-cast RCC Drain (Section1000 mm x 1800mm) - 0.00
2 ROAD TYPE :-- DRAIN D4 & CROSS DRAIN #REF!
2 ROAD TYPE :-- Outer Road East Side 3.75 m #REF!
3 HUME PIPE EXTERNAL DRAIN #REF!
2 Construction of Pre-cast RCC Drain (Section1200 mm x 2000mm) 20297790.00
3 Solar Street Light 4794230.00
4 Construction of Safety & Disaster Risk Reduction Cell 13898216.00
Total Amount Rs. 88,100,485.00
BILL OF QUANTITY
Construction of Flexible Pavement
Total Length of Road 1500 Meter 274.3902439 220.328
Sl No SOR Description Unit Quantity Rate Amount
SUB-BASES, BASES & BITUMINOUS
1 3.16 RCD22 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller) Cum 18540.00 205.50 3809970.00
2 3.18 RCD22 Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, trasporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 cum 3174.00 207.80 659557.20
3 4.01 B RCD22 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
(ii) Rate per cum or grading -II Material Cum 2925.00 1,060.80 3102840.00
4 4.14B RCD22 Wet Mix Macadam- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Cum 1750.00 1,447.30 2532775.00
5 5.01 A.ii RCD22 Prime Coat :- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Sqm 7000.00 43.00 301000.00
6 5.02 (i) RCD22 Tack Coat :-- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Sqm 7000.00 14.30 100100.00
7 5.04B RCD22 Dense Graded Bituminous Macadam Grading. II:-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Cum 350.00 10,071.10 3524885.00
8 5.05B RCD22 Bituminous concrete Grading -II Providing and laying bituminous Concrete with higher capacity batch type Hot Mix Plant using crushed aggregates of specified grading premixed with bitumius binder @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respect. cum 210.00 11677.00 2452170.00
9 11.79(ii) BCD22 Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength,thickness & size/shape, made by table vibratory method , to attain superior smooth finish using PU or equivalent moulds, laid in required Grey colour & pattern over 80mm thick compacted bed of coarse sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath,parks,lawns, drive ways or light traffic parking etc. all complete as per manufacturer’s specifications & direction of Engineer -in-Charge: (b) 80 mm thick c.c. paver block of M-35 grade with white colour design and pattern Sqm 4500.00 906.10 4077450.00
10 8.02(ii) RCD22 Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408
(ii) PCC M20 for kerb cast in situ RM 2000.00 245.00 490000.00 , , 1,00.00 45
10 Carriage of Materials
A GSB (Seikhpura , 211 Km by Road) Cum 3937.05 2419.02 9523802.69
B WMM,(Koderma, 430 km by Railway) Cum 2467.50 2426.36 5987043.30
C Stone Chips, (Koderma, 430 km by Railway) Cum 1534.00 2426.36 3722036.24
D Coarse sand, (Banka 137 km by Road) Cum 74.03 1067.99 79057.96
E Bitumen (Baruni 156 km by Road) MT 68.67 1037.23 71226.58
F Emulsion (Baruni 156 km by Road) MT 5.60 1037.23 5808.49
Add Seigniorage charge @10% on Basic Material Cost
E Kerb Stone Chips Cum 164.500 899.46 14796.12
F Kerb Coarse Sand Cum 74.03 494.00 3656.84
Seigniorage Cost 575001.72
Addition of CGST @9% on RCD Item with carriagei.e on "A" 3665189.02
Addition of SGST @9% on RCD Item with carriage i.e on A 3665189.02
Add Cess @1% on "A+CGST+SGST" 480547.01
Grand Total Rs. 49110249.23
ABSTRACT OF COST
CONSTRUCTION OF PRE CAST RCC DRAIN ( Width = 1000 mm , Depth = 1800 mm ) - 1000 M
Sr No SOR Item No. Description Total Quantity Rate (Rs.) Amount (Rs.)
1 15.01 RCD-22 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Cum 0.00 140.16 0.00
2 15.03 RCD-22 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification Cum 0.00 266.40 0.00
3 11.72 BCD-22 Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I Sqm 0.00 283.30 0.00 #DIV/0! #DIV/0!
4 12.04 RCD-22 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Cum 0.00 3792.20 0.00
5 15.11 RCD-21 Plain /Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications.
H RCC Grade M35
Case I RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump Cum 0.00 5910.60 0.00
6 15.12.D Plain/ Reinforced cement concrete for wall & slab etc. complete as per Drawing and Technical specification
RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump Cum 0.00 6716.50 0.00
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. mt 0.00 78579.90 0.00
8 8.29 Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. m 0.00 1265.90 0.00
9 Carriage of Materials
A Stone chips, Cum 0.00 2426.36 0.00
B Coarse Sand Cum 0.00 1067.99 0.00
C Bricks 8 km per Th. 0.00 942.53 0.00
D Local Sand, 3km Cum 0.00 249.20 0.00
E Steel, 5Km MT 0.00 532.61 0.00
Total Rs "A" 0.00 0.00
10 Add Seigniorage charge @10% on Basic Material Cost
A Stone chips, Cum 0.00 886.00 0.00
B Coarse Sand Quil Cum 0.00 494.00 0.00
C Bricks 8 km per Th. 0.00 5128.00 0.00
D Local Sand Cum 0.00 141.85 0.00
Addition of CGST @9% on RCD Item i.e on Rs.50837503.37 0.00
Addition of SGST @9% on RCD Item i.e on Rs.50837503.37 0.00
Add Cess @1% on (RCD Items+SGST+CGST) 0.00
Say Amount Rs. In Cr- A 0.00
BILL OF QUANTITY
CONSTRUCTION OF PRE CAST RCC DRAIN ( Width = 1200 mm , Depth = 2000 mm ) -1000 M
Sr No SOR Item No. Description Total Quantity Rate (Rs.) Amount (Rs.)
1 15.01 RCD-22 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Cum 2538.00 140.16 355726.00
2 15.03 RCD-22 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification Cum 162.00 266.40 43157.00
3 11.72 BCD-22 Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I Sqm 1080.00 283.30 305964.00
4 12.04 RCD-22 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Cum 81.00 3792.20 307168.00
5 15.11 RCD-22 Plain /Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications.
H RCC Grade M35
Case I RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump Cum 270.00 5910.60 1595862.00
6 15.12.D Plain/ Reinforced cement concrete for wall & slab etc. complete as per Drawing and Technical specification
RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump Cum 687.00 6716.50 4614235.50
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. mt 86.13 78579.90 6768087.00 86130
8 8.29 Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. m 67.00 1265.90 84815.30
9 # Carriage of Materials
A Stone chips Cum 934.20 2426.36 2266705.51
B Coarse Sand Cum 467.10 1067.99 498858.13
C Bricks 8 km per Th. 34.83 942.53 32828.32
D Local Sand, 3km Cum 210.92 249.20 52562.26
10 # Add Seigniorage charge @10% on Basic Material Cost
A Stone chips, Cum 934.20 886.00 82770.12
B Coarse Sand Quil Cum 467.10 494.00 23074.74
C Bricks 8 km per Th. 34.83 5128.00 17860.82
D Local Sand Cum 210.92 141.85 2991.96
Seigniorage Cost 126697.64
Addition of CGST @ 9 % on RCD Item i.e on "A" 1500135.52
Addition of SGST @ 9 % on RCD Item i.e on "A" 1500135.52
Add Cess @ 1% on (RCD Items+SGST+CGST) 196684.43
Total Rs. 20297789.51
SOLAR STREET LIGHT
1 M/R Supply, Installation,Testing and Commissioning of integarted Solar LED street light fitting "All in one " with MPPT charge controller including providing solar panel 50/60 watt ,26watt LED light 12.8V ,45/50 AH lige PO4 battery with battery charger ,controller in unit interconnection etc .as required (120-175 Lum/watt ) -make approved of BSR Electrical. Each 72 47205.53 3398798.16
2 Analysis of BSR Supply and errection of 6 meter height Hot-DIP Galvanized octagonal street light pole with top dia 70mm and bottom dia A/F 130MM, made of 3mm thick sheet along with base plate of size 220x220x12mm, small door opening for junction box mounting cement concrete of 1:3:6 including excavation, refilling and suitable size foundation bolt with template and all complete job as required (But without pole collar). (Analysis by BSR (Elect.)-2022, 2302, 9009, 9006, 9001 & BCD-2022 Civil-2.8.1, 5.9.1, 4.1.2, 5.22.7A, 5.227A) Each 72 19381.00 1395432.00
TOTAL 4794230.16
BIHAR INDUSTRIAL AREA DEVLOPMENT AUTHORITY
Construction of Safety & Disaster Risk Reduction Cell
BILL OF QUANTITY
Sl No SOR Description Unit Quantity Rate Amount
22 2.8.1 Earthwork in excavation in foundation trenches or drains(not exceding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. Cum. 313.18 ₹ 360.70 ₹ 112,964.03
23 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. Cum. 330.83 ₹ 287.30 ₹ 95,046.02
24 11.72 Providing designation 100A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. Sqm. 258.63 283.30 ₹ 73,269.88
25 323 Separation Membrane of impermeable plastic sheeting 125 micron thick Sqm. 143.99 ₹ 12.00 ₹ 1,727.88
26 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level. 1:3:6(1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Cum. 26.77 ₹ 3,434.00 ₹ 91,928.18
27 5.33A.1+5.33B.1 Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete. Add or deduct for providing richer or leaner mixes respectively at all floor levels. Providing M-25 grade R.C.C. instead of M-20 grade R.C.C. Cum. 50.00 ₹ 4,921.40 ₹ 246,070.00
28 6.1C +6.1.14C Brick work with fly ash bricks as per IS 12894(2002) & IS 3495 in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand) Cum. 3.69 ₹ 4,923.00 ₹ 18,165.87
29 6.1C +6.1.14C +6.3C Brick work with fly ash bricks as per IS 12894(2002) & IS 3495 in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand). Extra for Brick work in superstructure above plinth level upto floor V cum. Cum. 60.00 ₹ 5,765.20 ₹ 345,912.00
30 6.45.2 Half brick masonry with non modular fly ash bricks of class designation 10, conforming IS :12894, in superstructure above plinth and upto floor V level. Cement mortar 1 : 4 (1 cement : 4 coarse sand) Sqm. 127.93 ₹ 700.80 ₹ 89,650.89
31 5.33A.2.2 + 5.33B.1 Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete.All works above plinth level upto floor V level.Beams, planth beams, girders, bressumers, contilevers, Suspended floors lintels roofs and staircases including spiral staircases, shelves etc. Add or deduct for providing richer or leaner mixes respectively at all floor levels.Proiding M-25 grade R.C.C. instead of M-20 grade R.C.C. Cum. 80.00 5841.70 ₹ 467,336.00
32 5.33A.2.1 + 5.33B.1 Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete Walls columns, pillars, posts cind struts Proiding M-25 grade R.C.C. instead of M-20 grade R.C.C. Cum. 12.80 ₹ 5,458.00 ₹ 69,862.40
33 11.26.1 Kota stone slab flooring over 20 mm (average ) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete . Base with 1:1:1 (1 lime : 1 surkhi: 1 coarse sand ) / 1:4 (1 cement: 4 coarse sand ) (20 to 25 mm thick) Sqm. 112.68 ₹ 1,252.70 ₹ 141,154.24
34 11.27 Kota stone slabs 20mm thick in risers of steps skirting. Dado & pillars laid on 12mm average thick cement mortar 1:3 (1 cement: 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete. Details of cost for 10 sqm. Sqm. 18.69 ₹ 1,191.80 ₹ 22,274.74
35 11.41.2 Providing and laying vitrified floor tiles in different sizes( thickness to be specified by the manufacturer) with water absorption's less than 0.08% and conforming to IS: 15622 of approved make in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 coarse sand) including grouting the joint with white cement and matching pigments etc, complete. Size of Tile 60X60cm Sqm. 120.00 ₹ 1,638.80 ₹ 196,656.00
36 11.46.2 Providing and laying vitrified floor tiles in different sizes( thickness to be specified by the manufacturer) with water absorption's less than 0.08% and conforming to IS: 15622 of approved make in all colours and shades, laid on 12mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand) including grouting the joint with white cement and matching pigments etc, complete. Size of Tile 600X600mm. Sqm. 11.42 ₹ 1,191.80 ₹ 13,610.36
37 11.38 Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturer) of ist quality conforming to IS : 15622 of approved make in colours such shades except white , Ivory , Grey , Fume Red , Brown , laid on 20 mm thick Cement motar 1:4 (1 cement: 4 coarse sand) including pointing the joints with white cement and matching pigment etc., complete. Sqm. 26.00 ₹ 862.40 ₹ 22,422.40
38 11.36 Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS : 15622 (Thickness to be specified by the manufacture) of approved make in all colours, shades except burgundy , bottle green , black of any size as approved by Engineer-in-charge in skirting , risers of steps and dados over 12 mm thick bed of cement Motar 1:3(1 cement: 3 coarse sand ) and jointing with grey cement slurry @ 3.3 kg per sqm including pointing in white cement mixed with pigment of matching shade complete. Sqm. 92.93 ₹ 795.00 ₹ 73,879.35
39 8.13.1 Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. Sqm 5.27 ₹ 3,605.20 ₹ 18,981.38
40 13.11.4 12 mm cement plaster of mix ; 1:6 (1 cement : 6 coarse sand) Sqm. 600.85 ₹ 141.50 ₹ 85,020.77
41 13.24.2 6 mm cement mix plaster of mix 1:4 (1 cement : 4 coarse sand) Roof Sqm. 342.53 ₹ 125.60 ₹ 43,021.77
42 13.13.4 20mm plaster 1:6 (1 cement : 6 coarse sand) Sqm. 440.69 ₹ 192.10 ₹ 84,656.07
43 22.8.1 Providing and laying integral cement based water proofing treatment.With average thickness of 120 mm and minimum thickness at khurras point to be 65 .. including prepatation of surface as required for treatment of roofs, balconies , terraces etc, consisting of following operations. Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with proprietary water -proofing compound cleaning the surface before treatment, (b) Laying cement concrete using broken bricks / brick bats 25 mm to 100 mm size with 50 % of cement mortar 1:5 (1 cement: 5 coarse sand ) admixed with proprietary water proofing compound conforming to IS : 2645 over 20 mm thick layer of cement mortar of mix 1:5 (1 cement: 5 coarse sand ) admixed with proprietary water froofing compound conforming to IS 2545 to reuired slope and treating similary the adjoining walls upto 300 mm height including rounding of junctions, or walls ad slabs. After two days of proper curing applying a secoung coat of cement slurry admixed with proprietary water proofing compound conforming to IS : 2645. Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement: 4 coarse sand ) admixed with Sqm. 140.00 ₹ 850.70 ₹ 119,098.00
44 5.9.1 Centring and shuttering including strutting, proping etc. and removal of form for foundation, footings, bases of columns etc. for mass concrete Sqm. 129.28 ₹ 211.60 ₹ 27,355.65
45 5.9.5 Centring and shuttering including strutting, proping etc. and removal of form for Lintels, beams, plinth bams, griders, bressumers and contilevers. Sqm. 500.00 ₹ 404.70 ₹ 202,350.00
46 5.9.6 Centring and shuttering including strutting , Propping etc. and removal of form for columns, pillars, piers, abutments, posts and struts. Sqm. 200.00 ₹ 494.40 ₹ 98,880.00
47 5.9.3 Centering and shuttering including strutting , propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platform. Sqm. 300.00 ₹ 437.50 ₹ 131,250.00
48 5.9.7 Centering and shuttering including strutting , propping etc. and removal of form for Stairs,(excluding landings) except spiral-staircaces. Sqm. 28.82 ₹ 439.90 ₹ 12,679.68
49 13.80 A.2 Providing and applying white cement based putty of average thickness 2 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. Sqm. 1041.54 ₹ 105.40 ₹ 109,778.42
50 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) Sqm. 1041.54 ₹ 137.00 ₹ 142,691.12
51 13.78.2 Applying one coat of cement primer of approved brand and manufacture on wall surface: Distemper primer Sqm. 943.38 ₹ 38.70 ₹ 36,508.94
52 13.77A.1 Distempering with oil bound washa ble distemper of approved brand and manufacture to give an even shade . Two or more coats on new work Sqm. 943.38 ₹ 53.80 ₹ 50,754.03
53 13.81.1 Applying priming coat with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and softwood) Sqm. 23.94 ₹ 39.70 ₹ 950.42
54 13.81.3 Applying priming coat with ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel work Sqm. 38.88 ₹ 34.60 ₹ 1,345.25
55 13.93.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work Sqm. 62.82 ₹ 84.50 ₹ 5,308.29
56 9.6.3 Providing and fixing 35 mm thick factory made laminated veneer lumber door shutter conforming to IS : 14616 and TADS 15:2001 (Part B), including ISI marked M.S.pressed butt hinges bright finished of required size with necessery screws, all complete as per directions of Engineer-in- Charge and panelling with panels of:12 mm thick prelaminated (with decorative lamination on one side and balancing lamination on other side) particle board Grade -1 medium density flat pressed, three layer and graded (FPT-1) conforming to IS :3087 bonded with BWP type synthetic resin adhesive as per IS :848 and prelamination conforming to IS :12823 Grade-1 Type I Sqm. 11.97 ₹ 2,894.90 ₹ 34,651.95
57 9.1.2 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Sal Wood Cum. 0.52 ₹ 95,670.70 ₹ 49,748.76
58 9.117.1 24 mm thick factory made PVC door shutters made of styles and rails of a uPVC hollow section of size 59x24 mm and wall thickness 2 mm (± 0.2 mm) with inbuilt edging on both sides. The styles and rails mitred and joint at the corners by means of M.S. galvanised/plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 20x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of ‘H’ section, a uPVC hollow section of size 100x24 mm and 2 mm (± 0.2 mm) wall thickness, fixed to the shutter styles by means of plastic/galvanised M.S. ‘U’ cleats. The shutter frame filled with a uPVC multichambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness. The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer’s specification and direction of Engineer-incharge. (For W.C. and bathroom door shutter). Sqm. 12.29 ₹ 1,629.00 ₹ 20,012.27
59 9.1.2 Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance ±1mm), with wall thickness 2.0 mm (± 0.2 mm), corners of the door frame to be Jointed with galvanized brackets and stainless steel screws, joints mitred and plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 X 19 mm and 1 mm (± 0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer’s specification and direction of Engineer-in-charge. Extruded section profile size 42x50 mm m 24.90 ₹ 251.80 ₹ 6,269.82
60 21.1.2.2 For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron) Kg 51.03 ₹ 480.20 ₹ 24,504.61
61 21.3.2 Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5.50 mm thickness(weight not less than 12.50 kg/sqm) Sqm. 1.44 ₹ 1,115.10 ₹ 1,605.74
62 21.1.1.2 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / aneling,C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : For fixed portion: Powder coated aluminium (minimum thickness of powder coating 50 micron) Kg 42.00 ₹ 418.40 ₹ 17,572.80
63 9.66.1 Providing and fixing M.S.handles with necessary screws etc.complete125 mm Each 20.00 ₹ 32.40 ₹ 648.00
64 9.101.2 Providing and fixing alluminium hanging floor door stopper anodised (anodic coating not less than grade AC 10 as per IS :1868) transparent or dyed to required colour and shade with necessary screws etc. complete:Twin rubber stopper Each 8.00 ₹ 60.80 ₹ 486.40
65 9.147E.1 Providing and fixing factory made uPVC white colour sliding glazed window above 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads, uPVC extruded interlocks and uPVC extruded Inline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy (white powder coated) handle on one side of extreme panel along with zinc plated mild steel multi point locking having transmission gear with keeps, zinc alloy (white powder coated) touch lock with hook (if required for wire mesh panel), stainless steel (SS 304 grade) body with adjustable double nylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes, wire mesh and silicon sealent shall be paid separately). Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Sqm. 35.00 ₹ 7,239.10 ₹ 253,368.50
66 9.48.2 Providing and fixing M.S. grills of requirement pattern in frames of windows etc. with M.S. flats square or round bars etc all complete fixed to steel windows Fixed to openings/ wooden frames with rawl plugs screws etc For all floor Kg 622.08 ₹ 161.10 ₹ 100,217.09
67 9.62.1 Providing and fixing ISI marked oxidised M.S. sliding door bolts with nuts and screws etc. complete :300x16mm Each 24.00 ₹ 169.00 ₹ 4,056.00
68 9.63.1 Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete:250x10 mm Each 24.00 ₹ 70.10 ₹ 1,682.40
69 9.63.3 Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete:150x10 mm Each 24.00 ₹ 48.40 ₹ 1,161.60
70 10.17 Providing and fixing M.S.fan clamp type I or II of 16 mm dia.M.S. bar bent to shape with hooked ends in R.C.C slabs during laying including painting the exposed portion of loop,all as per standard design complete. Each 30.00 ₹ 174.60 ₹ 5,238.00
71 5.22 Reinforcement for RCC work including straightening, cutting, bending, placing in position and bonding all complete. TMTC-500
72 4.17 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20mm nominal size ) over 75mm bad by dry brick ballast 40mm nominal size well rammend and consolidated and grouted with fine sand including finishing the top smooth. Sqm. 70.67 ₹ 436.60 ₹ 30,853.98
73 10.36 Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes,channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts,fasteners etc.). Kg 121.33 ₹ 546.80 ₹ 66,342.70 51750
74 20.3A.1 BCD-22 Making 25 cm (10'') dia bore up to 4 mtr below ground with hand auger of approved quality in ordinary soil(vide classification of soil item - A) true to plum and without eccentricity in any stage of opration and disposal of the excavated earth up to 50 m lead including all lifts all complete as per approved design and direction of E/I. mtr 684.630 178.30 ₹ 122,069.53 ₹ 13,898,216.00
75 5.1.2 BCD-22 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work up to Plinth level.1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 20mm nominal size) Cum 104.332 4688.30 489139.72
76 5.2.2 BCD-22 Providing and laying in position specified grade of Reinforced cement concrete work in wall (any thickness),including attached pilasters, buttresses, plinth and string coursed, fillets, columns, pillars, piers, abutments, posts and struts, etc. Up to floor five level excluding cost of centring, shuttering, finisnin and reinforcement.1:1:5:3 (1 cement :1.5 coarse sand 0.3 graded stone aggregate 20mm nominal size) Cum 40.000 5670.00 226800.00
77 5.3 BCD-22 Reinforced cement concrete work in beams, suspended floors,roofs having slope up to 15, landings, balconies, shelves,chajjas,lintels, bands,plain window sills,staircases and spiral stair cases up to floor five levl excluding the cost of centring, shuttering, finishing and reinforement with 1:2:4(1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) Cum 37.500 5335.90 200096.25
78 6.1.12/1+6.3A BCD-22 Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1 .:4 (1 cement: 4 coarse sand ) Cum 339.390 5860.10 1988859.34
79 13.11.2 BCD-22 Cement plaster in coarse sand 12 mm Cement plaster of mix.1:4(1 cement : 4 coarse sand) Sqm 4020.000 152.90 614658.00
80 13.79.1 BCD-22 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade.New work (three or more coats). Sqm 4020.000 81.20 326424.00
81 10.32 BCD-22 Steel work welded in built up sections/framed worK including cutting hoisting, rixing in position and applying a priming coat of approved steel primer using structural steel, etc. as required.
10.32.1 In stringers, treads landings etc. of stair cases including use of required plates wherever required all complete. Kg 500.000 104.00 52000.00 ₹ 0.00
82 10.43 BCD-22 Providing and fixing concertina coil fencing with panched concertina coil 600 mm dia 10 mtr. Openable length (total length 90 metre) having 50 no round per 6 metre length, up to 3 metre hight of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. Reinforced wire, stud tied with G.I. steples and G.I clip to retain horizontal, including necessary bolts or G.I. barbed wire tide to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/sq mm with tape (.52 mm thick) and weight 43.478 gm/metre (Cost of M.S. Angle, C.C. blocks shall be paid separately) mtr 120.000 272.60 32712.00
Total Cost "A" 9529153.82
Carriage Cost ₹ 1,408,504.44
84 Addition of Seigniage @ 10% on materials
Coarse sand Cum 178.80 494 ₹ 8,832.72
Stone Chips Cum 211.59 886 ₹ 18,746.87
Local Sand Cum 334.18 141.85 ₹ 4,740.34
GST on Total Cost (A) @ 5.36% ₹ 510,762.64
Total Cost "B" ₹ 11,513,657.47
85 1.3.3 Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit with modular switch , modular plate, suitable size G.I. box etc as required.
Group C Point 90.00 724 ₹ 65,160.00
86 1.7.2 Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire Meter 120.00 161 ₹ 19,320.00
87 1.5 Wiring for light/ power plug plug with 2 X 4 sq. mm FR PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit along with 1 Nos 4 sq. mm FR PVC insulated copper conductor single core cable for loop earthing as required. Meter 50.00 309 ₹ 15,450.00
88 1.7 Wiring for circuit/ submain wiring alongwith earth wire with the following sizes of FR PVC insulated copper conductor, single core cable in surface/ recessed medium class PVC conduit as required. ₹ 0.00
(a) 1.7.11 4 X 6 sq. mm + 1 X 6 sq. mm earth wire Meter 125.00 410 ₹ 51,250.00
(b) 1.7.4 2 X 6 sq. mm + 1 X 6 sq. mm earth wire Meter 50.00 422 ₹ 21,100.00
89 1.21 Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required. ₹ 0.00
90 1.22 Supplying and fixing metal/ PVC box of following sizes (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including painting etc as required. ₹ 0.00
91 1.27.1 Supplying and fixing following size/ modules, GI box along with modular base and cover plate for modular switches in recess etc as required.1 or 2 Module (75mmX75mm Each 10.00 234 ₹ 2,340.00
92 1.32 Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess including providing and fixing 6 pin 5/6 & 15/16 amps modular socket outlet and 15/16 amps modular switch, connection etc. as required. Point 15.00 531 ₹ 7,965.00
93 2.19 Supplying and fixing 20 amps, 240 volts, SPN industrial type, socket outlet, with 2 pole and earth, metal enclosed plug top alongwith 20 amps "C" curve, SP MCB, in sheet steel enclosure, on surface or in recess, with chained metal cover for the socket outlet and complete with connections, testing and commissioning etc. as required. Each 0.00 1513 ₹ 0.00
94 2.29 Supplying and fixing TPN sheet steel enclosure on surface/ recess along with 25/32 amps 415 volts, "C" curve TPN MCB complete with connections, testing and commissioning etc. as required. Each 2.00 1616 ₹ 3,232.00
95 2.30 Supplying and fixing TPN sheet steel enclosure on surface/ recess along with 63 amps 415 volts, "C" curve TPN MCB complete with connections, testing and commissioning etc. as required. Each 2.00 2431 ₹ 4,862.00
96 1.24.4 Supplying and fixing following modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required. 3 pin , 5/6 amps socket outlet Each 90.00 112 ₹ 10,080.00
97 1.26 Supplying and fixing modular blanking plate on the existing modular plate & switch box but excluding modular plate as required. Each 10.00 34 ₹ 340.00
Main Panel & DB's ₹ 0.00
98 2.8.9 Supplying and fixing following way single pole & 2 + 12 way, Double door neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus-bar,earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) Each 2.00 1315 ₹ 2,630.00
99 2.32 Supplying and fixing Cable end box (Loose wire box, IP43) suitable for following single pole and neutral, sheet steel, MCB distribution board, 240/415 V, on surface /recess complete with testing and commissioning etc. as required. ₹ 0.00
2.32.4 For 4 way, Double door TPN MCBDB Each 2.00 1064 ₹ 2,128.00
MAIN PANEL & SUBMAIN PANEL ₹ 0.00
101 2.4 Providing and fixing following rating and breaking capacity MCCB in existing cubicle panel board including drilling holes in cubicle panel, making connections etc. as required. ₹ 0.00
(b) 2.4.2 ii) 100 Amp, 16 KA FP 415 volt MCCB each 2.00 3254 ₹ 6,508.00
(c) 2.12.5 iii) 32 Amp TPN MCB 415 Volt each 2.00 1108 ₹ 2,216.00
(d) 2.12.6 iv) 40 Amp TPN MCB 415 Volt each 2.00 1487 ₹ 2,974.00
(e) 2.12.7 v) 63 Amp TPN MCB 415 Volt each 2.00 1635 ₹ 3,270.00
(f) 2.12.2 vi) 6/32 Amp SPN MCB 240 Volt each 2.00 511 ₹ 1,022.00
(g) 1830+ana xi) Copper strip of all sizes. kg. 12.00 776 ₹ 9,312.00
(h) 8.10.6 xii) Digital ammeter three phase each 2.00 1643 ₹ 3,286.00
(i) 8.10.4 xiii) Digital voltmeter three phase each 2.00 1337 ₹ 2,674.00
(j) 2318+ana xiv) Pilot lamp for indicator each 6.00 212 ₹ 1,272.00
102 2.20 Providing and fixing M.V. danger notice plate of 200 mm X 150 mm, made of mild steel at least 2 mm thick, vitreous enameled white on both sides, and with inscription in single red colour on front side as required. Each 1.00 214 ₹ 214.00
EARTHING ₹ 0.00
103 3.4 Earthing with G.I. earth plate 600 mm X 600 mm X 6 mm thick including accessories, and providing masonary enclosure with cover plate having locking arrangement and watering watering pipe 2.7 metre long etc. with charcoal/ coke and salt as required. Set 1.00 6323 ₹ 6,323.00
104 3.11 Supplying and laying 25 mm X 5 mm G.I. strip in 40 mm dia G.I. pipe from earth electrode, including connection with G.I. nut, bolt, spring, washer excavation and refilling etc. as required. Meter 40.00 721 ₹ 28,840.00
105 3.16 Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing etc. as required. Meter 50.00 53 ₹ 2,650.00
106 4.1 Providing and fixing lightning conductor finial, made of 25 mm dia 300 mm long, copper tube, having single prong on top, with 85 mm dia 3 mm thick copper base plate including holes etc. complete as required. Each 1.00 1056 ₹ 1,056.00
107 4.8 Providing and fixing G.I. tape 20 mm X 3 mm thick on parapet or surface of wall for lightning conductor complete as required. ( For vertical run) Meter 50.00 145 ₹ 7,250.00
108 4.9 Fixing of copper / G.I. tape 20 mm X 3 mm thick on parapet or surface of wall for lightning conductor complete as required. ( For horizontal run) Meter 50.00 52 ₹ 2,600.00
109 4.4 Jointing copper/ G.I. tape ( with another copper/ G I tape, base of the finial or any other metallic object ) by riverting/ nut bolting sweating and soldering etc. As required. Each 5.00 81 ₹ 405.00
110 4.12 Providing and fixing testing joint, made of 20 mm X 3 mm thick G.I. strip, 125 mm long, with 4 nos. of tinned G.I. bolts, nuts, chuk nuts and spring washers etc. complete as required. Each 5.00 102 ₹ 510.00
SUPPLY & INSTALLATION OF FIXTURES ₹ 0.00
111 8.11.2 Supply and installation of regular/ standard model A.C. ceiling fan of 1200 mm sweep including wiring the down rods of standard length (upto 30 cm) with 1.5 sq. Each 15.00 1618 ₹ 24,270.00
112 1.25 Supplying and fixing stepped type electronic fan regulator on the existing modular plate/ switch box including connections but excluding modular plate etc. as required. Each 15.00 358 ₹ 5,370.00
113 8.11.4 Supply and installation of 300 mm, 230 v A.C. Exhaust fan in the existing opening including making good the damage, connection testing, commissioning etc as required. Each 6.00 1483 ₹ 8,898.00
114 8.11.5 Supply and installation of 375 mm, 230 v A.C. Exhaust fan in the existing opening including making good the damage, connection testing, commissioning etc as required. Each 0.00 3543 ₹ 0.00
115 8.11.7 Supply and installation of 400 mm, 230 v A.C. wall/cabin fan including fixing the bracket, making connection, testing, commissioning etc as required. Each 5.00 2427 ₹ 12,135.00
116 5.14 Supplying and fixing 4' X 40 watt suspended type LED luminaire provides soft-light and glare free symmetrical illumination complete with all accessories etc. including ball and socket arrangement, 2 no. down rods of 20mm dia X 1.6 mm thick G.I. pipe upto 30 cm. length, painting and wiring the down rods and connection with 1.5 sq mm FR PVC insulated copper conductor, single core cable and earthing etc. as required. Each 15.00 4949 ₹ 74,235.00
117 5.10.3 Supplying and fixing indoor recess mounting 36 watt LED flat panel luminaire suitable for armstrong / grid ceiling and complete with electronic driver etc. directly on false ceiling including connection with 1.5 sq.mm FR PVC insulated copper conductor cable and earthing the body etc. as required. Each 10.00 4023 ₹ 40,230.00
118 5.11.4 Supplying and fixing recess mounted 12 watt LED vertical downlighter complete with all accessories and replaceable electronic driver, directly on false ceiling including connection with 1.5 sq.mm FR FR PVC insulated copper conductor cable and earthing the body etc. as required. Each 5.00 971 ₹ 4,855.00
119 5.11.5 Supplying and fixing recess mounted 18 watt LED vertical downlighter complete with all accessories and replaceable electronic driver, directly on false ceiling including connection with 1.5 sq.mm FR PVC insulated copper conductor cable and earthing the body etc. as required. Each 5.00 1066 ₹ 5,330.00
120 1.33 Supplying and fixing 2 pin, 6 amp ceiling rose on the existing junction box/ wooden block including connection etc as required. Each 10.00 64 ₹ 640.00
121 1.34 Supplying and fixing batten/ angle holder including connection etc. as required. Each 15.00 80 ₹ 1,200.00
122 6.1 Supplying and fixing of following types lamp in the existing electrical fitting/ fixtures etc. as required. ₹ 0.00
Plumbing a) Scheduled Items
123 B.S.R 12.78.2 Providing and fixing on wall face unplastidsed PVC (working pressure 4 kgf per sqm) rain water pipes conforming to IS:4985 including jointing with seal ring conforming to IS:5382 leaving 10 mm gap for thermal expansion.
110 mm diameter. metre 40.00 257.5 ₹ 10,300.00
124 B.S.R 17.2.1 Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid Each 2.00 4230 ₹ 8,460.00
125 B.S.R 17.1.1 Providing and fixing water closet squatting pan (Indian type W.C.pan ) with 100 mm sand cast Iron P or S trap, 10 litre low fixtures complete, including cutting and making good the walls andlevel white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and floors wherever required :White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Each 3.00 4470.9 ₹ 13,412.70
126 17.4 Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : 0.0 0.00 0.0 ₹ 0.00
17.4.1 One urinal basin with 5 litre white P.V.C. automatic flushing cistern Each 3.00 3723.2 ₹ 11,169.60
127 B.S.R 17.28.2.1 Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.Flexible pipe 32 mm dia Each 3.00 104.4 ₹ 313.20
128 17.33 Providing and fixing 600 x 120 x 5 mm glass shelf with edges round off, supported on anodised aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. Each 3.00 713.3 ₹ 2,139.90
129 B.S.R 18.9.2 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement ,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge. 20 mm nominal outer dia Pipes metre 20.00 205.3 ₹ 4,106.00
130 B.S.R 18.8.1 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes joining of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of E/I. Concealed work including cutting chases and making good the wall etc. 15 mm nominal outer dia Pipes metre 30.00 278.2 ₹ 8,346.00
131 B.S.R 18.9.3 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 25 mm nominal inner dia Pipes metre 60.00 294.7 ₹ 17,682.00
132 B.S.R 18.48 Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI :12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. per litre 1000.00 9.7 ₹ 9,700.00
133 B.S.R 18.52.1 Providing and fixing C.P. brass stop cock (concealed of standard design and of approved make conforming to IS : 893115 mm nominal bore. Each 5.00 594.8 ₹ 2,974.00
134 B.S.R 19.2.2 Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design : 150 mm diameter S.W. pipe metre 30.00 494.4 ₹ 14,832.00
135 19.2.4 250 mm diameter S.W. pipe metre 15.00 666.5 ₹ 9,997.50
136 B.S.R 19.6.2 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete: 150 mm dia R.C.C. pipe metre 30.00 410.7 ₹ 12,321.00
138 B.S.R 19.27.1 Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame complete as per standard design : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 5.00 3743.3 ₹ 18,716.50
139 B.S.R 19.2.4 Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design : 250 mm diameter S.W. pipe Metre 25.00 666.5 ₹ 16,662.50
140 B.S.R 19.29.1 Constructing brick masonry road gully chamber 110x50x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame and vertical grating complete as per standard design : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 4.00 7186.6 ₹ 28,746.40
141 B.S.R 19.30.1.1 Contructing brick masonry chamber for Underground C.I. Inspection Chamber and bend with 75 class designation bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. Cover with frame (light duty) 455x610 mm internal dimentions, total weight of cover with frame to be not less than 38 kg. (weight of cover 23 kg. and weight of frame 15 kg.) RCC top slab with 1:1.5:3 mix (1 cement: 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) foundation concrete 1:5:10 mix (1 cement:5 coarse sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm th. with cement mortar 1:3 (1cement:3 coarse sand) finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design. Inside dimensions 466x610 mm and 45cm deep for single pipe line : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 4.00 4266.8 ₹ 17,067.20
142 B.S.R 19.32.1 Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with brick and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Each 2.00 33603.4 ₹ 67,206.80
143 B.S.R 19.34.1 Providing and fixing S.W. intercepting trap in manholes with stiff mixture of cement mortar 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete : ₹ 0.00
144 17.70.2 Providing and fixing PTMT Bottle Trap for Wash basin and sink.Bottle trap 38 mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 263 gms Each 12.00 325.10 ₹ 3,901.20
145 17.73.1 Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour.450 mm long towel rail with total length of 495 mm,78 mm wide and effective height of 88 mm, weighing not less than 170 gms Each 9.00 397.30 ₹ 3,575.70
146 17.74 Providing and fixing PTMT shelf 440 mm long, 124 mm width and 36 mm height of approved quality and colour, weighing not less than 300 gms. Each 9.00 430.70 ₹ 3,876.30
147 18.18.1 Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete :15 mm nominal bore Each 9.00 348.90 ₹ 3,140.10
148 18.47 Providing and fixing G.I. Union in existing G.I. pipe line, cutting and threading the pipe and making long screws, including excavation,refilling the earth or cutting of wall and making good the same complete wherever required : ₹ 0.00
18.47.5 40 mm nominal bore Each 6.00 633.40 ₹ 3,800.40
149 18.65 Providing and fixing PTMT soap Dish Holder having length of 138mm,breadth 102mm, height of 75mm with concealed fitting arrangements,weighing not less than 106 gms. Each 8.00 96.80 ₹ 774.40
150 18.12.5 Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.. 40 mm dia nominal bore metre 110.00 476.80 ₹ 52,448.00
151 18.10 Providing and fixing G.I. pipes complete with G.I. fittings and clamps, i/c cutting and making good the walls etc.
18.10.5 40 mm dia nominal bore metre 40.00 589.20 ₹ 23,568.00
Non Scheduled Item
(a) 152 Providing and fixing of Hindware counter wash basin of size 430X130 mm cat no 91069 with C.I Brackets 15 mm C.P brass pillar taps 32 mm C.P Brass waste of standard pattern including painting and bracket cutting and making good the wall (oval Shape) Each 8.00 4500.00 ₹ 36,000.00
(b) Providing and fixing bottle trap (with internal partition) 32mm size with 250 mm & 190mm long wall connection pipes & wall flange Jaquar make, Cat. No. 769 all complete inclusive of taxes and royalty all complete as per companys specification and direction of Engineer-in-charge. Each 8.00 1400.00 ₹ 11,200.00
(c) Providing and fixing C.P. brass pebble bib cock with wall flange bib Tap faucet (wall mount installation type)of Model Parryware G3004A1 or equivalent conforming to IS standards Each 8.00 850.00 ₹ 6,800.00
(d) Providing and fixing mirror of superior glass (of approved quality) and of required shape and size without frame of make st gobein or approved as per E/I with 6 mm thick hard board backing : Rectangular shape sqmt 8.00 1350.00 ₹ 10,800.00
(e) Provding and fixing soil,waste and vent pipes P.V.C. PIPE
DOOR TEE 110 mm dia Each 30.00 320 ₹ 9,600.00
DOOR BEND 110 mm dia Each 30.00 280 ₹ 8,400.00
VENT COWEL 110 mm dia Each 20.00 55 ₹ 1,100.00
PIPE CLIP 110 mm dia Each 20.00 50 ₹ 1,000.00
FLOOR TRAP 110X110 mm dia Each 20.00 380 ₹ 7,600.00
153 Construction of Septic Tank Each 1.00 85000 ₹ 85,000.00
154 Manual Boring Each 1.00 65023 ₹ 65,023.00
AIRCONDITIONING WORK
155 MR 1.5 tone 5 star,5 year comprehensive warrantyinverter split AC 4 in 1 adjustable mode/energy efficient/high ambient cooling cools even at 52*c/anti dust filter with anti- microbial/coopper coil. Nos 6 38130.00 228780.00
156 MR 2 tone 5 star with 5 year comprehensive warranty,Ai powered,5 in 1 convertible cooling 4 way air swing,heavy duty cooling inverter split AC copper coil Nos 4 46213.00 184852.00
Total Amount "F" 413632.00
Furniture Works
157 Table with side unit return Table Size(1500x750x750)mm & Side runner Size (750x400x750jmm. Table made of 25mm thk pre lam particle board with edge banding Table top supported with side panel & fron panel. Kyeboard tray & cpu trolly. Table top with wire manager & interchangable side runner with foed pedestal of 3 drawers. Phenol bond using in Pre-Laminated Particle Board & Edge band thickness will be start from 2mm for Top & Imm for rest parts Our PLPB certified from ISI grade & Termite, Borer & Fungus resistance laminated outside in selected color & inside (Non Visible Part) will be balancing white. 100% European design & texture & 100% Product Consistency, fade resistance lamination best International Technology. The Materials/Organization shall be certified 150-9001, ISO-14001, 150-50001, 180-45001, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base, Indian Design Mark certified, Trade Mark Certified, GREEN GUARD by UL GREEN PRO, SEFA,, AIOTA, FSC should be issued from SCS Global Services USA, PEFC, GRIHA & IGBC Nos 2 40800 81600
158 High Back Chair - Chair Size (L) 600mm X (D) 660mm X (H) 1,275mm. Back & seat cover cushion chair uphlostered in fabric. Syncro mechenism with |locking system and five star chrome base with nylon casters. Seat & Back |made up of 14mm thick boiling water proof plywood os ISI303. Chair rotates a |full 360 degree in either direction for ease of motion. Standard on every executive with task chair & controls rate and ease with which chair reclines to |different weight and strengths of users. Quick and easy adjustment regulated |height of chair relative to floor. Back reclines at A 2-to-1 ratio to the seat. 5% post consumed recycled content & 30% total recycled content. The Materials/Organization shall be certified ISO-9001, ISO- 14001, ISO-50001, ISO-45001, all ISO Certificates should be Issued from NABCB Accelerated |Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base , Indian Design Mark certified, Trade Mark Certified, GREEN GUARD by UL, GREEN PRO, SEFA, , AIOTA, FSC should be Issued from Scs Global Nos 2 9800 19600.00
159 Visitor Chair - Chair Size (w)595mm X (D)510mm X(H)875mm. Multi purpose fixed chair, Metal frame, PU Padding on armrest. Cushion upholstery in leatherette with four leg metal legs with matt finish. The Materials/Organization shall be certified ISO-900 1, ISO-14001, ISO-50001. ISO-45001, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base , Indian Design Mark certified, Trade Mark Certified, GREEN GUARD by UL,GREEN PRO, SEFA, , AIOTA, FSC should be Issued from SCS Global |Services USA, PEFC, GRIHA & IGBC. Nos 4 5900 23600.00
160 |2 Seater Sofa- Sofa Size (W) 1410mm X (D)890mm X (H)87Omm. Arm height 620mm, Seat depth 510mm, Back Height 460mm. Frame used is treated LAmerican pine wood with termite free & borer free. Soft & comfortable lcushion with high density and resilient foam. Frame used is Treated american pine wood & the wood used in sofa has been 8% moisture, this prevents the wood from wrapping and bending. all wood used is termite free and borer free. Foam of sofa comfortable cushion with high density and resilent foam. all apholstry materials used in specially designed. all plywood used in MR lGarde. Color-Black/ Brown.The Product Should be Certified Company BIFMA,ISO-50001,Green Guard, Green PRO, AIOTA, IGBC, AGSI,FSC, Indian Design Mark, ISO14001, 18001 & PEFC. Nos 2 20800 41600.00
161 |CUBICAL WORKSTATION -Cubical Workstation SIZE: 15O0L+ 1500X 60ODX 1200HT. 67mm thk Sliding Tile Based Partition. Single Metal raceway cover at skirting level in Partition. Pin up & white board in partition above the tabletop. Table top made of 25mm thk Prelamin particle board with pvc edges. Tabletop supported with l8mm thk side panel Prelaminated Particle Board with Pvc edge banding side. Pedestal of 400Lx 450Dx725 HT (2 drawer CUBICAL WORKSTATION 5 |+ 1filling). .PVC Keyboard Tray ..Metal CPU Trolley. Our PLPB certified from |ISI grade & Termite, Borer & Fungus resistance laminated outside in selected |color & inside (Non Visible Part) will be balancing white. 100% European (1350+1350X60OA1 design & texture & 100% Product Consistency, fade resistance lamination 200)MM best International Technology . The Materials/ Organization shall be certified |ISO-9001, 1SO-14001, 1SO-50001, ISO-45001, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base, Indian Design Mark lcertified, Trade Mark Certified, GREEN GUARD by UL,GREEN PRO, SEFA, AIOTA, FSC should be Issued from SCS Global Services USA, PEFC, GRIHA & IGBC. Nos 4 62800 251200.00
162 Medium Back Chair- Medium Back Chair Size (W)585mm X (D)660mm X (H) 1060mm. • High-quality fabric upholstery with high abrasion-resistance and superior tear strength & colourfastness. • Premium high-density virgin |foam for comfortable seating.• High stability chair with no-tip over, clearing drop test of 102kgs.• Adjustable Lumbar Support for superior back support.• DEFINE/MB 7 8 DWS/oo62 70008/HB Pneumatic Height Lift with BIFMA certified Class IV gas lift. • Synchro Single Locking and Tilt tension control for improved mobility.• Highly durable fixed armrests clearing test of 40,000 cycles.• Nylon base with 55mm castors for |increased stability and non-friction movement.The Materials/ Organization shall be certified ISO-9001, ISO- 14001, ISO-5000 1, ISO-45001, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base , Indian Design Mark certified, Trade Mark Certified, GREEN GUARD by UL,GREEN PRO, |SEFA, , AIOTA, FSC should be Issued from SCs Global Services USA , PEFC, GRIHA & IGBC. Nos 4 8850 35400.00
163 Confrence Table - Conference Table Size (5400x 1200x750) mm. The extendable meeting adds a sense of character to conference rooms. The innovation modular design enables varius configration. An all wood conference table with minimalist look and basic functionality, ideal for meeting room & top comes with 25mm thik pre lam particle board & side panel 18mm thick prelam particle board & 2mm pvc edge banding with modesty given much needed ptimary and close interaction. Phenol bond using in Pre-Laminated Particle Board & Edge band thickness will be start from 2mm for Top & 1lmm for rest parts. Our PLPB certified from ISI grade & Termite, Borer & Fungus resistance laminated outside in selected color & inside (Non Visible Part) will be balancing white. 100% European design & texture & 100% Product Consistency, fade resistance lamination best International Technology. Color-Wenge. The Product Should be Certified Company BIFMA,ISO-50001,Green Guard, Green PRO, „AIOTA, IGBC, AGSI,FSC, Indian Design Mark, ISO14001, 18001 & PEFC. Nos 1 120800 120800.00
164 High Back Chair Chair Size (W)580mm X (DJ670mm X (H) 1255mm. Contemporary Style With A Stately Charm, Bring In The Classy Maestro Office Chair To Suit Your Every Need. Its Classic All-Black Look With Soft Black Fabric Upholstery Makes It An Irresistible Chair. The Deep-Cushioned Back And Seat Conform To The Natural Curvature Of The Spine For Optimum Ergonomnics And Lumbar Support. The Synchro-Single Locking Mechanism Along With The Tilt Tension Control, Lets You Find Your Ergonomic Position With Ease. The Pneumatic Height Adjustment Along With The Adjustable |Headrest And Adjustable Armrest Further Work To Provide Optimum Ergonomic Comfort. A Strong Chrome Base With A 5-Star Cover Supports The |Structure, While The 55Mm Castor Wheels And A 360-Degree Swivel Provide Swift Yet Stable Movement. Get The Maestro Chair And Tackle Your Tasks With Charming Looks And All-Day Support. The Materials/Organization shall be certified ISO-9001, 1SO- 1400 1, IS0-5000 1, ISO-4500 l, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Nos 1 14000 14000.00
165 Medium Back Chair Size (W)585mm X (D)660mm X H)10601mm. • High-quality fabric upholstery with high abrasion-resistance and superior tear strength & colourfastness, • Premium high-density virgin foam for comfortable seating. • High stability chair with no-tip over, clearing drop test of 102kgs.• Adjustable Lumbar Support for superior back support.. |Pneumatic Height Lift with BIFMA certified Class IV gas lift.• Synchro Single DEFINE/MB Terms & Conditions. Validity GST Pavment Terms Delivery Period Locking and Tilt tension control for improved mobility.• Highly durable fixed armrests clearing test of 40,000 cycles.• Nylon base with 55mm castors for increased stability and non-friction movement.The Materials/Organization shall be certified ISO-9001, ISO-14001, ISO-50001, IS0-45001, all ISO Certificates should be Issued from NABCB Accelerated Agency, BIFMA LEVEL 1, BIFMA Membership and BIFMA Compliant product base , Indian Design Mark certified, Trade Mark Certified, GREEN GUARD by UL,GREEN PRO, SEFA, , AIOTA, FSC should be Issued from SCS Global Services USA, PEFC, GRIHA & IGBC. Nos 16 8850 141600.00
Furniture Works"G" 729400.00
Total Cost (B+C+D+E+F+G) ₹ 13,898,216.00
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
ROAD TYPE :-- Crossing Drain
Sl No. Item of Work Amount (in Rs)
As Per Estimate
SUB-BASES, BASES & BITUMINOUS #REF!
CEMENT CONCRETE PAVEMENT , , , 0.00
1 MISCELLANEOUS
D2 :-- RCC CAST IN SITU ROAD SIDE DRAIN #REF!
D2 :-- RCC PRE CAST SLAB DRAIN , , , 0.00
D2 :-- RCC CAST IN SITU ROAD SIDE DRAIN #REF!
Crossing :-- RCC PRE CAST SLAB DRAIN ,99,69,79.00
Total #REF! 21,04,30,38.00
ABSTRACT OF QUANTITY & COST
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Total Length of Road :-- 0.000 m = 0.00 m 304.8780488
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 2.3 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. 12.1
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES & BITUMINOUS
1 3.16 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
0.00 0.00 cum #REF! #REF!
2 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
Below Paver Block 2 0.00 1.560 0.250 0.00
3 4.12 Wet Mix Macadam- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
4 5.1 Prime Coat :- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
5 5.2 Tack Coat :-- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
6 5.6 Dense Graded Bituminous Macadam:-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
7 5.7 Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects
8 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
9 8.20 Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408
Total 0.00 0.00 m #REF! #REF!
SUB-BASES, BASES & BITUMINOUS Rs. #REF!
CEMENT CONCRETE PAVEMENT
3 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
4 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
5 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
6 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D2 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 110.130 m (including Both Side) x 1500 0.000
Construction of Cast in Situ Drain (Both Side) 0.000 m B x D
Average 900 x 1600
Average 2440 x 3440
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 4.190 0.00
6 12.4 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total 0.00 0.00 No. #REF! #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain D2 Starting Ending
(PRE CAST DRAIN) B D B D
Drain Length = 0.000 m B x D
No = 1.00 Say 1.000 No Average 900 x 1600
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.38 C Proving R.C.C. M-35 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.300 0.00
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Total Rs , , , 0.00
Total Precast Drain Total Rs , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D2 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 0.000 m (Only One Side) x 1500
Construction of Cast in Situ Drain (Both Side) 0.000 m B x D
Average 600 x 450
Average 450 x 1650
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.950 0.00
7 12.4 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
8 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total 0.00 0.00 No. #REF! #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain Crossing Starting Ending
(PRE CAST DRAIN) B D B D
Drain Length = 45.000 m B x D 2833
No = 1 Say 1.000 No Average 1000 x 1800
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.400 0.00
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Total Rs ,99,69,79.00
Total Precast Drain = Total Rs ,99,69,79.00
Junior Engineer Asstt. Engineer Executive Engineer
Construction of R.C.C. Box Culvert (1 x 2 x 2) in CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA for the Year 2022-23
0.150 Sand Filling
SALIENT DIMENSIONS
Length of Box 12.00 m
Width of Approch 3.50 m
Sl No SOR Item No. Description No Length Width Height / Thickness Total Quantity Rate Amount
1 12.1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Flexible Apron D/S 1 18.590 6.000 1.050 117.12
Flexible Apron U/S 1 18.590 3.000 1.050 58.56
Total Qty 527.69 cum 140.16 73961.00
2 12.3 Providing Sand filling in foundation trenches.
Cutoff Wall D/S 1 6.306 1.850 0.150 1.75
Cutoff Wall U/S 1 6.306 1.500 0.150 1.42
Apron Flooring 2 10.790 5.000 0.150 16.18
Total Qty 32.91 cum 337.92 11121.00
3 12.8 A Providing P.C.C M15 in foundation
Cutoff Wall form MOST Dwg SD/111 page 37 6.40
Apron Flooring form MOST Dwg SD/111 page 37 11.40
Below Approch Slab 2 12.000 3.500 0.150 12.60
4 13.5 B Providing PCC M-20 in
Wing wall & Return Wall form MOST Dwg SD/113 PAGE 45 99.80
Cutoff Wall form MOST Dwg SD/111 page 37 42.70
5 13.5 B Providing RCC M-20
For Box Culvert form MOST Dwg SD/108 page 11 94.00
6 14.4 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
7 14.2 Providing HYSD reinforcement
For Box Culvert form MOST Dwg SD/108 page 11 5.685
8 14.6 Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Parapet 2 9.600 19.200
9 14.9 Drainage Spouts complete as per drawing and Technical specification (SOR Item No 14.9)
10 15.5 Providing Filter Media
72.60 cum #REF! #REF!
11 15.1 Providing and laying Pitching on Aprons laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
For Flexible Pavement form MOST Dwg SD/111 page 37 85.60
For Apron form MOST Dwg SD/111 page 37 11.40
97.00 cum #REF! #REF!
12 14.10 PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
13 14.11 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
14 13.8 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Junior Engineer Asstt. Engineer Executive Engineer
Name:-- CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
0.500 Abutment Wing Wall
Lowest Bed Level b4 0.10 m B2 2.45 m 2.450
SECTION OF ABUTMENT SECTION OF RETURN WALL
Construction of R.C.C. Culvert (2m x 1.5m )
Sl No SOR Item No. Description No Length Width Height / Thickness Total Quantity Rate Amount
1 12.1 Earthwork in excavation for structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling in trenches with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:--Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Return Wall 4 3.000 2.650 31.80
4 12.8 A P.C.C M15 in foundation :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 13.5 B P.C.C M 20 in Sub Structure :-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Coping over Return Wall 4 3.000 0.500 0.150 0.90
6 14.1 RCC M-25:-- Plain/Reinforced cement concrete in super-structure complete as per drawing and Technical Specifications.
7 14.10 DLC :-- PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
8 14.1 RCC M-25:-- Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
7 14.2 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Deck slab 7.49 m3@ 0.09 t/m3 0.67
Parapet 2.88 m3@ 0.06 t/m3 0.17
Approach slab 0 m3@ 0.06 t/m3 0.00
8 13.8 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
9 13.10 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
10 14.4 RCC M30 in Wearing coat (including reinforcement) :--Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
11 14.18 (ii) Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
12 Providing tarfelt in proper layer between bed plate and deck slab
13 15.1 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
14.04 Cum #REF! #REF!
14 15.4 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
83.52 Cum #REF! #REF!
15 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
41.76 Cum #REF! #REF!
13 3.16 (i) Providing E/W in Filling in Road Embankment.:-- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 30
14 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-I)
Junior Engineer Asstt. Engineer Executive Engineer
Name:-- CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
0.500 Abutment Wing Wall
Lowest Bed Level b4 0.10 m B2 2.63 m 2.630
SECTION OF ABUTMENT SECTION OF RETURN WALL
Construction of R.C.C. Culvert (3m x 2m )
Sl No SOR Item No. Description No Length Width Height / Thickness Total Quantity Rate Amount
1 12.1 Earthwork in excavation for structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling in trenches with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:--Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Return Wall 4 3.000 2.830 33.96
4 12.8 A P.C.C M15 in foundation :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 13.5 B P.C.C M 20 in Sub Structure :-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Coping over Return Wall 4 3.000 0.500 0.150 0.90
6 14.1 RCC M-25:-- Plain/Reinforced cement concrete in super-structure complete as per drawing and Technical Specifications.
7 14.10 DLC :-- PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
8 14.1 RCC M-25:-- Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
7 14.2 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Deck slab 19.44 m3@ 0.09 t/m3 1.75
Parapet 3.24 m3@ 0.06 t/m3 0.19
Approach slab 0 m3@ 0.06 t/m3 0.00
8 13.8 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
9 13.10 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
10 14.4 RCC M30 in Wearing coat (including reinforcement) :--Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
11 14.18 (ii) Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
12 Providing tarfelt in proper layer between bed plate and deck slab
13 15.1 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
19.44 Cum #REF! #REF!
14 15.4 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
117.60 Cum #REF! #REF!
15 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
58.80 Cum #REF! #REF!
16 3.16 (i) Providing E/W in Filling in Road Embankment.:-- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 30
17 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-I)
Junior Engineer Asstt. Engineer Executive Engineer
Name:-- CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
0.500 Abutment Wing Wall
Lowest Bed Level b4 0.10 m B2 2.70 m 2.700
SECTION OF ABUTMENT SECTION OF RETURN WALL
Construction of R.C.C. Culvert (6m x 2m )
Sl No SOR Item No. Description No Length Width Height / Thickness Total Quantity Rate Amount
1 12.1 Earthwork in excavation for structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling in trenches with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:--Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Return Wall 4 3.000 2.900 34.80
4 12.8 A P.C.C M15 in foundation :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 13.5 B P.C.C M 20 in Sub Structure :-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Coping over Return Wall 4 3.000 0.500 0.150 0.90
6 14.1 RCC M-25:-- Plain/Reinforced cement concrete in super-structure complete as per drawing and Technical Specifications.
7 14.10 DLC :-- PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
8 14.1 RCC M-25:-- Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
7 14.2 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Deck slab 35.64 m3@ 0.09 t/m3 3.21
Parapet 4.32 m3@ 0.06 t/m3 0.26
Approach slab 0 m3@ 0.06 t/m3 0.00
8 13.8 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
9 13.10 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
10 14.4 RCC M30 in Wearing coat (including reinforcement) :--Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
11 14.18 (ii) Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
12 Providing tarfelt in proper layer between bed plate and deck slab
13 15.1 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
35.64 Cum #REF! #REF!
14 15.4 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
117.60 Cum #REF! #REF!
15 15.5 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
58.80 Cum #REF! #REF!
16 3.16 (i) Providing E/W in Filling in Road Embankment.:-- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 30
17 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-I)
Junior Engineer Asstt. Engineer Executive Engineer
0 to 760 1520 Both
Total Length taken 0.00 m 1.00 m 0.100 Sand
Abstract of Quantity & Cost for Repair & Risaning of Drain Wall
Sl No SOR Item No. Description No Length Width Height / Thickness Sub Quantity Total Quantity Rate Amount
1 12.5 Brick masonary in 1:3 cement mortar:-- Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Total Brick masonary in CM 1:4 Qty 0.00 cum 7114.99 0.00
2 13.3 Plastering with cement mortar (1:3) 12mm Thick:-- Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Total Plastering with CM 1:3 Qty 0.00 Sqm 168.77 0.00
Total Cost Rs , , , 0.00
Abstract of Quantity & Cost for Construction of Drain Cover
1 13.5 B Providing R.C.C. M-20 as cover slab:-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Total RCC M20 Qty 0.15 cum 9040.25 1356.00
2 14.2 Providing HYSD Bars :-- Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Steel Reinforcedment @ 90kg.Per cum of Reinforce concrete of slab cover
Total Cost of One No Cover Rs 2750.00
Cost of 0 No Drain Cover Size ( 1m x 1.00m ) Rs. = 0 No 0.00
Total Cost of 0m Drain & 0 No of Cover Rs , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
DRAIN (D4 & CROSS DRAIN)
Sl No. Item of Work Amount (in Rs)
As Per Estimate
SUB-BASES, BASES & BITUMINOUS #REF!
CEMENT CONCRETE PAVEMENT , , , 0.00
1 MISCELLANEOUS
D3 :-- RCC CAST IN SITU ROAD SIDE DRAIN #REF!
D4 :-- RCC PRE CAST DRAIN #REF!
D2 :-- RCC CAST IN SITU ROAD SIDE DRAIN #REF!
D2 :-- RCC PRE CAST SLAB DRAIN , , , 0.00
Total #REF! 21,04,30,38.00
ABSTRACT OF QUANTITY & COST
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Total Length of Road :-- 0.000 m = 0.00 m 304.8780488
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 2.3 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. 12.1
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES & BITUMINOUS
1 3.16 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
0.00 0.00 cum #REF! #REF!
2 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
Below Paver Block 0 0.00 2.950 0.250 0.00
3 4.12 Wet Mix Macadam- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
4 5.1 Prime Coat :- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
5 5.2 Tack Coat :-- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
6 5.6 Dense Graded Bituminous Macadam:-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
7 5.7 Semi-Dense Bituminous Concrete:- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects
8 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Total 0.00 0.00 m #REF! #REF!
SUB-BASES, BASES & BITUMINOUS Rs. #REF!
CEMENT CONCRETE PAVEMENT
3 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
4 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
5 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
6 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D3 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 0.000 m (Only One Side) x 1500 0.000
Construction of Cast in Situ Drain (Both Side) 0.000 m B x D
Average 1000 x 600
Average 1200 x 1200
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 3.100 0.00
6 12.4 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total 0.00 0.00 No. #REF! #REF!
At Every 9m Inteval 2 0.00 / 9 0.00
Total 0.00 0.00 m #REF! #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain D4 Starting Ending
(PRE CAST ) B D B D
Total Length of Drain (Pre Casted & Precast Slab) = 750 x 950.00 750 x 1500
Drain Length = 0.000 m B x D
No = 0 Say 1.000 No Average 1200 x 2000
Average 1200 x 1200
Cross Drain = 0 m
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Cross Drain 1 0.00 2.000 2.750 0
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Cross Drain 1 0.00 2.000 0.150 0
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Cross Drain 1 0.00 2.000 0.00
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Cross Drain 1 0.00 2.000 0.075 0
5 12.8 F Proving R.C.C. M-35 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.700 0.00
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
At Every 9m Inteval 0 0.00 / 9 0.00
Total 0.00 0.00 m #REF! #REF!
Total Precast Slab Drain 1 No Total Rs #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D2 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 0.000 m (Only One Side) x 1500
Construction of Cast in Situ Drain (Both Side) 0.000 m B x D
Average 600 x 450
Average 450 x 1650
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.950 0.00
7 12.4 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
8 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total 0.00 0.00 No. #REF! #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D2 Starting Ending
(PRE CAST SLAB) B D B D
Drain Length = 0.900 m B x D
No = 0 Say 0.000 No Average 600 x 450
Average 450 x 1650
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.90 1.950 1.76
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Total Rs , 3,78,99.00
Total Precast Slab Drain 0 No Total Rs , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
ROAD TYPE :-- Outer Road East Side
Sl No. Item of Work Amount (in Rs)
As Per Estimate
SUB-BASES, BASES & BITUMINOUS #REF!
CEMENT CONCRETE PAVEMENT , , , 0.00
2 MISCELLANEOUS
D2 :-- RCC CAST IN SITU ROAD SIDE DRAIN #REF!
D2 :-- RCC PRE CAST SLAB DRAIN , , , 0.00
ABSTRACT OF QUANTITY & COST
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Total Length of Road :-- 0.00 m 304.8780488
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 2.3 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES & BITUMINOUS
1 3.16 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
0.00 0.00 cum #REF! #REF!
2 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
3 4.12 Wet Mix Macadam- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
4 5.1 Prime Coat :- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
5 5.2 Tack Coat :-- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
6 5.6 Dense Graded Bituminous Macadam:-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
6 5.11 Mix Seal Surface :- Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
SUB-BASES, BASES & BITUMINOUS Rs. #REF!
CEMENT CONCRETE PAVEMENT
3 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
4 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
5 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
6 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00 #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D2 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 0.000 m (Only One Side) x 1500
Construction of Cast in Situ Drain (Both Side) 0.000 m B x D
Average 600 x 450
Average 450 x 1650
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.950 0.00
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
8 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total 0.00 0.00 No. #REF! #REF!
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D2 Starting Ending
(PRE CAST SLAB) B D B D
Drain Length = 0.900 m B x D
No = 0 Say 0.000 No Average 600 x 450
Average 450 x 1650
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.90 1.950 1.76
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Total Rs , 3,96,18.00
Total Precast Slab Drain 0 No Total Rs , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
#REF! 0.00 0 m Both Side
0.00 0.00 0 m Both Side 0.500 m
0.00 0.00 - 0 m Both Side 0.750 m
0.00 0.00 - 0 m Both Side 1.025 m
Total Length taken 0.00 m 1.00 m 0.100 Sand
Abstract of Quantity & Cost for Construction of Drain
Sl No SOR Item No. Description No Length Width Height / Thickness Sub Quantity Total Quantity Rate Amount
1 12.1 Earth work in excavation of foundation trenches :-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Total Qty 0.00 cum 140.16 0.00
2 12.3 Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Total 0.00 cum 337.92 0.00
3 13.5 B Providing PCC M-20 :-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Total P.C.C grade M-20 Qty 0.00 cum 9040.25 0.00
4 12.3 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
3 MOST SOR Brick Flat Soling in Foundation & Flooring :-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Total 0.00 sqm 287.00 0.00
4 13.5 B Providing PCC M-20 :-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Total P.C.C grade M-20 Qty 0.00 cum 9040.25 0.00
5 12.5 Brick masonary in 1:4 cement mortar:-- Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Total Brick masonary in CM 1:4 Qty 168.75 cum 7114.99 1200655.00
6 13.3 Plastering with cement mortar (1:3) 12mm Thick:-- Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Total Plastering with CM 1:3 Qty 900.00 Sqm 168.77 151893.00
Total Cost Rs 26,60,76,62.00
Abstract of Quantity & Cost for Construction of Drain Cover
1 13.5 B Providing R.C.C. M-20 as cover slab:-- Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
Total RCC M20 Qty 98.44 cum 9040.25 889900.00
2 14.2 Providing HYSD Bars :-- Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Steel Reinforcedment @ 90kg.Per cum of Reinforce concrete of slab cover
Total Cost of One No Cover Rs , , , 0.00
Cost of 0 No Drain Cover Size ( 1m x 1.00m ) Rs. = 0 No/m , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
ROAD TYPE :-- Road No-3
Sl No. Item of Work Amount (in Rs)
As Per Estimate
EARTH WORK AND EROSION CONTROL , , , 0.00
SUB-BASES, BASES , , , 0.00
CEMENT CONCRETE PAVEMENT , , , 0.00
2 MISCELLANEOUS
RCC ROAD SIDE DRAIN , , , 0.00
Total , , , 0.00
ABSTRACT OF QUANTITY & COST
Based on RCD SOR 01/04/2014
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Total Length of Road :-- 420.00 m 533.5365854
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
EARTH WORK AND EROSION CONTROL
1 2.3 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
2 3.16 Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
Subgrade and Earthen Shoulders , , , 0.00
3 3.18 Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 2.134146341
Brick Soling 1 0.00 0.125 , , , 0.00
E/W Excavation Qty from Drain -1398.6
EARTH WORK AND EROSION CONTROL Rs. , , , 0.00
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES
4 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
SUB-BASES, BASES Rs. , , , 0.00
CEMENT CONCRETE PAVEMENT
5 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
6 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
7 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
8 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D5 Starting Ending
For Road Side Drain B D B D
Average 1200 x 1000
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.8 A P.C.C grade M-15 Nominal mix 1:2:4:-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 70.00
Total Rs 7,49,25,81.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D6 Starting Ending
For Road Side Drain B D B D
Average 1500 x 1200
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.8 A P.C.C grade M-15 Nominal mix 1:2:4:-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 64.00
Total Rs 8,08,19,78.00
Junior Engineer Asstt. Engineer Executive Engineer
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
ROAD TYPE :-- Road No-4
Sl No. Item of Work Amount (in Rs)
As Per Estimate
EARTH WORK AND EROSION CONTROL , , , 0.00
SUB-BASES, BASES , , , 0.00
CEMENT CONCRETE PAVEMENT , , , 0.00
2 MISCELLANEOUS
RCC ROAD SIDE DRAIN (BOTH SIDE) , , , 0.00
RCC ROAD CROSS DRAIN , , , 0.00
RCC ROAD SIDE DRAIN EXTRA , , , 0.00
Total , , , 0.00
ABSTRACT OF QUANTITY & COST
Based on RCD SOR 01/04/2014
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Total Length of Road :-- 0.00 m 274.3902439
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
EARTH WORK AND EROSION CONTROL
1 2.3 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
2 3.16 Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
Subgrade and Earthen Shoulders , , , 0.00
3 3.18 Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 2.134146341
Brick Soling 1 0.00 0.125 , , , 0.00
E/W Excavation Qty from Drain , , , 0.00
EARTH WORK AND EROSION CONTROL Rs. , , , 0.00
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES
4 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
SUB-BASES, BASES Rs. , , , 0.00
CEMENT CONCRETE PAVEMENT
5 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
6 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
7 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
8 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D3 Starting Ending
For Road Side Drain B D B D
Both Side 0.00 m = 0.000 m
Average 750 x 1225
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.8 A P.C.C grade M-15 Nominal mix 1:2:4:-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total Rs , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain Starting Ending
For Road Crossing B D B D
Average 750 x 1225
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.8 A P.C.C grade M-15 Nominal mix 1:2:4:-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Total Rs , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain D4 Starting Ending
For Road Side Drain Extra B D B D
Average 900 x 1475
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.8 A P.C.C grade M-15 Nominal mix 1:2:4:-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
5 12.8 C Proving R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
Total Rs , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
ABSTRACT OF COST FOR ROAD & DRAIN WORKS
ROAD TYPE :-- 7 m Width
Sl No. Item of Work Amount (in Rs)
As Per Estimate
CLEARING AND GRUBBING ROAD & DISMANTLING OF C.C. PAVEMENT , , , 0.00
SUB-BASES, BASES & BITUMINOUS 19,32,97,70.00
2 MISCELLANEOUS
D2 :-- RCC CAST IN SITU ROAD SIDE DRAIN , , , 0.00
D2 :-- RCC PRE CAST SLAB DRAIN , , , 0.00
ABSTRACT OF QUANTITY & COST
Based on RCD SOR 01/04/2021 1198
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
ROAD TYPE :-- 7 m Width
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Amount (Rs.) 548.093
CLEARING AND GRUBBING ROAD & DISMANTLING OF C.C. PAVEMENT 159.528
1 2.3 Clearing and Grubbing Road Land . 423.716
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. CLEARING AND GRUBBING ROAD LAND . 235.393
0 1000.00 7.620 0.00 DISMANTLING OF CEMENT CONCRETE PAVEMENT 379.636 2396.722
2 2.6 Dismantling of Cement Concrete Pavement 32.35
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately 16.175
CLEARING AND GRUBBING ROAD & DISMANTLING OF C.C. PAVEMENT Rs. , , , 0.00
#REF! #REF! #REF!
#REF! #REF! #REF!
SUB-BASES, BASES & BITUMINOUS
1 3.16 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
2 3.18 Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 2.134146341
3 4.2 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2):-- Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(GSB GR-II)
Below Paver Block 1 1000.00 4.700 0.250 1175.00
4 4.12 Wet Mix Macadam- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5 5.1 Prime Coat :- Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
6 5.2 Tack Coat :-- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
7 5.6 Dense Graded Bituminous Macadam:-- Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
8 5.05 B Bituminous concrete Grading -II Providing and laying bituminous Concrete with higher capacity batch type Hot Mix Plant using crushed aggregates of specified grading premixed with bitumius binder @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complete in all respect.
9 11.79.2 Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength,thickness & size/shape, made by table vibratory method , to attain superior smooth finish using PU or equivalent moulds, laid in required Grey colour & pattern over 80mm thick compacted bed of coarse sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath,parks,lawns, drive ways or light traffic parking etc. all complete as per manufacturer’s specifications & direction of Engineer -in-Charge: (b) 80 mm thick c.c. paver block of M-35 grade with white colour design and pattern.
10 8.20 Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408
SUB-BASES, BASES & BITUMINOUS Rs. 19,32,97,70.00
CEMENT CONCRETE PAVEMENT
4 6.1 Dry Lean Cement Concrete Sub- base :-- Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
5 6.2 Cement Concrete Pavement:-- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
6 TEC Brick Edge Soling:-- Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
7 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Same Area as above 0.00
CEMENT CONCRETE PAVEMENT Rs. , , , 0.00 19329770.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Drain & Cover D2 Starting Ending
(CAST IN SITU) B D B D
Total Length of Drain (Cast in Situ & Precast Slab) = 0.00 m (including Both Side)
Construction of Cast in Situ Drain (Both Side) 0.00 m B x D
Average 1000 x 600
Average 2440 x 2440
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Total Quantity Rate (Rs.) Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 12.8 C R.C.C. M-20 drain :-- Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 4.340 0.00
6 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
7 M R Providing M.S. grating in drain ----all comp. job
At Every 6m Inteval 0.00
8 8.29 Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.
At Every 9m Inteval 4 0.00 / 9 0.00
Total Rs , , , 0.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Rectangular RCC Cover Drain Starting Ending
(PRE CASTED ) D3 B D B D
Drain Length B x D
0.000 D3 Average 1200 x 2000
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 15.11 H Plain /Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications. (RCC Grade M35)
6 15.12. D Plain/ Reinforced cement concrete for wall & slab etc. complete as per Drawing and Technical specification (RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump )
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.400 0.00
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
8 8.29 Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.
At Every 9m Inteval 1 0.00 / 9.0 0.00
Total Rs , , , 0.00
Drain Length B x D 2550
No = 1.000 Say 1.00 0.000 D2 Average 0 x 1800
600.000 D4 Average 1000 x 1600
Sr No SOR Item No. Description No Length (M) Width (M) Thickness (M) Sub Quantity Amount (Rs.)
1 12.1 Earth work in excavation in foundation:-- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
2 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
3 TEC Brick Flat Soling:-- Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
4 12.4 PCC 1:3:6 in Foundation:-- Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
5 15.11 H Plain /Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications. (RCC Grade M35)
6 15.12. D Plain/ Reinforced cement concrete for wall & slab etc. complete as per Drawing and Technical specification (RCC Grade M35 using batching plant ,transit mixture & and Concrete Pump )
6 11.19 Chequered terrazo tiles 22 mm thick with marble chips of sozes upto 6mm in floors jointed with neat cement slurru mixed with pigement to match the shade of the tiles,including rubbing and polshing complete on 20 mm thick bed of cement mortar 1:4 (1 cement:4 coarse sand)
Light shade using white cement 0.00 1.500 0.00
7 12.40 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
8 8.29 Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.
At Every 9m Inteval 1 600.00 / 9 67.00
Total Rs 9,76,07,58.00
Total Precast Slab Drain 1 No Total Rs , , , 0.00
Junior Engineer Asstt. Engineer Executive Engineer
Qty Calculation of Road & Drain
SOR Iteam No Material Unit Qty of Road No-1 with Drain D1 Qty of DRAIN D2,D3 Total Road Qty No-1,2,3 & 4 With Drain
Road No-1 & 4 D1 D1 Pre Cast Road No-2 & 3 D3 D2 Pre Cast D2 D3 Pre Cast
4.2 GSB Cum #REF! 0.00 #REF!
4.9 WMM Cum #REF! 0.00 #REF!
5.2 Prime Coat Sqm #REF! 0.00 #REF!
5.3 Tack Coat Sqm #REF! 0.00 #REF!
5.6 DBM Cum #REF! 0.00 #REF!
5.7 SDBC Cum #REF! 0.00 #REF!
12.3 Local Sand Cum #REF! #REF! 0.00 0.00 0.00 11.48 #REF!
TEC BFS Sqm #REF! #REF! 0.00 0.00 0.00 76.50 #REF!
12.4 HYSD Bar MT #REF! #REF! 0.00 0.00 0.00 5.78 #REF!
SOR Iteam No Material Unit Qty Drain D4 & CROSS DRAIN Qty of Road No-6 with Drain Total Road Qty No-5 & 6 With Drain
Road No-5 D3 D4 & CROSS Pre Cast D2 D2 Pre Cast Road No-6 D2 D2 Pre Cast
5.2 Prime Coat Sqm 0.00 0.00 0.00
5.3 Tack Coat Sqm 0.00 0.00 0.00
SOR Iteam No Material Unit Total Road Qty No-1,2,3 & 4 With Drain Total Road Qty No-5 & 6 With Drain Total Road Qty With Drain
4.2 GSB Cum #REF! 0.00 #REF!
4.9 WMM Cum #REF! 0.00 #REF!
5.2 Prime Coat Sqm #REF! 0.00 #REF!
5.3 Tack Coat Sqm #REF! 0.00 #REF!
5.6 DBM Cum #REF! 0.00 #REF!
5.7 SDBC Cum #REF! 0.00 #REF!
12.3 Local Sand Cum #REF! 0.00 #REF!
TEC BFS Sqm #REF! 0.00 #REF!
12.4 PCC 1:3:6 Cum #REF! 0.00 #REF!
12.8 C RCC M20 Cum #REF! 0.00 #REF!
12.4 HYSD Bar MT #REF! 0.00 #REF!
SUMMARY OF 5 YEARS MAINTENANCE COST
NAME OF ROAD:- Construction of Flexible Pavement ,Pre-Cast RCC Drain and Solar Street Light at IA Murliganj
Particulars Amount in Rs.
1st Year Maintenance cost ,19,25,60.00 1 % LC & 12 % GST
2nd Year Maintenance cost ,23,28,83.00
3rd Year Maintenance cost ,35,44,75.00
4th Year Maintenance cost ,43,44,42.00 7.33
5th Year Maintenance cost ,51,44,61.00
Total Cost of 5 years Maintenance 1,72,88,21.00 0.8796
ESTIMATE FOR 5 YEARS MAINTENANCE WORKS
Multiplying factor for 15-45 CVPD 1.25
For more than 45 CVPD 1.5 1.25
Reference Operation Manual Annexure 14.4 and Engineer in chief letter no.2498 dated 20.11.2007
Total Length Of Road = 1000 m
Length Of the Flexible Pavement = 1000 m
Length Of the Regid Pavement = 0 m
Width Of the Road (Br) = 7 m
Width Of the Shoulder (Bs) = 1.5 m
No. Of Hume Pipe Culvert = 0 Nos
No. Of Slab Culvert = 0 Nos
Length of Drain= 600.0 m
Multiplying Factor for Commercial Vehicle 15 to 45 per days = 1.25 {ref. – Annexure 14.4 operation Manual from Rural Road}
Sl. No. SOR No. Description of Items Unit % Taken Yearly Estimated Qty. Rate (Rs.) Amount (Rs.)
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 6.0% 67.50 1602.66 ,10,81,80.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 10.0% 375.00 223.55 , 8,38,31.00
3 15.5 Repair of Pot holes filled with 75 mm WMM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 600.00 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 10.0% 0.10 1213.69 , , 1,21.00
10 15.11 Maintenance of 200 m and km stones Km 12.0% 0.12 697.82 , , ,84.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 2.00 127.08 , , 2,54.00
(ii) Cutting of shrubs from roadway No. - 10.00 7.81 , , ,78.00
(iii) Trimming of grass and weeds Sqm 18.0% 4.50 2.60 , , ,12.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For First Year Maintenance Work Rs. ,19,25,60.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 7.2% 81.00 1602.66 ,12,98,15.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 12.0% 450.00 223.55 ,10,05,98.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 10412.00 , , , 0.00
4 15.6 Maintenance of Earthen Drains M - 600.00 3.12 , ,18,72.00
5 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
6 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
7 15.9 Maintenance of Road signs Km 12.0% 0.12 1213.69 , , 1,46.00
8 15.11 Maintenance of 200 m and km stones Km 15.0% 0.15 697.82 , , 1,05.00
9 15.12 (I)Cutting of branches of trees and shrubs No. - 2.00 127.08 , , 2,54.00
(ii) Cutting of shrubs from roadway No. - 10.00 7.81 , , ,78.00
(iii) Trimming of grass and weeds Sqm 22.5% 5.63 2.60 , , ,15.00
10 Maintenance of Already Planted Trees for Second Year No. 0.00 647.00 , , , 0.00
10 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Second Year Maintenance Work Rs. ,23,28,83.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 8.4% 94.50 1602.66 ,15,14,51.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 14.0% 525.00 223.55 ,11,73,64.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.0% 87.50 116.67 , 1,02,09.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 4.38 11462.30 , 5,01,48.00 28.969
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 2.19 10412.00 , 2,27,76.00 36.2109
6 15.6 Maintenance of Earthen Drains M - 600.00 3.12 , ,18,72.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.15 1213.69 , , 1,82.00
10 15.11 Maintenance of 200 m and km stones Km 18.0% 0.18 697.82 , , 1,26.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 2.00 127.08 , , 2,54.00
(ii) Cutting of shrubs from roadway No. - 10.00 7.81 , , ,78.00
(iii) Trimming of grass and weeds Sqm 22.5% 5.63 2.60 , , ,15.00
12 Maintenance of Already Planted Trees for Third Year No. 0.00 554.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Third Year Maintenance Work Rs. ,35,44,75.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 9.6% 108.00 1602.66 ,17,30,87.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 16.0% 600.00 223.55 ,13,41,30.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.5% 131.25 116.67 , 1,53,13.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 6.56 11462.30 , 7,52,21.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 3.28 10412.00 , 3,41,64.00
5 15.6 Maintenance of Earthen Drains M - 600.00 3.12 , ,18,72.00
6 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
7 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
8 15.9 Maintenance of Road signs Km 15.0% 0.15 1213.69 , , 1,82.00
9 15.11 Maintenance of 200 m and km stones Km 18.0% 0.18 697.82 , , 1,26.00
10 15.12 (I)Cutting of branches of trees and shrubs No. - 2.00 127.08 , , 2,54.00
(ii) Cutting of shrubs from roadway No. - 10.00 7.81 , , ,78.00
(iii) Trimming of grass and weeds Sqm 22.5% 5.63 2.60 , , ,15.00
11 Maintenance of Already Planted Trees for Fourth Year No. 0.00 492.00 , , , 0.00
11 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Forth Year Maintenance Work Rs. ,43,44,42.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 10.8% 121.50 1602.66 ,19,47,23.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 18.0% 675.00 223.55 ,15,08,96.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 2.0% 175.00 116.67 , 2,04,17.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 8.75 11462.30 ,10,02,95.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 4.38 10412.00 , 4,55,53.00
6 15.6 Maintenance of Earthen Drains M - 600.00 3.12 , ,18,72.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.15 1213.69 , , 1,82.00
10 15.11 Maintenance of 200 m and km stones Km 24.0% 0.24 697.82 , , 1,67.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 2.00 127.08 , , 2,54.00
(ii) Cutting of shrubs from roadway No. - 10.00 7.81 , , ,78.00
(iii) Trimming of grass and weeds Sqm 37.5% 9.38 2.60 , , ,24.00
12 Maintenance of Already Planted Trees for Fifth Year No. 0.00 492.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Fifth Year Maintenance Work Rs. ,51,44,61.00
Qty Calculation of Road & Drain
SOR Iteam No Material Unit Total Road Qty With Drain GSB Coarse Sand Aggregate Bitumen/Emulsion Cement Steel Local Sand Brick
Factor Qty in Cum Factor Qty in Cum Factor Qty in Cum Factor Qty in mt Factor Qty in mt Factor Qty in mt Factor Qty in Cum Factor Qty in Nos
5.2 Prime Coat Sqm 7,000.00 0.00060 4.20 Emulsion
12.3 Local Sand Cum 162.00 1.200 194.40
15.12 D RCC Grade M35 using batching plant Cum 687.00 0.45 121.50 0.90 243.00 0.344 92.88
Sl No Material Unit Qty QUARRY Distance Carriage Amount Total Amount
3 Aggregate Cum , ,13,69.50 Jamalpur 192.00 3,796.24 5,19,89,51.00
4 Bitumen/Emulsion MT , , ,68.67 Barauni 114.00 1,583.80 ,10,87,60.00
CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
From : Jamalpur
Stone Dust Coarse Sand
From : Jamalpur From : Quil
Lead : 220.00 Km Lead : 148 Km
Cement & Steel WORK SITE Stone Boulder
From : Local CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA From : Jamalpur
Lead : 5 Km Lead : 220 Km
Stone Aggregate / Chips Emulsion
From : Jamalpur From : Barauni
Lead : 192 Km Lead : 114 Km
* Subjected to Verification of Lead
Junior Engineer Asstt. Engineer Executive Engineer
SUMMARY OF 5 YEARS MAINTENANCE COST
NAME OF ROAD:- #REF!
DRAIN (D4 & CROSS DRAIN) 0.000 Km
Particulars Amount in Rs.
1st Year Maintenance cost , , , 0.00 1 % LC & 12 % GST
2nd Year Maintenance cost , , 3,44.00
3rd Year Maintenance cost , , 3,44.00
4th Year Maintenance cost , , 3,44.00 7.33
5th Year Maintenance cost , , 3,44.00
Total Cost of 5 years Maintenance , , , 0.00 0.8796
ESTIMATE FOR 5 YEARS MAINTENANCE WORKS
Multiplying factor for 15-45 CVPD 1.25
For more than 45 CVPD 1.5 1.25
Reference Operation Manual Annexure 14.4 and Engineer in chief letter no.2498 dated 20.11.2007
Total Length Of Road = 0 m
Length Of the Flexible Pavement = 0 m
Length Of the Regid Pavement = 0 m
Width Of the Road (Br) = 7 m
Width Of the Shoulder (Bs) = 0.6 m
No. Of Hume Pipe Culvert = 0 Nos
No. Of Slab Culvert = 0 Nos
Length of Drain= 110.13 m
Multiplying Factor for Commercial Vehicle 15 to 45 per days = 1.25 {ref. – Annexure 14.4 operation Manual from Rural Road}
Sl. No. SOR No. Description of Items Unit % Taken Yearly Estimated Qty. Rate (Rs.) Amount (Rs.)
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 6.0% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 10.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WMM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 110.13 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 10.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 12.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 18.0% 0.00 2.60 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For First Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 7.2% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 12.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 110.13 3.12 , , 3,44.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 12.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 15.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Second Year No. 0.00 647.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Second Year Maintenance Work Rs. , , 3,44.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 8.4% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 14.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 11462.30 , , , 0.00 28.969
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 10412.00 , , , 0.00 36.2109
6 15.6 Maintenance of Earthen Drains M - 110.13 3.12 , , 3,44.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Third Year No. 0.00 554.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Third Year Maintenance Work Rs. , , 3,44.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 9.6% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 16.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.5% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 10412.00 , , , 0.00
5 15.6 Maintenance of Earthen Drains M - 110.13 3.12 , , 3,44.00
6 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
7 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
8 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
9 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
10 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
11 Maintenance of Already Planted Trees for Fourth Year No. 0.00 492.00 , , , 0.00
11 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Forth Year Maintenance Work Rs. , , 3,44.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 10.8% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 18.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 2.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 110.13 3.12 , , 3,44.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 24.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 37.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Fifth Year No. 0.00 492.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Fifth Year Maintenance Work Rs. , , 3,44.00
SUMMARY OF 5 YEARS MAINTENANCE COST
NAME OF ROAD:- #REF!
ROAD TYPE :-- Outer Road East Side 0.000 Km
Particulars Amount in Rs.
1st Year Maintenance cost , , , 0.00 1 % LC & 12 % GST
2nd Year Maintenance cost , , , 0.00
3rd Year Maintenance cost , , , 0.00
4th Year Maintenance cost , , , 0.00 7.33
5th Year Maintenance cost , , , 0.00
Total Cost of 5 years Maintenance , , , 0.00 0.8796
ESTIMATE FOR 5 YEARS MAINTENANCE WORKS
Multiplying factor for 15-45 CVPD 1.25
For more than 45 CVPD 1.5 1.25
Reference Operation Manual Annexure 14.4 and Engineer in chief letter no.2498 dated 20.11.2007
Total Length Of Road = 0 m
Length Of the Flexible Pavement = 0 m
Length Of the Regid Pavement = 0 m
Width Of the Road (Br) = 3.75 m
Width Of the Shoulder (Bs) = 0.6 m
No. Of Hume Pipe Culvert = 0 Nos
No. Of Slab Culvert = 0 Nos
Length of Drain= 0 m
Multiplying Factor for Commercial Vehicle 15 to 45 per days = 1.25 {ref. – Annexure 14.4 operation Manual from Rural Road}
Sl. No. SOR No. Description of Items Unit % Taken Yearly Estimated Qty. Rate (Rs.) Amount (Rs.)
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 6.0% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 10.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WMM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 10.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 12.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 18.0% 0.00 2.60 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For First Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 7.2% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 12.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 12.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 15.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Second Year No. 0.00 647.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Second Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 8.4% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 14.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 11462.30 , , , 0.00 28.969
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 10412.00 , , , 0.00 36.2109
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Third Year No. 0.00 554.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Third Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 9.6% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 16.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.5% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 10412.00 , , , 0.00
5 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
6 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
7 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
8 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
9 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
10 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
11 Maintenance of Already Planted Trees for Fourth Year No. 0.00 492.00 , , , 0.00
11 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Forth Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 10.8% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 18.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 2.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 24.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 37.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Fifth Year No. 0.00 492.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Fifth Year Maintenance Work Rs. , , , 0.00
SUMMARY OF 5 YEARS MAINTENANCE COST
NAME OF ROAD:- #REF!
ROAD TYPE :-- Outer Road East Side 0.000 Km
Particulars Amount in Rs.
1st Year Maintenance cost , , , 0.00 1 % LC & 12 % GST
2nd Year Maintenance cost , , , 0.00
3rd Year Maintenance cost , , , 0.00
4th Year Maintenance cost , , , 0.00 7.33
5th Year Maintenance cost , , , 0.00
Total Cost of 5 years Maintenance , , , 0.00 0.8796
ESTIMATE FOR 5 YEARS MAINTENANCE WORKS
Multiplying factor for 15-45 CVPD 1.25
For more than 45 CVPD 1.5 1.25
Reference Operation Manual Annexure 14.4 and Engineer in chief letter no.2498 dated 20.11.2007
Total Length Of Road = 0 m
Length Of the Flexible Pavement = 0 m
Length Of the Regid Pavement = 0 m
Width Of the Road (Br) = 3.75 m
Width Of the Shoulder (Bs) = 0.6 m
No. Of Hume Pipe Culvert = 0 Nos
No. Of Slab Culvert = 0 Nos
Length of Drain= 0 m
Multiplying Factor for Commercial Vehicle 15 to 45 per days = 1.25 {ref. – Annexure 14.4 operation Manual from Rural Road}
Sl. No. SOR No. Description of Items Unit % Taken Yearly Estimated Qty. Rate (Rs.) Amount (Rs.)
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 6.0% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 10.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WMM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Cum 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 10.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 12.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 18.0% 0.00 2.60 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For First Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 7.2% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 12.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 0.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 0.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 12.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 15.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Second Year No. 0.00 647.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Second Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 8.4% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 14.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 11462.30 , , , 0.00 28.969
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.0% 0.00 10412.00 , , , 0.00 36.2109
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Third Year No. 0.00 554.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Third Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 9.6% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 16.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 1.5% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 1.5% 0.00 10412.00 , , , 0.00
5 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
6 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
7 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
8 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
9 15.11 Maintenance of 200 m and km stones Km 18.0% 0.00 697.82 , , , 0.00
10 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 22.5% 0.00 2.60 , , , 0.00
11 Maintenance of Already Planted Trees for Fourth Year No. 0.00 492.00 , , , 0.00
11 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Forth Year Maintenance Work Rs. , , , 0.00
1 15.1 Restoration of Raincuts/Berms with soil.moorum etc(Qty=L*Bs*0.3*%taken) X 1.25 Cum 10.8% 0.00 1602.66 , , , 0.00
2 15.2 Making up of Berms/shoulder, stripping excess soil from the shoulder surfaces to achieve level etc. (Qty=L*Br*%taken) X 1.25 Sqm 18.0% 0.00 223.55 , , , 0.00
3 15.5 Repair of Pot holes filled with 75 mm WBM X 1.25 Sqm 2.0% 0.00 116.67 , , , 0.00
4 15.3(i) Repair of existing bituminous surface BM 50 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 11462.30 , , , 0.00
5 5.7 RCD Repair of existing bituminous surface SDBC 25 mm (Qty=L*Br*height*%taken) X 1.25 Sqm 2.0% 0.00 10412.00 , , , 0.00
6 15.6 Maintenance of Earthen Drains M - 0.00 3.12 , , , 0.00
7 15.7 (i) Maintenance of C/D Works (Hume Pipe Culvert) No. - 0.00 1288.30 , , , 0.00
8 15.7 (ii) Maintenance of C/D Works (Slab Culvert) No. - 0.00 2641.65 , , , 0.00
9 15.9 Maintenance of Road signs Km 15.0% 0.00 1213.69 , , , 0.00
10 15.11 Maintenance of 200 m and km stones Km 24.0% 0.00 697.82 , , , 0.00
11 15.12 (I)Cutting of branches of trees and shrubs No. - 0.00 127.08 , , , 0.00
(ii) Cutting of shrubs from roadway No. - 0.00 7.81 , , , 0.00
(iii) Trimming of grass and weeds Sqm 37.5% 0.00 2.60 , , , 0.00
12 Maintenance of Already Planted Trees for Fifth Year No. 0.00 492.00 , , , 0.00
12 15.13 White washing of parapet walls of CD work and tree truncks Sqm - 0.00 38.86 , , , 0.00
Estimate For Fifth Year Maintenance Work Rs. , , , 0.00
Year 2022-23 LWE PLAN
Analysis for Carriage by Road & Rail
Name of The Road :-- CONSTRUCTION OF BT ROAD AT NAWANAGAR INDUSTRIAL AREA
Sl No Item Unit Source Carriage Cost & Lead in Km Loading & Unloading Cost Total `
Pucka / Surface Katcha
1 Stone Metal & GSB Cum Jamalpur 8.00 x 11.70 x 220.00 Km = Rs 4118.40 8.00 x 28.20 x 0.00 Km = Rs 0.00 202.00 4320.40
2 Stone Aggregate / Chips Cum Jamalpur 8.00 x 11.70 x 192.00 Km = Rs 3594.24 8.00 x 28.20 x 0.00 Km = Rs 0.00 202.00 3796.24
4 Binding Material/Stone Dust Cum Jamalpur 8.00 x 11.70 x 220.00 Km = Rs 4118.40 8.00 x 28.20 x 0.00 Km = Rs 0.00 202.00 4320.40
9 Bitumen Emulsion MT Barauni 8.00 x 11.70 x 114.00 Km = Rs 1333.80 8.00 x 28.20 x 0.00 Km = Rs 0.00 250.00 1583.80
11 Hume Pipe (1000 mm ) Pipe Jehanabad 8.00 x 11.70 x 21.00 Km = Rs 196.56 8.00 x 28.20 x 0.00 Km = Rs 0.00 52.08 #REF!
12 Hume Pipe (600 mm ) Pipe Jehanabad 8.00 x 11.70 x 21.00 Km = Rs 78.62 8.00 x 28.20 x 0.00 Km = Rs 0.00 22.32 #REF!
13 Hume Pipe (300 mm ) Pipe Jehanabad 8.00 x 11.70 x 21.00 Km = Rs 32.76 8.00 x 28.20 x 0.00 Km = Rs 0.00 22.32 #REF!
Cost of Haulage Excluding Loading & Unloading as per SOR * Subjected to Verification of Lead
Type of Road ` Per Ton. Km by Tipper
For Surface Road 11.70
Unsurface Gravel Road 14.00
Kachha Road 28.20
Junior Engineer Asstt. Engineer Executive Engineer
CARRIAGE OF MATERIALS
Sr No Ref. to MoRTH Spec. Description Unit Quantity Rate Rs Cost Rs Remarks/ Input ref.
1.1 Loading and Unloading of Stone Boulder/Stone aggregates / Sand / Kanker / Moorum. cum
Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip
Taking output = 5.5 cum
Time required for
i) Positioning of tipper at loading point 1 Min
ii) Loading by front end loader 1 cum bucket capacity @ 25 cum per hour 13 Min
iii) Maneuvering, reversing, dumping and turning for return 2 Min
iv) Waiting time, unforeseen contingencies etc 4 Min
Tipper 5.5 tonnes capacity hour 0.330 1371.00 452.43 P&M-048
Front end-loader 1 cum bucket capacity @ 25 cum/hour hour 0.330 1366.00 450.78 P&M-017
b) Overhead charges @ 0.12 on (a) 108.39
c) Contractor's profit @ 0.1 on (a+b) 101.16
Cost for 5.5 cum = a+b+c 1112.75
Rate per cum = (a+b+c)/ 5.5 202.32
Note Unloading will be by tipping. say 202.00
1.2 Loading and Unloading of Boulders by Manual Means
Taking output = 5.5 cum
Mazdoor for loading and unloading day 0.750 304.00 228.00 L-13
Tipper 5.5 tonne capacity hour 0.750 1371.00 1028.25 P&M-048
c) Overhead charges @ 0.12 on (a+b) 154.99
d) Contractor's profit @ 0.1 on (a+b+c) 144.65
Cost for5.5 cum = a+b+c+d 1591.20
Rate per cum = (a+b+c+d)/5.5 289.31
Note Unloading will be by tipping. say 289.00
1.3 Loading and Unloading of Cement or Steel by Manual Means and Stacking.
Taking output = 10 tonnes
Mazdoor for loading and unloading day 2.000 304.00 608.00 L-13
Truck 10 tonne capacity hour 2.000 934.30 1868.60 P&M-057
c) Overhead charges @ 0.12 on (a+b) 300.27
d) Contractor's profit @ 0.1 on (a+b+c) 280.26
Cost for10 tonnes = a+b+c+d 3082.81
Rate per tonnes = (a+b+c+d)/10 308.28
1.4 Cost of Haulage Excluding Loading and Unloading
Haulage of materials by tipper excluding cost of loading, unloading and stacking.
Taking output 10 tonnes load and lead 10 km = 100 t.km
(i) Surfaced Road
Speed with load : 25 km / hour.
Speed while Returning empty :35 km / hour.
Tipper 10 tonne capacity
Time taken for onward haulage with load hour 0.400 1371.00 548.40 P&M-048
Time taken for empty return trip. hour 0.290 1371.00 397.59 P&M-048
b) Overhead charges @ 0.12 on (a) 113.52
c) Contractor's profit @ 0.1 on (a+b) 105.95
cost for 100 t km = a+b+c 1165.46
Rate per t.km = (a+b+c)/100 11.65
1.4 (ii) Unsurfaced Graveled Road
Speed with load: 20 km / hour
Speed for empty return trip :30 km / hour
Tipper 10 tonnes capacity
Time taken for onward haulage with load hour 0.500 1371.00 685.50 P&M-048
Time taken for empty return trip hour 0.330 1371.00 452.43 P&M-048
b) Overhead charges @ 0.12 on (a) 136.55
c) Contractor's profit @ 0.1 on (a+b) 127.45
Cost for 100 t .km = a+b+c 1401.93
Rate per t.Km = (a+b+c)/100 14.02
1.4 (iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.
Speed with load :10 km / hour
Speed while returning empty:15 km / hour
Tipper 10 tonnes capacity
Time taken for onward haulage hour 1.000 1371.00 1371.00 P&M-048
Time taken for empty return trip hour 0.670 1371.00 918.57 P&M-048
b) Overhead charges @ 0.12 on (a) 274.75
c) Contractor's profit @ 0.1 on (a+b) 256.43
Cost for 100 t .km = a+b+c 2820.75
Rate per t.Km = (a+b+c)/100 28.21
Sl. No. SDB Sl. No. MORD Ref No. DESCRIPTION Unit Quantity Rate Amount in Rs
1 1.3 Loading, Unloading and Stacking of Bricks by Manual Means
(i) Loading of Bricks by manual means including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
Mazdoor (Unskilled) day 0.25 304.00 76.00
Truck hour 0.33 934.30 308.32
c) Overheads @ 0.12 % on (a+b) 46.50
d) Contractor’s profit @ 10% on (a+b+c) 43.40
Cost for 2000 Nos. = a+b+c+d 477.44
Rate for 1000 bricks = (a+b+c+d)/2 238.72
Total Cost no. 238.72
2 (ii) Unloading and Stacking of Bricks by manual means including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
Mazdoor (Unskilled) day 0.25 304.00 76.00
Truck hour 0.33 934.30 308.32
c) Overheads @ 12 % on (a+b) 46.50
d) Contractor’s profit @ 10% on (a+b+c) 43.40
Cost for 2000 Nos. = a+b+c+d 477.44
Rate for 1000 bricks = (a+b+c+d)/2 238.72
Total Cost no. 238.72
Total Loding & Unloading of Brick Per 1000 = 238.72 + 238.72 = 477.44
Analysis of Rate
Sl. No. SOR No. Description Unit Rate (Rs.)
1 2.3 201 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Taking output = 1 Hectare
(i) By Manual Means:-
A In area of light jungle
Tractor-trolley hour 1.000 549.10 549.10 P&M-053
c) Overhead charges @ 0.12 on (a+b) 5769.01
d) Contractor's profit @ 0.1 on (a+b+c) 5384.41
Rate per Hectare = a+b+c+d 59228.52
Rate Per Hectare to be adopted in DPR Hectare 59,229.00
2 2.6 202 Dismantling of Cement Concrete Pavement
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
Taking output = 1 cum
Semi skilled mazdoor for operating pneumatic tools day 0.500 316.00 158.00 L-14
Mazdoors as helpers including loading and unloading day 0.500 304.00 152.00 L-13
Air compressor 250 cfm with two leads for pneumatic cutters/ hammers @ 1 cum per hour hour 1.000 391.00 391.00 P&M-001
Tractor-trolley hour 0.400 549.10 219.64 P&M-053
Joint Cutting Machine with 2-3 blades hour 1.000 293.00 293.00 P&M-083
c) Overhead charges @ 0.12 on (a+b) 146.79
d) Contractor's profit @ 0.1 on (a+b+c) 137.01
Rate per cum = a+b+c+d 1507.07
3 3.16 305 Construction of Embankment with Material obtained from Borrowpits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Rolling with Vibratory Roller)
Mazdoor day 1.000 304.00 304.00
Hydraulic Excavator1 cum bucket capacity @ 60 cum per hour hour 1.670 2202.00 3677.34
Tipper 10 tonne capacity tonne.km 160 x L 9.41 1505.60
Add 10 per cent of cost of carriage to cover cost of loading and unloading 150.56
Dozer 80 HP for spreading @ 200 cum per hour hour 0.500 5523.00 2761.50
Motor grader for grading @ 100 cum per hour hour 1.000 4403.00 4403.00
Water tanker6 KL capacity hour 4.000 707.00 2828.00
Vibratory roller 8 -10 tonnes @ 100 cum per hour hour 1.000 1978.00 1978.00
Cost of water KL 24.000 56.20 1348.80
Compensation & Royality for earth taken from private land cum 100.000 35.01 3501.00
d) Overhead charges @ 0.12 on (a+b+c) 2696.48
e) Contractor's profit @ 0.1 on (a+b+c+d) 2516.71
Cost for 100 cum = a+b+c+d+e 27683.83
Rate per cum = (a+b+c+d+e)/100 276.84
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR Cum 277.00
4 3.18 305 Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Taking output = 100 cum
Mazdoor day 1.000 304.00 304.00 L-13
Hydraulic excavator1 cum bucket capacity @ 60 cum per hour hour 1.670 2202.00 3677.34 P&M-026
Tipper 10 tonne capacity tonne.km 175xL 9.41 1646.75 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 164.68
Dozer 80 HP for spreading @ 200 cum per hour hour 0.500 5523.00 2761.50 P&M-014
Motor grader for grading @ 50 cum per hour hour 2.000 4403.00 8806.00 P&M-032
Water tanker with 6 km lead hour 4.000 707.00 2828.00 P&M-060
Vibratory roller 8-10 tonnes @ 80 cum per hour hour 1.250 1978.00 2472.50 P&M-059
Cost of water KL 24.000 56.20 1348.80 M-189
Compensation & Royality for earth taken from private land cum 100.000 35.01 3501.00 M-092
d) Overhead charges @ 0.12 on (a+b+c) 3302.81
e) Contractor's profit @ 0.1 on (a+b+c+d) 3082.62
Cost for 100 cum = a+b+c+d+e 33908.83
Rate per cum = (a+b+c+d+e)/100 339.09
Add 1% Cess for Labour Welfare 0.00
Rate Per Cum to be adopted in DPR Cum 339.00
5 4.2 401 Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Taking output = 300 cum
Mazdoor skilled day 2.000 385.00 770.00
Mazdoor day 8.000 304.00 2432.00
Mortar Grader 110 HP @ 50 cum per hour hour 6.000 4403.00 26418.00
Vibratory roller 8 -10 tonne hour 6.000 1978.00 11868.00
Water tanker 6 KL capacity hour 3.000 707.00 2121.00
For coarse graded Granular sub-base Materials per table 400-2
For grading-I Material
2.36 mm below @ 20 per cent (Coarse Sand) cum 76.800 262.42 20153.86
Cost of water KL 18.000 56.20 1011.60
For Grading-II Material
2.36 mm below @ 25 per cent cum 96.000 262.42 25192.32
Cost of water KL 18.000 56.20 1011.60
For Grading-III Material
2.36 mm below @ 34 per cent cum 129.000 262.42 33852.18
Cost of water KL 18.000 56.20 1011.60
4.2 (i) Rate per cum for grading-I Material
d) Overhead charges @ 0.12 on (a+b+c) 43586.74
e) Contractor's profit @ 0.1 on (a+b+c+d) 40680.96
Cost for 300 cum = a+b+c+d+e 447490.56
Rate per cum = (a+b+c+d+e)/300 1491.64
4.2 (ii) Rate per cum for grading-II Material
d) Overhead charges @ 0.12 on (a+b+c) 39013.12
e) Contractor's profit @ 0.1 on (a+b+c+d) 36412.24
Cost for 300 cum = a+b+c+d+e 400534.68
Rate per cum = (a+b+c+d+e)/300 1335.12
4.2 (iii) Rate per cum for grading-III Material
d) Overhead charges @ 0.12 on (a+b+c) 27363.74
e) Contractor's profit @ 0.1 on (a+b+c+d) 25539.49
Cost for 300 cum = a+b+c+d+e 280934.41
Rate per cum = (a+b+c+d+e)/300 936.45
Note Any one of the grading for material may be adopted as per design
GSB Gr-I SOR Rate 1,492.00
Add:Carriage Charge for Stone Metal material cum 1.024 4,320.40 4,424.09
Add:Carriage Charge for Coarse Sand cum 0.256 2,972.56 760.98
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR Cum 1,492.00
GSB Gr-II SOR Rate 1,335.00
Add:Carriage Charge for Stone Metal material cum 0.960 4,320.40 4,147.58
Add:Carriage Charge for Coarse Sand cum 0.320 2,972.56 951.22
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR Cum 1,335.00
6 6.1 Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Taking output = 450 cum (990 tonne)
Mazdoor skilled day 6.000 385.00 2310.00
Mazdoor day 22.000 304.00 6688.00
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00
Cement concrete batch mix plant @ 75 cum per hour hour 6.000 3375.10 20250.60
Electric generator 100 KVA hour 6.000 1359.00 8154.00
Paver with electronic sensor hour 6.000 6346.00 38076.00
Vibratory roller 8-10 t capacity hour 8.000 1978.00 15824.00
Water tanker6 KL capacity hour 8.000 707.00 5656.00
Tipper tonne.km 990 x L 9.41 9315.90
Add 10 per cent of cost of carriage to cover cost of loading and unloading 931.59
Crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1 @ 0.90 cum/cum of concrete conforming to clause 602.2.4. cum 405.000 736.00 298080.00
Coarse Sand as per IS: 383 @ 0.45 cum/cum of concrete cum 203.000 494.00 100282.00
Cement @ 150 kg/cum of concrete tonne 67.500 6240.40 421227.00
Cost of water KL 48.000 56.20 2697.60
d) Overhead charges @ 0.12 on (a+b+c) 112565.79
e) Contractor's profit @ 0.1 on (a+b+c+d) 105061.40
Cost for 205 cum = a+b+c+d+e 1155675.39
Rate per cum = (a+b+c+d+e)/450 2568.17
SOR Rate 2,568.00
Add:Carriage Charge for Stone Agg 0.900 3,796.24 3,416.62
Add:Carriage Charge for Cement 0.150 366.50 54.98
Add:Carriage Charge for Sand 0.451 2,972.56 1,340.95
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR Cum 2,568.00
7 6.2 Cement Concrete Pavement
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Taking output = 1050 cum (2415 tonne)
Mazdoor skilled day 15.000 385.00 5775.00
Road Sweeper @ 1250 sqm per hour hour 2.800 746.00 2088.80
Front end loader 1 cum bucket capacity hour 18.000 1366.00 24588.00
Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 6.000 7877.60 47265.60
Electric generator 250 KVA hour 6.000 3034.00 18204.00
Slip form paver with electronic sensor hour 6.000 1478.40 8870.40
Water tanker6 KL capacity hour 36.000 707.00 25452.00
Transit truck agitator 5 cum capacity. tonne.km 2415xL 7.00 16905.00
Add 10 per cent of cost of carriage to cover cost of loading and unloading 1690.50
Concrete joint cutting machine . hour 12.000 293.00 3516.00
Texturing machine . hour 12.000 118.70 1424.40
Crushed stone coarse aggregates of 25mm and 12.5mm nominal size @ 0.90 cum/cum of concrete conforming to clause 602.2.4. . cum 945.000 736.00 695520.00
Sand as per IS: 383 and conforming to clause 602.2.4 @ 0.45 cum/cum of concrete cum 473.000 494.00 233662.00
Cement 43 grade @ 400 kg/cum of concrete tonne 414.000 6240.40 2583525.60
32 mm mild steel dowel bars of grade Fe 500 D tonne 9.450 58600.00 553770.00
16 mm deformed steel tie bars of grade Fe 500 D tonne 1.170 72351.75 84651.55
Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 3675.000 15.24 56007.00
Pre moulded Joint filler, 25 mm thick for expansion joint. sqm 16.330 1064.18 17378.06
Joint sealant kg 875.000 27.24 23835.00
Sealant primer kg 116.670 122.02 14236.07
Plastic sheath,1.25 mm thick for dowel bars sqm 46.670 17.75 828.39
Curing compound liter 1850.000 136.22 252007.00
Super plastisizer admixture IS marked as per 9103-1999 @ 0.5 per cent by weight of cement kg 2070.000 214.86 444760.20
Cost of water KL 216.000 56.20 12139.20
Add 1 per cent of material for cost of miscellaneous materials like tarpauline, Hessian cloth, metal cap, cotton / compressible sponge and cradle for dowel bars, work bridges for men to approach concrete surface without walking over it, cutting blades and bites, minor equipments like scabbling machine, threads, ropes, guide wires and any other unforeseen items. 49723.20
d) Overhead charges @ 0.12 on (a+b+c) 622692.60
e) Contractor's profit @ 0.1 on (a+b+c+d) 581179.76
Cost for 1050cum = a+b+c+d+e 6392977.33
Rate per cum = (a+b+c+d+e)/1050 6088.55
SOR Rate SOR Rate 6,089.00
Add:Carriage Charge for Stone Agg cum 0.900 3,796.24 3,416.62
Add:Carriage Charge for Cement MT 0.394 366.50 144.51
Add:Carriage Charge for Sand cum 0.450 2,972.56 1,339.07
Add:Carriage Charge for Steel MT 0.009 366.50 3.30
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR cum 6,089.00
8 8.14 Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc
(i) 5th kilometre stone (precast)
Taking output = 6 Nos.
a) M-15 grade of concrete cum 2.350 3855.00 9059.25
b) Steel reinforcement @ 5 kg per sqm kg 22.080 67.29 1485.79
c) Excavation in soil for foundation cum 1.680 178.00 299.04
d) Painting two coats on concrete surface sqm 9.850 62.00 610.70
e) Lettering on km post (average 30 letters of 10 cm height each) per cm per letter 1800.000 0.37 666.00
Transportation and fixing
Mazdoor including loading/unloading day 6.000 304.00 1824.00
Tractor-trolley hour 6.000 549.10 3294.60
h) Overhead charges @ 0.12 on (f+g) 653.62
i) Contractor's profit @ 0.1 on (f+g+h) 610.05
Cost for 6 Nos. 5th km stone = a+b+c+ d+e +f+g+h +i 18831.31
Rate for each 5th km stone = (a+b+c+ d+e +f+g+h +i ) / 6 3138.55
Add 1% Cess for Labour Welfare 31.39
5th kilometre stone (precast) 3,170.39
(ii) Ordinary kilometer stone (precast)
Taking output = 14 Nos.
a) M-15 grade of concrete cum 3.770 3855.00 14533.35
b) Steel reinforcement @ 5 kg per sqm kg 26.320 67.29 1771.10
c) Excavation in soil for foundation cum 2.770 178.00 493.06
d) Painting two coats on concrete surface sqm 11.410 62.00 707.42
e) Lettering on km post ( average 12 letters of 10 cm height each) per cm per letter 1680.000 0.37 621.60
Transportation and fixing
Mazdoor day 7.000 304.00 2128.00
Tractor-trolley hour 6.000 549.10 3294.60
h) Overhead charges @ 0.12 on (f+g) 712.00
i) Contractor's profit @ 0.1 on (f+g+h) 664.53
Cost for 14 Nos. ordinary km stone = (a+b+ c +d+e+f+ g+h+i) 25436.38
Rate for each ordinary km stone = (a+b+ c +d+e+f+g+ h+j ) /14 1816.88
Add 1% Cess for Labour Welfare 18.17
Ordinary kilometer stone (precast) 1,835.17
9 8.16 Boundary pillar
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting
Taking output = 57 Nos.
a) M-15 grade of the boundary stone cum 1.250 3855.00 4818.75
b) Steel reinforcement kg 79.800 67.29 5369.82
c) Excavation in soil cum 10.720 178.00 1908.16
d) Lettering, each 10 cm high per letter per cm high 2280.000 0.37 843.60
Transportation and fixing
Mazdoor day 14.250 304.00 4332.00
Tractor-trolley hour 6.000 549.10 3294.60
Stone spall cum 11.970 355.79 4258.81
h) Overhead charges @ 0.12 on (e+f+g) 1448.21
i) Contractor's profit @ 0.1 on (e+f+g+h) 1351.66
Cost for 57 Nos. boundary pillar = (a+b +c+d +e+ f+g+h+i ) 27808.57
Rate for each boundary pillar = (a+b+c+d+e+ f+g+h+i)/57 487.87
Add 1% Cess for Labour Welfare 4.88
Rate in DPR 492.88
9 8.13 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Taking output = 640 sqm
Mazdoor day 2.000 304.00 608.00
Road marking machine @ 80 sqm per hour hour 8.000 1349.00 10792.00
Tractor-trolley hour 8.000 549.10 4392.80
Hot applied thermoplastic compound Litre 2000.000 198.46 396920.00
Reflectorising glass beads kg 200.000 72.00 14400.00
d) Overhead charges @ 0.12 on (a+b+c) 51272.80
e) Contractor's profit @ 0.1 on (a+b+c+d) 47854.61
Cost for 640 sqm = a+b+c+d+e 526400.71
Rate per sqm = a+b+c+d+e)/640 822.50
Add 1% Cess for Labour Welfare 8.23
Rate per sqm to be adopted in DPR sqm 831.23
10 8.4 Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
Taking output = one traffic sign
i) Excavation for foundation cum 0.216 178.00 38.45
ii) Cement concrete M15 grade cum 0.120 3855.00 462.60
iii) Painting angle iron post two coats sqm 0.430 53.00 22.79
a) Labour (For fixing at site)
Mazdoor day 0.250 304.00 76.00
Mild steel angle iron 75 x 75 x 6 mm kg 19.000 57.033 1083.627
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of size including lettering and signs as applicable
Add 2 per cent of cost of angle iron towards cost of drilling holes, nuts, bolts etc. 21.67
( i ) 90 cm equilateral triangle sqm 0.350 8945.43 3130.90
( ii ) 60 cm equilateral triangle sqm 0.156 8945.43 1395.49
( iii ) 60 cm circular sqm 0.283 8945.43 2531.56
( iv ) 80 mm x 60 mm rectangular sqm 0.480 8945.43 4293.81
( v ) 60 cm x 45 cm rectangular sqm 0.270 8945.43 2415.27
(vi ) 60 cm x 60 cm square sqm 0.360 8945.43 3220.35
( vii ) 90 cm high octagon sqm 0.672 8945.43 6011.33
Tractor-trolley hour 0.010 549.10 5.49
( i ) 90 cm equilateral triangle
d) Overhead charges @ 0.12 on (a+b+c) 518.51
e) Contractor's profit @ 0.1 on (a+b+c+d) 483.94
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 5847.18
Add 1% Cess for Labour Welfare 58.47
Rate for DPR 5905.47
( ii ) 60 cm equilateral triangle
d) Overhead charges @ 0.12 on (a+b+c) 310.26
e) Contractor's profit @ 0.1 on (a+b+c+d) 289.57
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 3709.16
Add 1% Cess for Labour Welfare 37.09
Rate for DPR 3746.09
( iii ) 60 cm circular
d) Overhead charges @ 0.12 on (a+b+c) 446.59
e) Contractor's profit @ 0.1 on (a+b+c+d) 416.81
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 5108.79
Add 1% Cess for Labour Welfare 51.09
Rate for DPR 5160.09
( iv ) 80 mm x 60 mm rectangular
d) Overhead charges @ 0.12 on (a+b+c) 658.06
e) Contractor's profit @ 0.1 on (a+b+c+d) 614.19
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 7279.89
Add 1% Cess for Labour Welfare 72.80
Rate for DPR 7352.80
( v ) 60 cm x 45 cm rectangular
d) Overhead charges @ 0.12 on (a+b+c) 432.63
e) Contractor's profit @ 0.1 on (a+b+c+d) 403.79
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 4965.52
Add 1% Cess for Labour Welfare 49.66
Rate for DPR 5015.66
(vi ) 60 cm x 60 cm square
d) Overhead charges @ 0.12 on (a+b+c) 529.24
e) Contractor's profit @ 0.1 on (a+b+c+d) 493.96
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 5957.39
Add 1% Cess for Labour Welfare 59.57
Rate for DPR 6016.57
( vii ) 90 cm high octagon
d) Overhead charges @ 0.12 on (a+b+c) 864.16
e) Contractor's profit @ 0.1 on (a+b+c+d) 806.55
Rate per traffic sign = ( i+ii+iii+a+b+c+d+e) 9395.87
Add 1% Cess for Labour Welfare 93.96
Rate for DPR 9489.96
(i) 90 cm equilateral triangle sqm 5,905.47
(ii) 60 cm equilateral triangle sqm 3,746.09
(iii) 60 cm circular sqm 5,160.09
(iv) 80 mm x 60 mm rectangular sqm 7,352.80
(v) 60 cm x 45 cm rectangular sqm 5,015.66
(vi) 60 cm x 60 cm square sqm 6,016.57
(vii) 90 cm high octagon sqm 9,489.96
11 8.5 Direction and Place Identification Signs upto 0.9 sqm Size Board.
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Taking output = 0.9 sqm
i) Excavation for foundation cum 0.216 178.00 38.45
ii) Cement concrete M15 grade cum 0.120 3855.00 462.60
iii) Painting angle iron post two coats sqm 0.430 53.00 22.79
a) Labour (For fixing at site)
Mazdoor day 0.200 304.00 60.80
Mild steel angle iron 75 mm x 75 mm x 6 mm,2.85 metres long kg 19.000 57.03 1083.63
Aluminium sheeting fixed with encapsulated lens type reflective sheeting of size 0.9 sqm sqm 0.900 8945.43 8050.89
Add 2 per cent of cost of materials for drilling holes, nuts, bolts, fabrication etc. 182.69
Tractor-trolley hour 0.020 549.10 10.98
d) Overhead charges @ 0.12 on (a+b+c) 1127.06
e) Contractor's profit @ 0.1 on (a+b+c+d) 1051.93
Cost for 0.9 sqm =I+ii+ii+ a+b+c+d+e 12095.02
Rate per sqm (for sign having area upto 0.9 sqm) = (I+ii+iii+a+b+c+d+e)/0.90 13438.91
Add 1% Cess for Labour Welfare 134.39
DPR Rate sqm 13,573.39
12 8.6 Direction and Place Identification Signs with size more than 0.9 sqm size Board
Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
Taking output = 1.50 sqm
i) Excavation for foundation cum 0.430 178.00 76.54
ii) Cement concrete M15 grade cum 0.240 3855.00 925.20
iii) Painting angle iron post 2 coats sqm 0.860 53.00 45.58
a) Labour (For fixing at site)
Mazdoor day 0.300 304.00 91.20
Mild steel angle iron 75 mm x 75 mm x 6 mm, 2.85 metres long, 2 nos kg 38.000 57.03 2167.25
Aluminium sheeting fixed with encapsulated lens type reflective sheeting sqm 1.500 8945.43 13418.15
Add 2 per cent of cost of materials for drilling holes, nuts, bolts, fabrication etc. 311.71
Tractor-trolley hour 0.020 549.10 10.98
d) Overhead charges @ 0.12 on (a+b+c) 1920.30
e) Contractor's profit @ 0.1 on (a+b+c+d) 1792.28
Cost for 1.5 sqm =I+ii+ii+ a+b+c+d+e 20762.40
Rate per sqm ( for sign having area more than 0.9 sqm) = ( i+ii+iii+a+b+c+d+e)/1.50 13841.60
Add 1% Cess for Labour Welfare 138.42
DPR Rate sqm 13,980.42
13 8.3 Printing New Letter and Figures of any Shade
(ii) English and Roman
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
Hyphens and the like not to be measured and paid for
Detail for 100 letters of 16 cm height. i.e.1600 cm
Unit = per cm height per letter
Painter Ist class day 1.250 386.00 482.50
Mazdoor day 0.500 304.00 152.00
Paint Litre 0.500 246.65 123.33
c) Overhead charges @ 0.12 on (a+b) 93.64
d) Contractor's profit @ 0.1 on (a+b+c) 87.39
Cost for 1600 cm = a+b+c+d 961.32
Rate per cm height per letter = (a+b+c +d)/1600 0.60
Add 1% Cess for Labour Welfare 0.0060
Rate for DPR 0.61
14 8.8 Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
SOR Rate sqm 61.00
Add 1% Cess for Labour Welfare 0.6100
Rate for DPR 61.61
15 8.29 Cable Duct Across the Road
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.
SOR Rate (i)( Single Row for one utility service) Meter 676.00
6 TEC Brick Flat Soling
Providinf 1st class brick on Flat soling joints filled with local sand all complete job as per direction of E/I
Providing 100A one brick flat soling
Bricks Nos 300.00 5.54 1662.00
Local Sand cum 0.142 143.32 20.35
Mason Grade II Nos 0.500 364.00 182.00
Unskilled Labour Nos 1.000 304.00 304.00
Overheads @ 12% on (above) 260.38
Contractor’s profit @ 10% on (above) 243.02
Rate per sqm 287.00
SOR Rate 287.00
Add:Carriage Charge for Brick Nos 32.609 0.918 29.93
Add:Carriage Charge for Local Sand Cum 0.0153 284.56 4.34
Add 1% Cess for Labour Welfare 0.00
Rate per sqm to be adopted in DPR Sqm 287.00
7 TEC Brick Edge Soling
Laying brick soling layer on prepared sub- grade with brick on end edging according to line , grade and cross- section shown on the drawing filling joints with sand and earth , spreading 25 mm thick layer of earth over brick soling , watering and rolling the same with three wheeled road roller 80-100 KN.
Providing 100A on Brick Edge soling
Assume 9.30 m2 Amount
Bricks 500 nos @ Rs 5540 per 1000 nos Nos 500 5.54 2770.00
Local Sand 0.283 m3 @ Rs 69.65 per cum cum 0.283 143.32 40.56
Mason Grade II 0.65 Nos @ Rs 108 each Nos 0.65 364.00 236.60
Unskilled labour 1.25 Nos @ Rs 89 each Nos 1.25 304.00 380.00
Overheads @ 12% on (above) 411.44
Contractor’s profit @ 10% on (above) 384.01
Rate per sqm 454.00
SOR Rate 454.00
Add:Carriage Charge for Brick Nos 53.763 0.918 49.35
Add:Carriage Charge fo rLocal Sand cum 0.0304 284.56 8.66
Add 1% Cess for Labour Welfare 0.00
Rate per sqm to be adopted in DPR Sqm 454.00
8 SOR MORD Providing and laying neat cement punning 1.5 mm thick as per Specification etc as per direction …
Assume area =9.30 m2
Sundries L.S. 1.50
Head Mason No 0.06 408.00 24.48
Mason Gr II No 0.50 364.00 182.00
Unskilled Labour No 0.25 304.00 76.00
Total (a+b) 409.79
('C) Over Head @10% (a+b) 40.98
Contractor's Profit 10% on (a+b+c) 45.08
Grand Total 495.84
Hence rate per m2 (495.84/9.3) 53.00
Add:Carriage Charge for Cement MT 0.0672 366.50 24.63
Add 1% Cess for Labour Welfare 0.78
Rate per sqm to be adopted in DPR Sqm 78.41
8 12.1 A Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil Upto 3.0 m depth
Taking output = 10 cum
(i) Depth upto 3 m
Mazdoor day 3.50 304.00 1064.00
b) Overhead charges @ 0.2 on (a) 221.79
c) Contractor's profit @ 0.1 on (a+b) 133.07
Cost for 10 cum = a+b+c 1463.80
Rate per cum = (a+b+c)/10 146.38
(i) SOR Rate Rs. 146.00 0.96 = Cum 140.16
Add 1% Cess for Labour Welfare 0.00
Rate for DPR Cum 140.16
9 12.3 Local Sand Filling:-- Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Taking output = 1 cum
Mazdoor day 0.30 304.00 91.20
Sand (assuming 20 per cent voids) cum 1.20 143.32 171.98
c) Overhead charges @ 0.2 on (a+b) 53.28
d) Contractor's profit @ 0.1 on (a+b+c) 31.97
Rate per cum = a+b+c+d 351.64
Add:Carriage Charge for Local Sand 1.20 284.56 341.47
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR Cum 337.92
10 12.4 2100 PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Taking output = 15 cum
40 mm Aggregate cum 13.50 975.00 13162.50 M-055
coarse Sand cum 6.75 494.00 3334.50 M-005
cement tonne 3.45 6240.40 21529.38 M-081
Cost of water KL 18.00 56.20 1011.60 M-189
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00 P&M-009
Generator 33 KVA hour 6.00 495.00 2970.00 P&M-079
Water tanker 6 KL capacity hour 2.00 707.00 1414.00 P&M-060
d) Overhead charges @ 0.2 on (a+b+c) 10058.68
e) Contractor's profit @ 0.1 on (a+b+c+d) 6035.21
Cost for 15 cum = a+b+c+d+e 66387.31
Rate per cum = (a+b+c+d+e)/15 4425.82
Add:Carriage Charge for Stone Agg Cum 0.900 3,796.24 3,416.62
Add:Carriage Charge for Cement MT 0.230 366.50 84.30
Add:Carriage Charge for Sand Cum 0.450 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR cum 4,248.96
11 12.8 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
A II. P.C.C grade M-15 Nominal mix 1:2:4
Taking output = 15 cum
Cement tonne 4.13 6240.40 25772.85
Coarse sand cum 6.75 494.00 3334.50
40 mm Aggregate cum 8.10 975.00 7897.50
20 mm Aggregate cum 4.05 1186.00 4803.30
10 mm Aggregate cum 1.35 586.00 791.10
Mazdoor day 20.00 304.00 6080.00
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00
Generator 63 KVA hour 6.00 869.00 5214.00
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) 3766.00
d) Formwork @ 4 per cent on cost of concrete i.e. cost of material, labour and machinery 2259.17
e) Overhead charges @ 0.2 on (a+b+c+d) 11747.70
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 7048.62
Cost for 15 cum = a+b+c+d+e+f 77534.80
Rate per cum = (a+b+c+d+e+f)/15 5168.99
Add:Carriage Charge for Stone Agg Cum 0.900 3,796.24 3,416.62
Add:Carriage Charge for Cement MT 0.2753 366.50 100.91
Add:Carriage Charge for Sand Cum 0.450 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR cum 4,962.24
12 12.8 C RCC Grade M20
Case I Using Concrete Mixer
Taking output = 15 cum
Cement tonne 5.21 6240.40 32512.48 M-081
Coarse sand cum 6.75 494.00 3334.50 M-005
20 mm Aggregate cum 8.10 1186.00 9606.60 M-053
10 mm Aggregate cum 5.40 586.00 3164.40 M-051
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00 P&M-009
Generator 33 KVA hour 6.00 495.00 2970.00 P&M-079
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) 4017.00
d) Formwork @ 4 per cent on (a+b+c) 2410.16
e) Overhead charges @ 0.2 on (a+b+c+d) 12532.84
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 7519.70
Cost for 15 cum = a+b+c+d+e+f 82716.75
Rate per cum = ( a+b+c+d+e+f )/15 5514.45
Add:Carriage Charge for Stone Agg Cum 0.90 3,796.24 3,416.62
Add:Carriage Charge for Cement Cum 0.344 366.50 126.08
Add:Carriage Charge for Sand Cum 0.45 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR cum 5,293.44
13 12.38 C RCC Grade M35
Case I Using Concrete Mixer
Taking output = 15 cum
Cement tonne 6.33 6240.40 39501.73 M-081
Coarse sand cum 6.75 494.00 3334.50 M-005
20 mm Aggregate cum 8.10 1186.00 9606.60 M-053
10 mm Aggregate cum 5.40 586.00 3164.40 M-051
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00 P&M-009
Generator 33 KVA hour 6.00 495.00 2970.00 P&M-079
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) 4484.00
d) Formwork @ 4 per cent on (a+b+c) 2690.25
e) Overhead charges @ 0.2 on (a+b+c+d) 13989.28
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 8393.57
Cost for 15 cum = a+b+c+d+e+f 92329.22
Rate per cum = ( a+b+c+d+e+f )/15 6155.28
13 12.40 1600 Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Taking output = 1 MT
HYSD bars including5 per cent overlaps and wastage tonne 1.05 72351.75 75969.34 M-082
Binding wire Kg 6.00 75.04 450.24 M-072
b) Labour for cutting, bending, shifting to site, tying and placing in position
Blacksmith day 2.00 408.00 816.00 L-02 a
Mazdoor day 6.00 304.00 1824.00 L-13
c) Overhead charges @ 0.2 on (a+b) 15837.60
d) Contractor's profit @ 0.1 on (a+b+c) 9502.56
Rate per MT (a+b+c+d) 104528.13
Add:Carriage Charge for HYSD bar MT 1.05 366.50 384.83
Add 1% Cess for Labour Welfare 0.00
Rate per cum to be adopted in DPR cum 100,346.88
12 13.3 1300 & 2200 (i) Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
(A) Plastering with cement mortar (1:3 )
Taking output = 10 sqm
Cement mortar 1:3 (Rate as in Item 12.5) cum 0.144 3988.00 574.27
Mazdoor day 0.50 304.00 152.00
c) Overhead charges @ 0.2 on (a+b) 188.62
d) Contractor's profit @ 0.1 on (a+b+c) 113.17
Rate per 10 sqm (a+b+c+d) 1244.91
Carriage say 1245.00
Add:Carriage Charge for Sand Cum 0.0151 2,972.56 44.89
Add:Carriage Charge for Cement MT 0.00734 366.50 2.69
Add 1% Cess for Labour Welfare 1.67
Rate per sqm to be adopted in DPR sqm 168.77
13 13.5 Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
B III. P.C.C grade M-20 Nominal mix 1:1.5:3
B PCC Grade M20
(p) Height upto 5m
Same as Item 12.8 (B) upto 5 m height, except for formwork which shall be 10 per cent instead of 4 per cent of cost of material, labour and machinery.
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) of Item 12.8 (B) 2920.00
Add 10 per cent of cost of material, labour and machinery (a+b+c) for Formwork 10.00 292.00
e) Overhead charges @ 0.2 on (a+b+c+d) 642.40
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 385.44
Rate per cum (a+b+c+d+e+f) 4239.84
Add:Carriage Charge for Stone Agg Cum 0.90 3,796.24 3,416.62
Add:Carriage Charge for Cement Cum 0.344 366.50 126.08
Add:Carriage Charge for Sand Cum 0.45 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 89.51
Rate per cum to be adopted in DPR cum 9,040.25
14 12.5 Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
I. Brick masonary in 1:3 cement mortar
Taking output = 5 cum
Bricks Ist class each 2500.00 5.54 13850.00
Cement mortar 1:3 (Rate as in Item 12.5 A sub-analysis) cum 1.20 3988.00 4785.60
Mazdoor day 8.00 304.00 2432.00
c) Overhead charges @ 0.2 on (a+b) 4570.74
d) Contractor's profit @ 0.1 on (a+b+c) 2742.44
Cost for 5 cum = a+b+c+d 30166.86
Rate per cum (a+b+c+d)/5 6033.37
(ii) Rate for Brick Work in C. M. 1:3 in foundation 6033.00
(A) Cement Mortar 1:3 (1 cement : 3 sand)
Taking output = 1 cum
Cement tonne 0.51 6240.40 3182.60
Mazdoor day 0.90 304.00 273.60
Total Material and Labour = (a+b) say 3988.00
Add:Carriage Charge for Brick Nos 500 0.918 458.92
Add:Carriage Charge for Cement MT 0.1224 366.50 44.86
Add:Carriage Charge for Sand cum 0.252 2,972.56 749.09
Add 1% Cess for Labour Welfare 70.45
Rate per cum to be adopted in DPR cum 7,114.99
15 14.1 B RCC Grade M25:-- Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
Case I Using Concrete Mixer
Taking output = 15 cum
Cement tonne 5.99 6240.40 37380.00
Coarse sand cum 6.75 494.00 3334.50
20 mm Aggregate cum 8.10 1186.00 9606.60
10 mm Aggregate cum 5.40 586.00 3164.40
Mazdoor day 20.00 304.00 6080.00
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 283.00 1698.00
Generator 33 KVA hour 6.00 495.00 2970.00
Basic Cost of Labour, Material & Machinery (a+b+c) for 15 cum 65122.00
For formwork and staging add the following:
14.1B Case I (i) For solid slab super-structure, 20-30 per cent of (a+b+c)
(p) Height upto 5m
Basic Cost of Labour, Material & Machinery (a+b+c) for 15 cum 65122.00
d) Formwork and staging 20 per cent of (a+b+c) 20.00 13024.40
e) Overhead charges @ 0.2 on (a+b+c+d) 15629.28
f) Contractor's profit @ 0.1 on (a+b+c+d+e) 9377.57
Cost for 15 cum = a+b+c+d+e+f 103153.25
Rate per cum = (a+b+c+d+e+f)/15 6876.88
B V. R.C.C grade M-25
Add:Carriage Charge for Stone Agg cum 0.90 3,796.24 3,416.62
Add:Carriage Charge for Cement MT 0.399 366.50 146.36
Add:Carriage Charge for Sand cum 0.45 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 115.03
Rate per cum to be adopted in DPR cum 11,617.57
14 14.2 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Taking output = 1 MT
HYSD bars including 5 per cent for laps and wastage tonne 1.05 72351.75 75969.34
Binding wire Kg 8.00 75.04 600.32
b) Labour for cutting, bending, tying and placing in position
Blacksmith day 3.00 408.00 1224.00
Mazdoor day 8.00 304.00 2432.00
Basic Cost of Labour & Material (a+b) 80367.00
c) Overhead charges @ 0.2 on (a+b) 16073.38
d) Contractor's profit @ 0.1 on (a+b+c) 9644.03
Rate per MT = a+b+c+d 106084.30
Add:Carriage Charge for HYSD bar MT 1.05 366.50 384.83
Add 1% Cess for Labour Welfare 1,022.25
Rate per cum to be adopted in DPR cum 103,247.72
15 14.4 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Taking output = 1 cum
Cement concrete M30 Grade Refer relevant item of concrete in Item 14.1 excluding formwork cum 1.00 3316.00 3316.00
HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP) tonne 0.075 49567.00 3717.53
Mazdoor for cleaning deck slab concrete surface. day 0.15 304.00 45.60
c) Overhead charges @ 0.2 on (a+b) 1415.83
d) Contractor's profit @ 0.1 on (a+b+c) 849.50
Rate per cum (a+b+c+d) 9344.45
R.C.C grade M-30
Add:Carriage Charge for Stone Agg cum 0.077 4,320.40 332.67
Add:Carriage Charge for Cement MT 0.038 366.50 13.93
Add:Carriage Charge for Sand cum 0.345 2,972.56 1,025.53
Add:Carriage Charge for Steel MT 0.018 366.50 6.60
Add 1% Cess for Labour Welfare 103.49
Rate per cum to be adopted in DPR cum 10,452.46
16 14.6 2703, 1500, 1600 & 1700 Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Taking output = 2 x 24 m span = 48 m
i) M30 Grade Reinforced Cement Concrete cum 4.092 3316.00 13569.07
No. of vertical posts = (12 + 2)2 = 28 Nos., External area of vertical post 0.25x0.275 = 0.069sqm, Concrete in Vertical posts = 0.069 x 28 = 1.932 cum, Hand rail in 3 tiers = 3 x 24 = 72 m, External area = 0.170 x 0.175 = 0.03 sqm, Concrete in hand rails = 0.03 x 72 = 2.16 cum, Total Concrete = 1.932 + 2.16 = 4.092 cum. (Refer MoRTH SD / 202).
Add 5 per cent of above cost for form work for casting in casting yard. 678.45
ii) HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP) tonne 0.865 49567.00 42875.46
Refer MoRTH SD / 202.
Add 5 per cent of (a) for handling and fixing of precast panels in position 2856.15
b) Overhead charges @ 0.25 on (a) 14994.78
c) Contractor's profit @ 0.1 on (a+b) 7497.39
Rate for 48 m (a+b+c) 82471.30
Rate per metre (a+b+c)/48 1718.15
V. R.C.C grade M-30
Add:Carriage Charge for Stone Agg cum 0.077 3,796.24 292.31
Add:Carriage Charge for Cement MT 0.038 366.50 13.93
Add:Carriage Charge for Sand cum 0.348 2,972.56 1,034.45
Add:Carriage Charge for Steel MT 0.018 366.50 6.60
Add 1% Cess for Labour Welfare 29.97
Rate per m to be adopted in DPR m 3,026.53
17 14.7 Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303
Brick on edge laid in cement mortar (1:3)
Cement mortar 1:3 (Rate as in Item 12.5) cum 0.40 3,988.00 1,595.20
Mason 1st Class day 0.80 408.00 326.40
Mazdoor (Unskilled) day 1.60 304.00 486.40
Bhisti day 0.20 304.00 60.80
c) Overheads @ 15% on (a+b) 790.64
d) Contractor’s profit @ 10% on (a+b+c) 606.15
Rate per cum = a+b+c+d 6,667.69
Add:Carriage Charge for Brick Nos 500.00 0.918 458.92
Add:Carriage Charge for Sand cum 0.252 2,972.56 749.09
Add:Carriage Charge for Cement MT 0.1224 366.50 44.86
Add 1% Cess for Labour Welfare 76.54
Rate per cum to be adopted in DPR Cum 7,730.69
18 14.9 2705 Drainage Spouts complete as per drawing and Technical specification
Taking output = 1 No.
Corrosion resistant Structural steel including 5 per cent wastage Kg 4.00 46.83 187.31 M-087/1000
GI pipe 100mm dia metre 6.00 44.28 265.68 M-056
GI bolt 10 mm Dia each 6.00 17.88 107.28 M-110
Galvanised MS flat clamp each 2.00 17.17 34.34 M-101
For fabrication
Skilled (Blacksmith, welder etc.) day 0.02 408.00 8.16 L-02 a
Mazdoor day 0.02 304.00 6.08 L-13
For fixing in position
Mazdoor day 0.20 304.00 60.80 L-13
Add @ 5 per cent of cost of material and labour for electrodes, cutting gas, sealant, anti-corrosive bituminous paint, mild steel grating etc. 34.17
c) Overhead charges @ 0.25 on (a+b) 179.38
d) Contractor's profit @ 0.1 on (a+b+c) 89.69
Rate per metre (a+b+c+d) 986.60
Add 1% Cess for Labour Welfare 9.48
Rate per to be adopted in DPR Each 957.00
19 14.10 2700 PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Taking output = 1 cum
Concrete, Rate as per item No. 12.8 (A) excluding formworks cum 1.00 5168.99 5168.99
Rate per cum say 5169.00
Add:Carriage Charge for Stone Agg Cum 0.900 3,796.24 3,416.62
Add:Carriage Charge for Cement MT 0.275 366.50 100.79
Add:Carriage Charge for Sand cum 0.450 2,972.56 1,337.65
Add 1% Cess for Labour Welfare 98.17
Rate per cum to be adopted in DPR cum 9,915.47
20 14.11 1500,1600,1700 & 2704 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
Taking output = 1 cum
Cement concreteM30 Grade Refer relevant item of concrete in item 12.8(G)by using batching plant, excluding formwork i.e. per cum basic cost (a+b+c) (Excluding OH & CP) cum 1.00 3315.00 3315.00 Item 12.8 (G)
( Refer relevant item of concrete in item No. 13.8 (G) except that form work may be added at the rate of 2 per cent of cost against 3.5 per cent provided in the foundation concrete. 66.30
HYSD bar reinforcement Rate as per item No 14.2(Excluding OH & CP) tonne 0.05 49567.00 2478.35 Item 14.2 A
b) Overhead charges @ 0.25 on (a) 1464.91
c) Contractor's profit @ 0.1 on(a+b) 732.46
Rate per cum (a+b+c) 8057.02
R.C.C grade M-30
Add:Carriage Charge for Stone Agg cum 0.077 3,796.24 292.31
Add:Carriage Charge for Cement MT 0.038 366.50 13.93
Add:Carriage Charge for Sand cum 0.348 2,972.56 1,034.45
Add:Carriage Charge for Steel MT 0.050 366.50 18.33
Add 1% Cess for Labour Welfare 90.94
Rate per cum to be adopted in DPR cum 9,184.67
14.19 2600 Asphaltic Plug joint
Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications.
Unit = Running meter
Taking output = 12 m
Mazdoor day 1.00 304.00 304.00 L-13
Mazdoor (Skilled) day 0.30 385.00 115.50 L-15
Crushed stone aggregate 12.5 mm nominal size cum 0.75 586.00 439.50 M-052
Polymer modified bitumen kg 77.50 53.97 4182.29 M-078/ 1000
Galvanised structural steel plate 200 mm wide,6 mm thick, 12 m long (2.4 sqm) @ 47.10 kg/sqm including 5 per cent wastage kg 113.00 57.03 6444.39 M-103
Add 1 per cent for welding and foam caulking/backer rod and other incidentals. 115.02
Mastic cooker 1 tonne capacity hour 1.00 450.00 450.00 P&M-030
Smooth 3-wheeled steel roller 8-10 capacity hour 0.50 1518.00 759.00 P&M-044
d) Overhead charges @ 0.25 on (a+b+c) 3206.60
e) Contractor's profit @ 0.1 on (a+b+c+d) 1603.30
Cost for 12 m asphalt plug joint = (a+b+c+d+e) 17636.29
Rate per m = (a+b+c+d+e)/12 1469.69
R.C.C grade M-30
Add 1% Cess for Labour Welfare 14.11
Rate per m to be adopted in DPR m 1,425.31
21 15.1 Flexible Boulders Apron:-- Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A Boulder Laid Dry Without Wire Crates.
Taking output = 1 cum
Stone Spalls cum 0.20 355.79 71.16 M-008
c) Overhead charges @ 0.25 on (a+b) 282.45
d) Contractor's profit @ 0.1 on (a+b+c) 141.22
Rate per cum = (a+b+c+d) 1553.47
Add:Carriage Charge for Boulder Cum 1.20 #REF! #REF!
Add 1% Cess for Labour Welfare #REF!
Rate per cum to be adopted in DPR Cum #REF!
22 15.4 2504 Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
A Stone/Boulder
Taking output = 1 cum
Stone weighing not less than 40kg cum 1.00 675.00 675.00 M-003
Stone spalls of minimum 25 mm size cum 0.20 355.79 71.16 M-008
Mazdoor day 0.75 304.00 228.00 L-13
c) Overhead charges @ 0.25 on (a+b) 282.45
d) Contractor's profit @ 0.1 on (a+b+c) 141.22
Rate per cum = (a+b+c+d) 1553.47
Add:Carriage Charge for Boulder Cum 1.20 #REF! #REF!
Add 1% Cess for Labour Welfare #REF!
Rate per cum to be adopted in DPR Cum #REF!
23 15.5 2504 Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Taking output = 1 cum
Graded stone aggregate of required size cum 1.20 678.14 813.77
Mazdoor (Skilled) day 0.25 385.00 96.25
Mazdoor * day 1.00 304.00 304.00
c) Overhead charges @ 0.2 on (a+b) 246.01
d) Contractor's profit @ 0.1 on (a+b+c) 147.61
Rate per cum = (a+b+c+d) 1623.69
Add:Carriage Charge for Boulder 1.20 #REF! #REF!
Add 1% Cess for Labour Welfare #REF!
Rate per cum to be adopted in DPR Cum #REF!
24 13.8 2706 & 2200 Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Taking output = 30 Nos.
AC pipe 100 mm dia. (including wastage @ 5 per cent) metre 31.50 44.28 1394.82
Average length of weep hole is taken as one metre for the purpose of estimating.
MS clamp each. 30.00 43.36 1300.80
collar for AC pipe (average) taking 10% of above pipe rate each. 10.00 4.43 44.28
Cement mortar 1:3 (Rate as in Item 12.6) cum 0.05 3137.00 156.85
Mazdoor day 0.25 304.00 76.00
c) Overhead charges @ 0.2 on (a+b) 637.28
d) Contractor's profit @ 0.1 on (a+b+c) 382.37
Cost for 30 m = a+b+c+d 4206.02
Rate per No. (a+b+c+d)/30 140.20
SOR Rate Rs. 140.00 0.96 No. 134.4
Add 1% Cess for Labour Welfare 2.74
Rate per No to be adopted in DPR No. 137.14
25 13.9 Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification
Add:Carriage Charge for Sand Cum 1.20 2,972.56 3,567.07
Add 1% Cess for Labour Welfare 40.89
Rate per Cum to be adopted in DPR Cum 4,130.21
26 13.10 710.1.4.of IRC:78 and 2200 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Taking output = 10 cum.
Mazdoor for filling, watering, ramming etc. day 7.00 304.00 2128.00 L-13
Mazdoor (Skilled) day 1.00 385.00 385.00 L-15
Filter media of stone aggregate conforming to clause 2504.2.2. of MoRTH specifications. cum 12.00 678.14 8137.68 M-012
Water Tanker of 6 KL capacity hour 0.06 707.00 42.42 P&M-060
d) Overhead charges @ 0.25 on (a+b+c) 2698.96
e) Contractor's profit @ 0.1 on (a+b+c+d) 1349.48
cost for 10 cum of Fiter Media = a+b+c+d+e 14844.25
Rate per cum = (a+b+c+d+e)/10 1484.43
Add:Carriage Charge for stone aggregate Cum 1.20 4,320.40 5,184.48
Add 1% Cess for Labour Welfare 66.09
Rate per Cum to be adopted in DPR Cum 6,675.21
27 9.2 Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .
A Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
SOR Rate 3,746.00
Add:Carriage Charge for 1000 mm Dia HP Per m 1 #REF! #REF!
Add 1% Cess for Labour Welfare #REF!
Rate per m to be adopted in DPR m #REF!
Junior Engineer Asstt. Engineer Executive Engineer
4.12 406 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Taking output = 225 cum (495 tonnes)
Mazdoor skilled day 2.000 385.00 770.00 L-15
Wet mix plant of 75 tonne hourly capacity hour 6.600 329.00 2171.40 P&M-094
Electric generator 125 KVA hour 6.000 1587.00 9522.00 P&M-018
Front end loader 1 cum capacity hour 6.000 1366.00 8196.00 P&M-017
Paver finisher hour 6.000 2078.00 12468.00 P&M-035
Vibratory roller 8 - 10 tonne hour 6x0.65 1978.00 7714.20 P&M-059
Smooth 3 wheeled steel roller @ 8-10 tonnes. hour 12.000
Water tanker 6 KL capacity hour 3.000 707.00 2121.00 P&M-060
Tipper tonne.km 495 x L 9.41 4657.95 Lead =1 km & P&M-047
Add 10 per cent of cost of carriage to cover cost of loading and unloading 465.80
c) Material ( Table 400-11)
2.36 mm to 75 micron@ 30 per cent cum 89.100 262.42 23381.62 M-022
Cost of water KL 18.000 56.20 1011.60 M-189
d) Overhead charges @ 0.12 on (a+b+c) 30301.11
e) Contractor's profit @ 0.1 on (a+b+c+d) 28281.03
Cost for 225 cum = a+b+c+d+e 311091.37
Rate per cum = (a+b+c+d+e)/225 1382.63
Total Cost say 1383.00
1 4.12 406 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
By Mechanical Means with 1 km lead
Taking output = 100 cum
Dresser (Skilled) for alignment day 8.00 385.00 3,080.00
Mazdoor (Skilled) day 2.00 385.00 770.00
Front end loader 1 cum capacity hour 4.00 1,366.00 5,464.00
Wet mix plant (Pug Mill) hour 4.00 329.00 1,316.00
Tipper/Dumper (10-t) capacity hour 5.00 1,371.00 6,855.00
Tractor Mounted grader for Grading @ 100 Cum Per Houre hour 4.00 549.10 2,196.40
Water tanker 6 kl capacity hour 1.33 707.00 940.31
Three wheel 80-100 kN static roller @ 16 cum per hour hour 6.25 1,518.00 9,487.50
Coarse aggregate 45 mm to 22.4 mm @ 30 per cent cum 39.90 1,080.50 43,111.95
Aggregates 22.4 mm to 2.36 mm @ 40 per cent cum 53.20 886.00 47,135.20
Fine aggregate/Crushed sand 2.36 mm to 75 micron @ 30 per cent cum 39.90 262.42 10,470.56
d) Overhead charges @ 6 % on (a+b+c) 7,884.30
Contractor's profit @ 10% on (a+b+c) 13,928.92
Cost for 100 cum = a+b+c+d+e 153,218.13
Rate per cum = (a+b+c+d+e)/100 1,532.18
Add:Carriage Charge for Stone Aggregate Cum 0.93 3796.24 3530.50
Carriage for material below 2.36 mm Cum 0.40 3796.24 1518.50
Rate per cum with carriage 6581.18
Total Cost cum 1,532.18
2 5.6 507 Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Taking output = 195 cum (450 tonnes)
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction day 16.000 304.00 4864.00
Skilled mazdoor for checking line & levels day 5.000 385.00 1925.00
Batch mix HMP @ 75 tonne per hour hour 6.000 0.00 0.00
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 6346.00 38076.00
Generator 250 KVA hour 6.000 3034.00 18204.00
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00
Tipper 10 tonne capacity tonne.km 450 x L 9.41 4234.50
Add 10 per cent of cost of carriage to cover cost of loading and unloading 423.45
smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 6.00x0.65* 1518.00 5920.20
Vibratory roller 8 tonnes for intermediate rolling. hour 6.00x0.65* 1978.00 7714.20
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 6.00x0.65* 1978.00 7714.20
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 tonne 19.130 60994.42 1166823.25
Total weight of mix = 450 tonnes
Weight of bitumen = 19.13 tonnes
Weight of aggregate = 450 -19.13 = 430.87 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 287.25 cum
Grading - I40 mm (Nominal Size)
4.75 mm and below 44 per cent cum 126.390 424.21 53615.90
Filler @ 2 per cent of weight of aggregates. tonne 8.620 3873.95 33393.45
Grading - II 19 mm (Nominal Size)
5 mm and below 40 per cent cum 114.900 424.21 48741.73
Filler @ 2 per cent of weight of aggregates. tonne 8.620 3873.95 33393.45
* Any one of the alternative may be adopted as per approved design
For Grading II ( 19 mm nominal size )
d) Overhead charges @ 12% on (a+b+c) 176396.32
e) Contractor's profit @ 10% on (a+b+c+d) 164636.57
Cost for 195 cum = a+b+c+d+e 1811002.25
Rate per cum = (a+b+c+d+e)/195 (For Grading II) 9287.19
Add:Carriage Charge for Stone Aggregate Cum 1.44 3796.24 5466.59
Add:Carriage Charge for Bitumen MT 0.10 1583.80 158.38
Rate per cum with carriage 14912.16
Total Cost cum 9,287.00
3 5.7 508 Semi-Dense Bituminous Concrete
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects
Taking output = 195 cum (450 tonnes)
Mazdoor working with HMP, mechanical broom, paver, roller, asphalt cutter and assistance for setting out lines, levels and layout of construction day 16.000 304.00 4864.00
Skilled mazdoor for checking line & levels day 5.000 385.00 1925.00
Batch mix HMP @ 75 tonne per hour hour 6.000 0.00 0.00
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000 6346.00 38076.00
Generator 250 KVA hour 6.000 3034.00 18204.00
Front end loader 1 cum bucket capacity hour 6.000 1366.00 8196.00
Tipper 10 tonne capacity tonne.km 450 x L 9.41 4234.50
Add 10 per cent of cost of carriage to cover cost of loading and unloading 423.45
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 6.00x0.65* 1518.00 5920.20
Vibratory roller 8 tonnes for intermediate rolling. hour 6.00x0.65* 1978.00 7714.20
Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 6.00x0.65* 1978.00 7714.20
* Grading I: 13 mm (Nominal Size)
i) Bitumen@ 4.5 per cent of weight of mix tonne 20.250 60994.42 1235137.00
Total weight of mix = 450 tonnes
Weight of bitumen = 20.25 tonnes
Weight of aggregate = 450-20.25 = 429.75 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.5 cum
5 mm and below 40 per cent cum 114.600 424.21 48614.47
Filler @ 2 per cent of weight of aggregates. tonne 8.620 3873.95 33393.45
Grading II: 10 mm (Nominal Size)
Bitumen@5 per cent of weight of mix tonne 22.500 60994.42 1372374.45
weight of mix = 450 tonne
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
4.75 and below@ 41 per cent cum 116.850 424.21 49568.94
Filler @ 2 per cent of weight of aggregates. tonne 8.620 3873.95 33393.45
*Any one of the alternative may be adopted as per approved design
(i) for Grading I ( 13 mm nominal size )
d) Overhead charges & Contractor's profit @ 12.5% on (a+b+c) 195683.17
Cost for 205 cum = a+b+c+d+e 1761148.50
Rate per cum = (a+b+c+d+e)/195 (For Grading I) 9031.53
5.7 (ii) for GradingII(10 mm nominal size)
d) Contractor's profit @ 12% on (a+b+c) 197768.85
e)Contractor's profit @ 10% on (a+b+c+d) 184584.26
Cost for 195 cum = a+b+c+d+e 2030426.83
Rate per cum = (a+b+c+d+e)/195 (For Grading-II) 10412.45
for GradingII (10 mm nominal size)
Add:Carriage Charge for Stone Aggregate Cum 1.480 3796.24 5618.44
Add:Carriage Charge for Bitumen MT 0.120 1583.80 190.06
Rate per cum with carriage 16220.94
Total Cost cum 10,412.00
5.1 5.1 Prime Coat
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
Taking output = 3500 sqm
Mazdoor day 2.000 304.00 608.00
Mechanical broom @ 1250 sqm per hour hour 2.800 746.00 2088.80
Air compressor 250 cfm hour 2.800 391.00 1094.80
Bitumen pressure distributor @ 1750 sqm per hour hour 2.000 1299.00 2598.00
Water tanker 6 KL capacity @ 1 trip per hour hour 1.000 707.00 707.00
Bitumen emulsion @ 0.6 kg per sqm tonne 2.100 55568.42 116693.68
Cost of water KL 6.000 56.20 337.20
d) Overhead charges @ 0.12 on (a+b+c) 14898.38
e) Contractor's profit @ 0.1 on (a+b+c+d) 13905.15
Cost for 3500 sqm = a+b+c+d+e 152956.70
Rate per sqm = (a+b+c+d+e)/3500 43.70
Carriage Charge for Bitumen emulsion tonne 0.00060 1583.80 0.95
Add 1% (1% for Labour Cess) 1% 0.00
Rate per sqm to be adopted in DPR sqm 43.70
Note Bitumen primer has been provided @ 0.60 kg per sqm as per clause 502.8. Payment shall be made with adjustment, plus or minus, for the variation between this quantity and the actual quantity approved by the Engineer after the preliminary trials referred to in clause No. 502.4.3.
5.2 5.2 Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Taking output = 3500 sqm
Mazdoor day 2.000 304.00 608.00
Mechanical broom @ 1250 sqm per hour hour 2.800 746.00 2088.80
Air compressor 250 cfm hour 2.800 391.00 1094.80
Emulsion pressure distributor @ 1750 sqm per hour hour 2.000 1299.00 2598.00
Bitumen emulsion @ 0.2 kg per sqm tonne 0.700 55568.42 38897.89
d) Overhead charges @ 0.12 on (a+b+c) 5437.58
e) Contractor's profit @ 0.1 on (a+b+c+d) 5075.08
Cost for 3500 sqm = a+b+c+d+e 55825.83
Rate per sqm = (a+b+c+d+e)/3500 15.95
Carriage Charge for Bitumen emulsion tonne 0.00020 1583.80 0.32
Add 1% (1% for Labour Cess ) 1% 0.00
Rate per sqm to be adopted in DPR sqm 16.00
5.11 509 MIX SEAL SURFACE (TYPE-B) BITUMINOUS (S-90) By Mechanical Means
Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
By Mechanical Means
(I) Bitumen (S-90)
Taking output = 4000 sqm (80 cum)
Mazdoor (Unskilled) day 10.00 304.00 3,040.00
Mazdoor (Unskilled) for Waste Plastic day 2.00 304.00 608.00
Mazdoor (Skilled) day 3.00 385.00 1,155.00
HMP of appropriate capacity hour 6.00 0.00 0.00
Electric generator set 125 KVA hour 6.00 1,587.00 9,522.00
Front end loader 1 cum bucket capacity hour 6.00 1,366.00 8,196.00
Tipper 5.5 10 t capacity tonn.km 3.60 1,371.00 4,935.60
Add 10 per cent of cost of carriage to cover cost of loading and unloading 493.56
Paver finisher hour 6.00 2,078.00 12,468.00
Three wheel 80-100 kN static roller hour 18.00 1,518.00 27,324.00
Bitumen (S-90) @ 19 kg per 10 sqm replaced by 8% by Waste Plastic i.e. 19x 0.92=17.48kg per 10 sqm t 7.600 60,194.42 457,477.59
Processed Waste Plastic i.e 8% of 19 kg bitumen = 1.52 kg per 10 sqm t 0.000 0.00 0.00
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum per 10 sqm cum 108.00 424.21 45,814.68
d) Over Heads @ 12% on (a+b+c) 68,544.16
e) Contractors Profit @ 10% on (a+b+c+d) 63974.55
Cost of 4000 sqm = a+b+c+d 703,720.07
Rate per sqm = (a+b+c+d)/4000 175.93
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Sr No Ref. to MoRTH Spec. Description Unit Quantity Rate Rs Cost Rs Remarks/ Input ref.
8.2 408 Cast in Situ Cement Concrete M 20 Kerb with Channel
Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408
Using Concrete Mixer
Unit = Running metre
Taking output = 300 metre length
Cement Concrete
Cement concrete of grade M20= 17.48 cum
Cement concrete of grade M10 for base = 23.18 cum
Total Concrete = 40.66 cum
Kerb casting machine @ 50 metres/hour for laying kerb and channel hour 6.000 1468.00 8808.00 P&M-029
Concrete mixer 0.48/0.28 hour 16.000 283.00 4528.00 P&M-009
Water tanker6 KL capacity hour 6.000 707.00 4242.00 P&M-060
Crushed stone aggregate 20 mm nominal size 60 per cent cum 36.590 1186.00 43395.74 M-053
Coarse sand 30 per cent cum 18.300 494.00 9040.20 M-005
Cement 10 per cent tonne 9.010 6240.40 56226.00 M-081
Cost of water KL 36.000 56.20 2023.20 M-189
d) Overhead charges @ 0.12 on (a+b+c) 16100.91
e) Contractor's profit @ 0.1 on (a+b+c+d) 15027.52
Cost for 360 meter = a+b+c+d+e 165302.69
Rate per metre = (a+b+c+d+e)/300 551.01
SOR Rate 551.00
Add:Carriage Charge for Stone Agg cum 0.900 3,796.24 3,416.24
Add:Carriage Charge for Cement tonne 0.222 366.50 81.21
Add:Carriage Charge for Sand cum 0.450 2,972.56 1,337.87
Rate per running m to be adopted in DPR m 551.00
8.8 803 Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Taking output = 40 sqm
Painter day 2.000 386.00 772.00 L-18
Mazdoor day 1.000 304.00 304.00 L-13
Paint conforming to requirement of clause 803.3. Litre 6.000 246.65 1479.90 M-132
Add for scaffolding @ 1 per cent of labour cost where required 11.15
c) Overhead charges @ 0.12 on (a+b) 312.67
d) Contractor's profit @ 0.1 on (a+b+c) 291.82
Cost for 40 sqm = a+b+c+d 3210.06
Rate per sqm = (a+b+c+d)/40 80.25
8.29 Cable Duct Across the Road
RCD Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill ofgranular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Unit = Running metre
Unit = Rm Taking output = 20metres
Taking output = 20 m a) Brick masonry in cement mortar 1:3 for head wall both side cum 2.36 4004.503884 0
a) Labour b) Labour
Mazdoor (skilled) day 0.250 385.00 96.25
Mazdoor (Unskilled) day 1.000 304.00 304.00 Mazdoor day 1 144 144
b) Material Mazdoor skilled day 0.25 183 45.75
Reinforced Cement Concrete pipe 300 mm dia with collar Rm 20.000 532.24 10644.80 c) Material
Local Sand for bedding and sides of pipe Cum 7.200 143.32 1031.90
Collar for joints 300 mm dia Each 0.000 118.00 0.00
Cement mortar 1:2 for joints Cum 0.020 4401.35 88.03 Reinforced Cement Concrete pipe 300 mm dia metre 20 345.4 6908
c) Machinery Granular soil with PI less than 6 for bedding and sides of pipe (0.6 x 0.6 x 20 m) cum 7.2 125.7 905.04
Tractor-trolley Hour 0.500 612.00 306.00 Collar for joints 300 mm dia each 9 0 0
Over Heads @ 12% on (a+b+c) 1498.44 d) Machinery
Contractors Profit @ 10% on (a+b+c+d) 1398.55
Cost for 20 Rm = a+b+c+d+e 15384.02 e) Overhead charges @ 0.1 on (b+c+d) 826.128
Rate per Rm = a+b+c+d+e)/20 Sub Total 769.20 f) Contractor's profit @ 0.1 on (b+c+d+e) 908.7408
9.3 1100 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
Taking output =7.5 m
( 3 pipes of 2.5 m length each )
ii ) Cement ton 0.03 6240.40 187.21
iii) RCC pipe NP 3 pipe including collar m 7.50 5570.00 41775.00
Mason ( 1st class ) day 0.25 408.00 102.00
Mazdoor ( Unskilled ) day 2.00 304.00 608.00
c) Over Heads @ 12% on (a+b) 5124.82
d) Contractors Profit @ 10% on (a+b+c) 4783.17
Cost for 7.5m = ( a+b+c+d) 52614.82
Rate per m =(a+b+c+d)/7.5 7015.31
Sr. No. Ref to MORD Sp. Description Unit Quantity Rate (Rs.) Amount (Rs.)
15.1 1900 Restoration of Rain Cuts
i) Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and technical specifications Clause 1902
A. Manual Means
Taking output = 10 cum
Mazdoor (Unskilled) day 6.00 304.00 1,824.00
Plate compactor hour 3.00 3,615.00 10,845.00
Compensation for earth Taken from private land cum 7.50 35.01 262.58
d) Overheads @ 12 %on a+b+c 1,561.03
e) Contractor’s profit @10.00 %on a+b+c+d 1,456.96
Cost for 10 cum = a+b+c+d 16,026.61
Rate per cum = a+b+c+d/10 1,602.66
Total Cost cum 1,602.66 16.03
15.2 1900 1. Maintenance of Earthen shoulder (filling with fresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per technical specification Clause 1903
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
Mazdoor (Unskilled) day 5.00 304.00 1,520.00
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour hour 0.25 2,202.00 550.50
Tipper 5.5 cum hour 0.68 1,371.00 932.28
Add 10% cost of transportation to cover cost of loading and unloading 93.23
Plate compactor @ 25 sqm per hour hour 4.00 3,615.00 14,460.00
Compensation of earth cum 15.00 35.01 525.15
d. Overheads @ 12 % on a+b+c 2,177.44
e Contractor’s profit @10 % on a+b+c+d 2,032.28
Cost for 100 sqm = a+b+c+d 22,355.08
Rate per sqm = (a+b+c+d )/100 223.55
Total Cost Sqm 223.55 2.24
2. Maintenance of Earhen shoulder (stripping of excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
Mazdoor (Unskilled) day 2.50 304.00 760.00
Plate compactor hour 4.00 3,615.00 14,460.00
c. Overheads @ 12 % on a+b+c 2,440.34
d. Contractor’s profit @10 % on a+b+c 1,769.24
Cost for 100 sqm = a+b+c 19,461.68
Rate per sqm = a+b+c /100 194.62
Total Cost Sqm 194.62 1.95
Note: Earth stripped from earthen shoulders to be used as shoulders or dumped on the side slopes locally for disposal.
15.3 1900 Maintenace of bituminous surface road
i. Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75mm B.M, applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per technical specifications Clauses 502 and 503.
Taking output = 187.5x0.075 = 14.06 cum = (30.94 Tonne)
(5% area of one km)
Mazdoor (Unskilled) day 20.00 304.00 6,080.00
Jack hammer 25 kg with tractor hour 4.00 934.00 3,736.00
Compressor 210 cfm with tractor hour 2.00 391.00 782.00
Emulsion pressure distributor hour 4.00 1,299.00 5,196.00
Mixall 6/10 t capacity hour 4.00 3,615.00 14,460.00
Three wheeled 80-100 kN Static Roller hour 4.00 1,518.00 6,072.00
Primer with bitumen emulsion @ 9 kg/10 sqm 187.5x9 = 168.75 kg. Tonne 0.168 55,568.42 9,335.49
Tack coat with bitumen emulsion @ 3.0 kg/ 10 sqm
Bitumen for BM @ 3.5% by weight of mix = 30.94 x 3.5 / 100 = 1.082 Tonne 1.082 60,994.42 65,995.96
Weight of mix (BM) 14.06 cum = (30.94 tonne)
Weight of Bitumen = 1.082
Weight of aggregate 30.94 -1.082 = 29.86
Taking density of aggregate 1.5 t per cum
Volume of aggregate 29.86 / 1.5 = 19.90 cum
Grading (1) (40 mm nominal size)
d) Overheads @ 12 % on a+b+c 15,697.40
d) Contractor’s profit @10 % on a+b+c 14,650.91
Cost of 14.06 cum = a+b+c+d 161,159.98
Rate per cum = a+b+c+d /14.06 11,462.30 114.62
Bitumin Emulsion tonne 0.01650071124 1397.61 23.06
Rate per cum with carriage 14062.72 26.00
Total Cost Cum 11,462.30
ii. Patch repair on already filled pot holes with 75 mm BM with 20 mm premix surfacing material as per drawings and technical specification Clause 1904.2
Takign output = 200 sqm
Mazdoor (Unskilled) day 16.00 304.00 4,864.00
Mixall 6/10 tonne hour 2.00 3,615.00 7,230.00
Bitumen pressure distributior hour 2.00 1,299.00 2,598.00
Three wheeled 80-100 kN Static Roller hour 4.00 1,518.00 6,072.00
Bitumen for pre-mix carpet @ 14.60 kg/10 sqm 200x14.60/10 =292 kg tonne 0.292 60,994.42 17,810.37
Bitumen for tack coat @ 2 kg per 10 sqm 200 x 2 / 10 = 40 kg tonne 0.04 55,568.42 2,222.74
Bitumen for seal coat @ 6.8 kg per 10 sqm 200 x 6.8 / 10 = 136 kg tonne 0.000 60,994.42 0.00
Crushed stone aggregate @ 0.27 cum per 10 sqm = 200 x 0.27 / 10 = 5.4 cum cum 5.40 1,186.00 6,404.40
Crushed sand passing 2.36 mm sieve and retained on 180 mircon sieve @ 0.06 cum per 10 sqm cum 1.20 262.42 314.90
d) Overheads @ 12 % on a+b+c 5,979.60
d) Contractor’s profit @10 % on a+b+c 5,580.96
Cost of 200 sqm = a+b+c+d 61,390.57
Rate/sqm = a+b+c+d /200 306.95 3.07
Bitumen Emulsion Ton 0.0002 1397.61 0.28
Aggregate cum 0.033 1745.00 57.59
Rate per cum with carriage 367.82 0.61
Total Cost Sqm 306.95
iii. Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 20 mm thick premix surfacing material specification Clause 1904.2
Taking output = 200 sqm
Mazdoor (Unskilled) day 20.00 304.00 6,080.00
Air compressor 210 cfm with tractor hour 2.00 391.00 782.00
Bitumen pressure distributor hour 2.00 1,299.00 2,598.00
Mixall 6/10t capacity hour 2.00 3,615.00 7,230.00
Three wheeled 80-100 kN Static Roller hour 4.00 1,518.00 6,072.00
Bitumen for tack coat @ 3kg per 10 sqm 200 x 3 / 10 = 60 kg tonne 0.064 60,994.42 3,903.64
Bitumen for pre-mix carpet @ 14.60 kg per 10 sqm = 200 x 14.6 / 10 = 292 kg tonne 0.29 60,994.42 17,810.37
Bitumen for seal coat @ 6.8 kg per 10 sqm = 200 x 6.8 / 10 = 136 kg tonne 0.00 60,994.42 0.00
Crushed stone aggregate @ 0.27 cum per 10 sqm = 200 x 0.27 / 10 = 5.4 cum cum 5.40 1,186.00 6,404.40
Crushed sand passing 2.36 mm sieve and retained on 180 micron sieve @ 0.06 cum per 10 sqm 200 x 0.06 / 10 = 1.20 cum cum 1.20 262.42 314.90
d) Overheads @ 12 % on a+b+c 6,174.25
d) Contractor’s profit @10 % on a+b+c 5,762.64
Cost for 200 sqm = a+b+c+d 63,389.01
Rate per sqm = a+b+c+d /200 316.95 3.17
Bitumin Emulsion tonne 0.00115 1397.61 1.61
Bitumin 80/100 tonne 0.0054 1397.61 7.55
Aggregate Cum 0.033 1745.00 57.59
Rate per cum with carriage 383.68 0.67
Total Cost Sqm 316.95
15.5 1900 Maintenance of WMM Road :-- Maintenance of WMM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification Clause 1906.
Output - Taking affected area @ 5% in 1 km = 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a) Rate as per item No. 4.12 of Chapter 4 cum 14.06 1,383.00 19,444.98
b) Add 50% for Extra Efforts involved on maintenance to be done in Small reachs 9,722.49
Cost of 187.5 Sqm = a+b 29,167.47
Rate of per sqm a+b/187.5 155.56
The cost of 25% retrived material may be deducted from rates. 38.89
Rate per sqm with carriage 116.67
Total Cost Sqm 116.67
15.6 1900 Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907.
Unit - Per Metre
Taking output one km = 1000 metre
Mazdoor (Unskilled) day 8.00 304.00 2,432.00
b) Overheads @ 12 % on a 304.17
b) Contractor’s profit @10 % on a 283.89
Cost for 1000 metre = a+b 3,122.78
Rate per Metre = a+b /1000 3.12
Total Cost per Metre 3.12 0.03
15.7 1900 (I) Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
Unit = One No. Hume pipe (1000 mm dia)
Taking output = One No.H.P. Culvert
Mazdoor (Unskilled) day 1.00 304.00 304.00
Mason 2nd Class day 1.40 364.00 509.60
Cement, Sand, Brick, Boulder etc. L.S 200.00
c) Overheads @ 12 % on a+b 125.48
c) Contractor’s profit @10 % on a+b 117.12
Cost for one No. Hume pipe culvert = a+b+c 1,288.30
Rate per hume pipe Culvert = a+b+c 1,288.30
Total Cost Per hume pipe Culvert 1,288.30
(II) Maintenance of Culverts Slab type
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908
Unit = One No. Culvert (2 m span)
Taking output = one No. Slab Culvert
Mazdoor (Unskilled) day 4.00 304.00 1,216.00
Mason 2nd Class day 1.00 364.00 364.00
Cement, Sand, Bricks, Stone Boulder etc. L.S 500.00
c) Overheads @ 12 % on a+b 257.30
c) Contractor’s profit @10 % on a+b 240.15
Cost for One Slab Culverts =a+b+c 2,641.65
Rate per Culvert = a+b+c 2,641.65
Total Cost Per Culvert 2,641.65
15.9 1900 Maintenance of Road Signs
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Taking output = one km
All types of signs in one Km
Mazdoor (Unskilled) day 2.00 304.00 608.00
Painter 1st Class day 0.125 386.00 48.25
Synthetic Enamel Paint, Engineering grade tape, welding machine etc. (LS Rs.300) LS 300.00
c) Overheads @ 12 % on a+b 118.22
c) Contractor’s profit @10 % on a+b 110.34
Cost for one Km = a+b+c 1,213.69
Rate per km = a+b+c 1,213.69
Total Cost Per Km 1,213.69
15.10 1900 Maintenance of steel and RCC Railing
(ii) Repair of RCC railing to bring it to the original shape, cleaning and repainting as per drawings and technical specification Clause 1911
Unit = running metre
Taking output = 1 metre
It is assumed that damage is to the extent of 10%
Mazdoor (Unskilled) day 0.20 304.00 60.80
Mason 1st Class day 0.10 408.00 40.80
M 25 grade cement concrete
Rate as per item no. 13.1 (III) of Chapter 13 cum 0.10 5,293.44 529.34
Steel bars reinforcement
Rate as per item no.13.2 of Chapter 13 t 0.013 100,346.88 1,304.51
c) Overheads @ 12 % on a+b 232.72
c) Contractor’s profit @10 % on a+b 217.20
Rate per metre = a+b+c 2,389.22
Total Cost Per metre 2,389.22 21.72
15.11 1900 Maintenance of 200 metre and km stones
Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912
Assuming 1 km stone, 4 nos 200 metre stone and 1/5th 5km stone
(i) Painting two coats with synthetic enamel paint
200 m stone 4 nos = 0.760 sqm.
One km stone = 0.815 sqm.
5th km stone 1x1/5 = 0.320 sqm.
Total = 1.895 sqm.
As per item No. 8.8 of chapter 8 sqm 1.895 80.00 151.60
(ii) Printing letters and figures of any shade with synthtic enamel paint of any approved colour to give an even shade
200 m stone 4 Nos. = 40 per cm height per letter
One no km stone = 120 per cm height per letter
5th km stones 1/5th = 60 per cm height per letter
Total = 220 per cm height per letter
Rate as per item no 10.1 of chapter 10 per cm height per letter 220.00 0.80 176.00
Mazdoor day 0.50 304.00 152.00
Mason 1st Class day 0.10 408.00 40.80
Cement, sand, aggregates etc. LS 100.00
c) Overheads @ 12 % on a+b 36.06
c) Contractor’s profit @10 % on a+b 33.66
Cost for one km = (i+ii+a+b+c ) 697.82
Rate per/km = (i+ii+a+b+c ) 697.82
Total Cost Per Km 697.82
15.12 1900 Cutting of branches of trees shrubs and trimming of grass and weeds
(i) Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914
Unit = one tree
Taking output = 10 trees of 900 mm average girth
Mazdoor (Skilled) day 1.00 385.00 385.00
Mazdoor (Unskilled) day 2.00 304.00 608.00
b) Overheads @ 12 % on a 123.78
b) Contractor’s profit @120 % on a 115.53
Cost for 10 trees = (a+b ) 1,270.83
Rate per tree = (a+b )/10 127.08
Total Cost Per tree 127.08 1.27
(ii) Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914
Taking output = 100 nos shrubs
Mazdoor (Unskilled) day 2.00 304.00 608.00
b) Overheads @12 % on a 76.04
b) Contractor’s profit @10 % on a 70.97
Cost for 100 shurbs = a+b 780.69
Rate per shurb = a+b /100 7.81
Total Cost Per shurb 7.81 0.08
(iii) Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
Taking output = 1500 sqm
Mazdoor (Unskilled) day 10.00 304.00 3,040.00
b) Overheads @ 12 % on a 380.21
b) Contractor’s profit @10 % on a 354.86
Cost for 1500 sqm = a+b 3,903.47
Rate per sqm = a+b /1500 2.60
Total Cost Per sqm 2.60 0.03
15.13 1900 White washing of parapet walls of CD work and tree truncks
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Taking output = 9 sqm
Mazdoor (Unskilled) day 0.143 304.00 43.43
White washer day 0.143 386.00 55.14
Lime quintel 0.045 3,873.95 174.33
Fevicol adhesive kg 0.10 0.00 0.00
c) Overheads @ 12 % on a+b 34.06
c) Contractor’s profit @10 % on a+b 31.79
Cost for 9 sqm = a+b+c 349.71
Rate per sqm = a+b+c /9 38.86
Total Cost Per sqm 38.86 0.389
(A) Usage Rates of Plant and Machinery
Sl. No. Description of Machine Activity Output of Machine Output Unit Rate
P&M-001 Air Compressor General Purpose capacity in cfm 170/250 hour 391.00
P&M-002 Batching and Mixing Plant (a) 30 cum capacity Concrete Mixing cum/hour 20 hour 3751.30
P&M-003 Batching and Mixing Plant (b) 15 - 20 cum capacity Concrete Mixing cum/hour 13 hour 1937.70
P&M-004 Bitumen Pressure Distributor Applying bitumen tack coat sqm/hour 1750 hour 1299.00
P&M-005 Bitumen Boiler oil fired Bitumen Spraying capacity in litre 1500 hour 510.00
P&M-006 Concrete Paver Finisher with 40 HP Motor Paving of concrete surface cum / hour 20 hour 1478.40
P&M-007 Concrete Pump of 45 & 30 cum capacity Pumping of concrete cum / hour 33 / 22 hour 960.00
P&M-008 Concrete Bucket For Pouring concrete capacity in cum 1 hour 86.00
P&M-009 Concrete Mixer (a) 0.4/0.28 cum Concrete Mixing cum/hour 2.5 hour 283.00
P&M-010 Concrete Mixer (b) 1 cum Concrete Mixing cum/hour 7.5 hour 313.00
P&M-011 Crane (a) 80 tonnes Lifting Purpose hour 1936.00
P&M-012 Cranes b) 35 tonnes Lifting Purpose hour 1747.00
P&M-013 Cranes c) 3 tonnes Lifting Purpose hour 765.00
P&M-014 Dozer D - 80 - A 12 Spreading /Cutting / Clearing cum/hour 300/ 150/250 hour 5523.00
P&M-015 Dozer D - 50 - A 15 Spreading /Cutting / Clearing cum/hour 200/ 120/150 hour 2930.00
P&M-016 Emulsion Pressure Distributor Applying emulsion tack coat sqm/hour 1750 hour 1299.00
P&M-017 Front End loader 1 cum bucket capacity Soil loading / Aggregate loading cum/hour 60 /25 hour 1366.00
P&M-018 Generator (a) 125 KVA Genration of electric Energy KVA 100 hour 1587.00
P&M-019 Generator( b) 63 KVA Genration of electric Energy KVA 50 hour 869.00
P&M-020 GSB Plant 50 cum Producing GSB cum/hour 40 hour 1572.90
P&M-021 Hotmix Plant - 120 TPH capacity DBM/BM/SDC/ Premix cum/hour 40 hour 26375.00
P&M-022 Hotmix Plant - 100 TPH capacity DBM/BM/SDC/ Premix cum/hour 30 hour
P&M-023 Hotmix Plant - 60 to 90 TPH capacity DBM/BM/SDC/ Premix cum/hour 25 hour
P&M-024 Hotmix Plant - 40 to 60 TPH capacity DBM/BM/SDC/ Premix cum/hour 17 hour 18776.00
P&M-025 Hydraulic Chip Spreader Surface Dressing sqm/hour 1500 hour 1602.00
P&M-026 Hydraulic Excavator of 1 cum bucket Soil Ordinary/Soil Marshy / Soil Unsuitable cum/hour 60 /60 /60 hour 2202.00
P&M-027 Integrated Stone Crusher 100THP Crushing of Spalls TPH 100 hour 13110.30
P&M-028 Integrated Stone Crusher 200 HP Crushing of Spalls TPH 200 hour 13481.00
P&M-029 Kerb Casting Machine Kerb Making Rm/hour 80 hour 1468.00
P&M-030 Mastic Cooker Mastic Wearing coat capacity in tonne 1 hour 450.00
P&M-031 Mechanical Broom Hydraulic Surface Cleaning sqm/hour 1250 hour 746.00
P&M-032 Motor Grader 3.35 mtr blade Clearing /Spreading /GSB /WBM cum/hour 200/200/50/50 hour 4403.00
P&M-033 Mobile slurry seal equipment Mixing and laying slurry seal sqm/hour 2700 hour 3392.00
P&M-034 Paver Finisher Hydrostatic with sensor control 100 TPH Paving of DBM/ BM/SDC/ Premix cum/hour 40 hour 6346.00
P&M-035 Paver Finisher Mechanical 100 TPH Paving of WMM /Paving of DLC cum/hour 40/30 hour 2078.00
P&M-036 Piling Rig with Bantonite Pump 0.75 m dia to 1.2 m dia Boring attachment Rm/hour 2 to 3 hour 17135.00
P&M-037 Pneumatic Road Roller Rolling of Asphalt Surface cum/hour 25 hour 1996.00
P&M-038 Pneumatic Sinking Plant Pneumatic Sinking of wells cum/hour 1.5 to 2.00 hour 5333.00
P&M-039 Pot Hole Repair Machine Repair of potholes cum/hour 4 hour 1235.00
P&M-040 Prestressing Jack with Pump & access Stressing of steel wires/stands hour 413.00
P&M-041 Ripper Scarifying cum/hour 60 hour 21.00
P&M-042 Rotavator Scarifying cum/hour 25 hour 17.00
P&M-043 Road marking machine Road marking Sqm/hour 100 hour 1349.00
P&M-044 Smooth Wheeled Roller 8 tonne Soil Compaction /BM Compaction cum/hour 70/25 hour 1518.00
P&M-045 Tandem Road Roller Rolling of Aspalt Surface cum/hour 30 hour 1978.00
P&M-046 Tipper - 5 cum Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 km 37.10
P&M-047 Tipper - 5 cum Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 tonne.km 9.41
P&M-048 Tipper - 5 cum Transportation of soil, GSB, WMM, Hotmix etc. Capacity in cum 5.5 hour 1371.00
P&M-049 Transit Mixer 4.0/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 hour 1406.00
P&M-050 Transit Mixer 4/4.5 cum Transportation of Concrete Mix to site cum/hour 4.5 tonne.km 7.00
P&M-051 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 hour 1289.30
P&M-052 Transit Mixer 3.0 cum Transportation of Concrete Mix to site cum/hour 3 tonne.km 9.30
P&M-053 Tractor Pulling capacity in HP 50 hour 549.10
P&M-054 Tractor with Rotevator Rate of Tractor + Rotevator hour 573.20
P&M-055 Tractor with Ripper Rate of Tractor 6+ Ripper hour 570.10
P&M-056 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 km 32.90
P&M-057 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 hour 934.30
P&M-058 Truck 5.5 cum per 10 tonnes Material Transport capacity/cum 4.5 tonne.km 3.50
P&M-059 Vibratory Roller 8 tonne Earth or soil / GSB / WBM cum/hour 100/60/60 hour 1978.00
P&M-060 Water Tanker Water Transport capacity in KL 6 hour 707.00
P&M-061 Water Tanker Water Transport capacity in KL 6 km 38.10
P&M-062 Wet Mix Plant 60 TPH Wet Mix cum/hour 25 hour 329.00
Plate compactor hour 3615
Jack hammer 25 kg with tractor hour 688
Mixall 6/10 t capacity hour 3615.00
Sl. No. Description of Machine Unit Rate
P&M-063 Air compressor with pneumatic chisel attachment for cutting hard clay. hour 939.30
P&M-064 Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne per hour hour 3751.30
P&M-065 Belt conveyor system hour input
P&M-066 Boat to carry atleast 20 persons hour 235.30
P&M-067 Cement concrete batch mix plant @ 175 cum per hour (effective output) hour 7877.60
P&M-068 Cement concrete batch mix plant @ 75 cum per hour hour 3375.10
P&M-069 Cold milling machine @ 20 cum per hour hour 1406.00
P&M-070 Crane 5 tonne capacity hour 765.00
P&M-071 Crane 10 tonne capacity hour 864.00
P&M-072 Crane 15 tonne capacity hour 899.00
P&M-073 Crane 20 tonne capacity hour 1125.00
P&M-074 Crane 40 T capacity hour 1747.00
P&M-075 Crane with grab 0.75 cum capacity hour 738.00
P&M-076 Compressor with guniting equipment along with accessories hour 235.30
P&M-077 Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour. hour 1822.30
P&M-078 Epoxy Injection gun hour 231.00
P&M-079 Generator 33 KVA hour 495.00
P&M-080 Generator 100 KVA hour 1359.00
P&M-081 Generator 250 KVA hour 3034.00
P&M-082 Induction, deinduction and erection of plant and equipment including all components and accessories for pneumatic method of well sinking. hour input
P&M-083 Joint Cutting Machine with 2-3 blades (for rigid pavement) hour 293.00
P&M-084 Jack for Lifting 40 tonne lifting capacity. day 239.00
P&M-085 Piling rig Including double acting pile driving hammer (Hydraulic rig) hrs 8266.90
P&M-086 Plate compactor hour 335.00
P&M-087 Snow blower equipment 140 HP @ 600 cum per hour hour input
P&M-088 Texturing machine (for rigid pavement) hour 118.70
P&M-089 Truck Trailor 30 tonne capacity hour 3751.30
P&M-090 Truck Trailor 30 tonne capacity t.km 3.50
P&M-091 Tunnel Boring machine hour input
P&M-092 Vibrating Pile driving hammer complete with power unit and accessories. hour input
P&M-093 Wet Mix Plant 100 TPH hour 329.00
P&M-094 Wet Mix Plant 75 TPH hour 329.00
Sl. No. Description of Labour Unit Rate Rate
L-01 Blacksmith (IInd class) day 364.00 211.00 184.00 108.00
L-02 a Blacksmith (Ist class) day 408.00 237.00 206.00 121.00
L-02 d Electrician day 386.00 224.00 195.00 115.00
L-03 Blaster (Stone cutter) day 502.00 294.00 256.00 150.00
L-04 Carpenter I Class day 408.00 237.00 206.00 121.00
L-05 Chiseller (Head Mazdoor) day 470.00 223.00 192.00 113.00
L-06 Driller (Jumper) day 316.00 211.00 192.00 113.00
L-10 Mason (IInd class) day 364.00 211.00 184.00 108.00
L-11 Mason (Ist class) day 408.00 237.00 206.00 121.00
L-12 Mate / Supervisor day 321.00 187.00 163.00 96.00
L-14 Mazdoor/Dresser (Semi Skilled) day 316.00 184.00 155.00 92.00
L-15 Mazdoor/Dresser/Sinker (Skilled) day 385.00 225.00 192.00 113.00
L-16 Medical Officer day 470.00 696.00 500.00 500.00
L-17 Operator(grouting) day 470.00 196.00 171.00 101.00
L-18 Painter I class day 386.00 224.00 195.00 115.00
L-19 Para medical personnel day 470.00 347.00 250.00 250.00
Sl. No. Description Unit SOR Rate Royality Final Rate with Royality
M-001 Stone Boulder of size 150 mm and below at Cruser Plant cum 525.00 150.00 675.00 291.65
M-002 Supply of quarried stone 150 - 200 mm size for Hand Broken at site cum 525.00 150.00 675.00 291.65
M-003 Boulder with minimum size of 300 mm for Pitching at Site cum 525.00 150.00 675.00 291.65
M-004 Coarse sand at Quarry (Equivalent to Koliwar sand) cum 419.00 75.00 494.00 132.17
M-005 Coarse sand at Quarry (Equivalent to Koliwar sand) cum 419.00 75.00 494.00 132.17
M-006 Fine sand at Site cum 68.32 75.00 143.32 112.85
M-007 Moorum at Site cum 77.00 83.00 160.00 126.71
M-008 Gravel/Quarry spall at Site Cum 205.79 150.00 355.79 291.65
M-009 Granular Material or hard murrum for GSB works at Site Cum 82.30 83.00 165.30 126.71
M-010 Granular Material or hard murrum for GSB works at Mixing Plant Cum 82.30 83.00 165.30 126.71
M-011 Fly ash conforming to IS: 3812 ( Part II & I) atHMP Plant / Batching Plant / Crushing Plant Cum 0.00 0.00 0.00
M-012 Filter media/Filter Material as per Table 300-3 (MoRT&H Specification) Cum 528.14 150.00 678.14 388.01
Description Unit SOR Rate Unit Final Basic Rate Rate at Quarry Site
M-013 Close graded Granular sub-base Material 53 mm to 9.5 mm cum 765.67 150.00 915.67 489.17
M-014 Close graded Granular sub-base Material 37.5 mm to 9.5 mm cum 765.67 150.00 915.67 466.87
M-015 Close graded Granular sub-base Material 26.5 mm to 9.5 mm cum 736.00 150.00 886.00 523.85
M-016 Close graded Granular sub-base Material 9.5 mm to 4.75 mm cum 436.00 150.00 586.00 503.26
M-017 Close graded Granular sub-base Material 9.5 mm to 2.36 mm cum 274.21 150.00 424.21 390.36
M-018 Close graded Granular sub-base Material 4.75mm to 2.36 mm cum 112.42 150.00 262.42 194.44
M-019 Close graded Granular sub-base Material 4.75mm to 75 micron mm cum 112.42 150.00 262.42 180.78
M-020 Close graded Granular sub-base Material 2.36 mm cum 112.42 150.00 262.42 180.78
M-021 Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve. cum 112.42 150.00 262.42 91.32
M-022 Coarse graded Granular sub-base Material 2.36 mm & below cum 112.42 150.00 262.42 180.78
M-023 Coarse graded Granular sub-base Material 4.75mm to 75 micron mm 112.42 150.00 262.42 180.78
M-024 Coarse graded Granular sub-base Material 4.75 mm to 2.36 mm cum 112.42 150.00 262.42 194.44
M-025 Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm cum 436.00 150.00 586.00 503.26
M-026 Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm cum 736.00 150.00 886.00 475.83
M-027 Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm cum 736.00 150.00 886.00 523.85
M-028 Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm cum 765.67 150.00 915.67 466.87
M-029 Coarse graded Granular sub-base Material 53 mm to 26 .5mm cum 930.50 150.00 1,080.50 436.78
M-030 Aggregates below 5.6 mm cum 274.21 150.00 424.21 194.44
M-032 Aggregates 22.4 mm to 5.6 mm cum 736.00 150.00 886.00 502.51
M-033 Aggregates 45 mm to 2.8 mm cum 602.36 150.00 752.36 448.73
M-035 Aggregates 53 mm to 2.8 mm cum 602.36 150.00 752.36 448.73
M-037 Aggregates 63 mm to 2.8 mm cum 602.36 150.00 752.36 408.18
M-038 Aggregates 63 mm to 45 mm cum 825.00 150.00 975.00 408.07
M-039 Aggregates 90 mm to 45 mm cum 825.00 150.00 975.00 378.51
M-040 Aggregates 10 mm to 5 mm cum 436.00 150.00 586.00 503.26
M-043 Aggregates 13.2 mm to 5.6 mm cum 436.00 150.00 586.00 583.40
M-044 Aggregates 13.2 mm to 10 mm cum 436.00 150.00 586.00 610.18
M-045 Aggregates 20 mm to 10 mm cum 736.00 150.00 886.00 610.18
M-046 Aggregates 25 mm to 10 mm cum 736.00 150.00 886.00 581.90
M-047 Aggregates 19 mm to 6 mm cum 736.00 150.00 886.00 502.51
M-050 Aggregates 6 mm nominal size cum 274.21 150.00 424.21 390.25
M-051 Aggregates 10 mm nominal size cum 436.00 150.00 586.00 583.4
M-052 Aggregates 13.2/12.5 mm nominal size cum 436.00 150.00 586.00 610.18
M-053 Aggregates 20 mm nominal size cum 1,036.00 150.00 1,186.00 523.85
M-054 Aggregates 25 mm nominal size cum 1,036.00 150.00 1,186.00 499.84
M-055 Aggregates 40 mm nominal size cum 825.00 150.00 975.00 420.66
Sl. No. Description Unit Final Rate Unit Rate
M-056 AC pipe 100 mm dia metre 44.28 44.28 33
M-057 Acrylic polymer bonding coat litre 131.88 131.88 input
M-058 Alluminium Paint litre 124.70 124.70 115
M-059 Aluminium alloy plate 2mm Thick sqm 9,512.21 9,512.21 7500
M-060 Aluminium alloy/galvanised steel tonne 57,033.00 57,033.00 30000
M-061 Aluminium sheeting fixed with encapsulated lens type reflective sheeting including 2% towards lettering, cost of angle iron, cost of drilling holes, nuts, bolts etc.and signs as applicable sqm 8,945.43 8,945.43 7000
M-062 Aluminium studs 100 x 100 mm fitted with lense reflectors nos 187.29 187.29 input
M-063 Barbed wire kg 73.77 73.77 51.75
M-064 Bearing (Cost of parts) nos #VALUE! #VALUE! input
M-065 Bearing (Cast steel rocker bearing assembly of 250 tonne ) nos 85,505.67 85,505.67 49500
M-066 Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel laminates by the process of vulcanisation,) nos 0.62 0.62 input
M-067 Bearing (Forged steel roller bearing of 250 tonne nos 47,480.35 47,480.35 33000
M-068 Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces against stainless steel mating together with cast steel assemblies/fabricated structural steel assemblies duly painted with all components nos 142.67 142.67 input
M-069 Bearing (PTFE sliding plate bearing assembly of 80 tonnes ) nos 12,637.56 12,637.56 input
M-070 Bearing (Supply of sliding plate bearing of 80 tonne) nos 11,414.17 11,414.17 20000
M-071 Bentonite kg 4.02 4.02 3.1
M-072 Binding wire kg 75.04 75.04 48.52
M-073 Bitumen ( Cationic Emulsion ) (M.S) tonne 52,919.00 52,919.00 31,190.90
M-076 Bitumen (Cutback ) tonne 56,414.00 56,414.00 41,271.30
M-077 Bitumen (emulsion) RS1 tonne 55,568.42 55,568.42 31,190.90
Bitumen (emulsion) SS1 tonne 56,630.42 56,630.42
M-078 Bitumen (modified graded) (CRMB - 55) tonne 53,965.00 53,965.00 44,040.30
M-080 C.I.shoes for the pile kg 47.04 47.04 46
M-081 Cement (OPC 43 Gr Patna) tonne 6,240.40 6,240.40 5,418.60
M-082 Cold twisted bars (HYSD Bars) tonne 72,351.75 72,351.75 49,450.00
M-083 Coller for joints 300 mm dia nos 56.00 56.00 0
M-084 Compressible Fibre Board(20mm thick) sqm 1,132.98 1,132.98 534
M-085 Connectors/ Staples each 8.33 8.33 input
M-086 Copper Plate(12m long x 250mmwide) kg 896.80 896.80 625.00
M-087 Corrosion resistant Structural steel tonne 46,827.05 46,827.05 39032.9
M-088 Corrugated sheet, 3 mm thick, "Thrie" beam section railing kg 49.62 49.62 39
M-089 Credit for excavated rock found suitable for use cum 77.88 23.36 101.24 90
M-090 Curing compound liter 136.22 136.22 80
M-091 Delineators from ISI certified firm as per the standard drawing given in IRC - 79 each 879.05 879.05 679.3
M-092 Earth Cost or compensation for earth taken from private land cum 2.01 33.00 35.01 16.1
M-093 Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for elastomeric slab unit conforming to clause 915.1 of IRC: 83 (part II), metre 28,508.46 28,508.46 17150
M-094 Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each 100 nos 574.58 574.58 400
M-095 Epoxy compound with accessories for preparing epoxy mortar kg 595.97 595.97 350
M-096 Epoxy mortar kg 817.29 817.29 480
M-097 Epoxy primer kg 122.02 122.02 8
M-098 Epoxy resin-hardner mix for prime coat kg 723.67 723.67 425
M-099 Flag of red color cloth 600 x 600 mm each 57.46 57.46 30.00
M-100 Flowering Plants each 9.00 9.00 20
M-101 Galvanised MS flat clamp nos 17.17 17.17 13.4
M-102 Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size. sqm 111.88 111.88 84.6
M-103 Galvanised structural steel plate 200 mm wide, 6 mm thick, 24 m long kg 57.03 57.03 39
M-105 Geo grids sqm 89.26 89.26 input
M-106 Geomembrane sqm 45.00 45.00 input
M-108 Geotextile sqm 84.55 84.55 53.75
M-109 Geotextile filter fabric sqm 84.55 84.55 53.75
M-110 GI bolt 10 mm Dia nos 17.88 17.88 10
M-111 Grouting pump with agitator hour 141.44 141.44 100
M-112 Grass (Doob) kg 4.96 4.96 2.59
M-113 Grass (Fine) kg 4.96 4.96 2.59
M-114 HDPE pipes 75mm dia metre 237.01 237.01 135
M-115 HDPE pipes 90mm dia metre 237.01 237.01 135
M-116 Hedge plants each 40.00 40.00 20
M-117 Helical pipes 600mm diameter metre #VALUE! #VALUE! input
M-118 Hot applied thermoplastic compound (Sp. Gravity - 2.10) litre 198.46 198.46 171.2
M-119 HTS strand tonne 79,629.50 79,629.50 55288
M-120 Joint Sealant Compound kg 27.24 27.24 16
M-121 Jute netting, open weave, 2.5 cm square opening for seeding and Mulching sqm 41.26 41.26 25.00
M-122 LDO for steam curing litre #VALUE! #VALUE! input
M-123 M.S. Clamps nos 43.36 43.36 28.90
M-125 M.S.shoes @ 35 Kg per pile of 15 m kg 30.00 30.00 20
M-126 Mild Steel bars tonne 58,600.00 58,600.00 49,450.00
M-127 Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm assembly comprising of edge beams, central beam,2 modules chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorised representative metre 31,417.46 31,417.46 18900
M-128 Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and upto 210mm box/box seal joint assembly containing 3 modules/cells and comprising of edge beams, two central beams, chloroprene seal, anchorage elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his authorised representative metre 31,417.46 31,417.46 input
M-129 Nipples 12mm nos 44.80 44.80 input
M-130 Nuts and bolts kg 69.15 69.15 52.3
M-132 Pavement Marking Paint litre 246.65 246.65 191.05
M-133 Paving Fabric sqm 93.58 93.58 input
M-134 Perforated geosynthetic pipe 150 mm dia metre 29.35 29.35 25.00
M-135 Perforated pipe of cement concrete, internal dia 100 mm metre 112.83 112.83 95.00
M-136 Pesticide kg 80.97 80.97 60
M-137 Pipes 200 mm dia, 2.5 m long for drainage metre 173.47 173.47 110
M-138 Plastic sheath, 1.25 mm thick for dowel bars sqm 17.75 17.75 10.00
M-139 Plastic tubes 50 cm dia, 1.2 m high nos #VALUE! #VALUE! input
M-140 Polymer braids metre #VALUE! #VALUE! input
M-141 Pre moulded Joint filler,25 mm thick for expansion joint. sqm 1,064.18 1,064.18 625.00
M-142 Pre-coated stone chips of 13.2 mm nominal size cum 494.70 150.00 644.70 610.18
M-143 Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear strength, vulcanised in a single operation for the full length of a joint to ensure water tightness. metre #VALUE! #VALUE! input
M-144 Pre-moulded asphalt filler board sqm 1,064.18 1,064.18 625
M-145 Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days kg #VALUE! #VALUE! input
M-147 Quick setting compound kg #VALUE! #VALUE! input
M-148 Random Rubble Stone cum 525.00 150.00 675.00 291.65
M-149 RCC Pipe NP 4 heavy duty non presure pipe 1000 mm dia metre 5,570.00 5,570.00 2,075
M-150 RCC Pipe NP 4 heavy duty non presure pipe 1200 mm dia metre 6,510.00 6,510.00 2,950
M-151 RCC Pipe NP 4 heavy duty non presure pipe 300 mm dia metre 532.24 532.24 380
M-152 Reflectorising glass beads kg 72.00 72.00 62
M-153 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips) metre #VALUE! #VALUE! input
M-154 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel strips) metre #VALUE! #VALUE! input
M-155 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/fibre reinforced polymer/polymeric strips) metre #VALUE! #VALUE! input
M-156 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips) metre #VALUE! #VALUE! input
M-157 Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. Aluminium strips) metre #VALUE! #VALUE! input
M-158 Rivets each 9.08 9.08 5
M-159 Sand bags (Cost of sand and Empty cement bag) nos 9.11 2.59 8.48 5.4
M-160 Sapling 2 m high 25 mm dia each 25.55 25.55 15
M-161 Scrap tyres of size 900 x 20 nos 85.14 85.14 50.00
M-163 Selected earth (Including royality @ Rs. 22.00 per cum & compensation @ Rs. 1.78 per cum) cum 2.01 33.00 35.01 16.1
M-164 Separation Membrane of impermeable plastic sheeting 125 micron thick sqm 15.24 15.24 10
M-165 Sheathing duct metre 93.66 93.66 55
M-166 Shrubs each 2.77 2.77 10
M-167 Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing cum 278.90 278.90 450
M-168 Sodium vapour lamp each 188.94 188.94 input
M-169 Square Rubble Coursed Stone cum 525.00 150.00 675.00 291.65
M-170 Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level each #VALUE! #VALUE! input
M-171 Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level each #VALUE! #VALUE! input
M-172 Steel drum 300 mm dia 1.2 m high/empty bitumen drum nos 170.47 170.47 80
M-173 Steel helmet and cushion block on top of pile head during driving. kg 41.93 41.93 35.6
M-174 Steel pipe 25 mm external dia as per IS:1239 metre 136.85 136.85 111.3
M-175 Steel pipe 50 mm external dia as per IS:1239 metre 244.89 244.89 199.2
M-176 Steel wire rope 20 mm kg 43.42 43.42 34.5
M-177 Steel wire rope 40 mm kg 43.42 43.42 34.5
M-178 Strip seal expansion join metre 8,844.47 8,844.47 5890
M-179 Structural Steel tonne 57,033.00 57,033.00 43,307.25
M-180 Super plastisizer admixture IS marked as per 9103-1999 kg 214.86 214.86 100
M-181 Synthetic Geogrids as per clause 3102.8 and approved design and specifications. sqm 187.90 187.90 input
M-182 Through and bond stone each 10.58 10.58 11
M-183 Tie rods 20mm diameter nos 67.30 67.30 input
M-184 Tiles size 300 x 300 mm and 25 mm thick each 41.07 41.07 25
M-186 Traffic cones with 150 mm reflective sleeve nos #VALUE! #VALUE! input
M-187 Tube anchorage set complete with bearing plate, permanent wedges etc nos 51.08 51.08 30
M-188 Unstaked lime tonne 3,873.95 3,873.95 3153.8
M-190 Water based cement paint litre 125.53 125.53 73.9
M-191 Welded steel wire fabric kg 51.18 51.18 33.4
M-192 Wire mesh 50mm x 50mm size of 3mm wire kg 51.66 51.66 34.5
M-193 Wooden ballies 2" Dia for bracing each 22.29 22.29 16
M-194 Wooden ballies 8" Dia and 9 m long (9 m @ Rs. 43.00/m) each 538.98 538.98 387
M-195 Wooden packing each #VALUE! #VALUE! input
M-196 Wooden staff for fastening of flag 25 mm dia, one m long each 27.86 27.86 20
Overheads for Road Works 0.12
Contractors profit for Road Works 0.10
Overheads for Bridge Works 0.20 for input of Overheads or Contractors profit please type in collum C as like below
Overheads for Bridge Works (Rehabilitation) 0.30 Type symble of apostrope(') then input value then one space then symble of percentage (%) for example '08 %
Contractors profit for Bridge Works 0.10
Lead from Mixing Plant to working site 1 km
Lead for E/W borow area to site 1 km
Lead for fly ash from source to site 1 km
Items No. Summary of Rates calculated and used for analysis of rates of other items Unit Rate
Item 8.3 Printing new letter and figures of any shade (ii) English Roman per cm height per letter 0.37 For Detail Analysis See Work Sheet "Direct Used Items"
Item 8.8 Painting Two Coats on New Concrete Surfaces sqm 62.00
Item 8.9 Painting angle iron post two coats sqm 53.00
Item 12.6 (B) Cement mortor 1:2 (Excluding OH & CP) cum 4020.00
Item 12.6 (A) Cement mortor 1:3 (Excluding OH & CP) cum 3137.00
Item 12.6 (D) Cement mortor 1:6 (Excluding OH & CP) cum 1943.00
Item 12.7 (A ) Course Rubble masonary in cement mortor 1:3 (including OH & CP) cum 2808.00
Item 12.7 (Addl) B) Random Rubble masonary in cement mortor 1:6 (including OH & CP) cum 2243.00
Item 12.8 (A) PCC Grade M15 including OH & CP for Open Foundation by Mixer cum 3855.00
Item 12.8 (A) PCC Grade M15 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 2696.00
Item 12.8 (B) PCC PCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 2920.00
Item 12.8 (C) RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 2987.00
Item 12.8 (C) RCC RCC Grade M20 including OH & CP for Open Foundation by Batching Plant cum 4267.00
Item 12.8 (C) RCC Grade M20 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 2985.00
Item 12.8 (D) PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3227.00
Item 12.8 (D) PCC Grade M25 including OH & CP for Open Foundation by Batching Plant cum 4602.00
Item 12.8 (D) PCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3227.00
Item 12.8 (E) RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3298.00
Item 12.8 (E) RCC Grade M25 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3550.00
Item 12.8 (F) PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3260.00
Item 12.8 (F) PCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3257.00
Item 12.8 (G) RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3316.00
Item 12.8 (G) RCC Grade M30 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3315.00
Item 12.8 (H) Case I RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3401.00
Item 12.8 (H) Case II RCC Grade M35 including OH & CP for Open Foundation by Batching Plant cum 5192.00
Item 12.8 (H) RCC Grade M35 excluding OH & CP for Open Foundation by Batching Plant cum 3776.00
Item 12.8 (H) RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3666.00
Item 12.11 (C) i PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3455.00
Item 12.11 (C) i PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3307.00
Item 12.11 (C) ii PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3649.00
Item 12.11 (C) ii PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3500.00
Item 12.11 (C) iii PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3682.00
Item 12.11 (C) iii PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3535.00
Item 12.11 (C) iv PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Mixer cum 3760.00
Item 12.11 (C) iv PCC Grade M35 including OH & CP for Well Foundation (Bottom Plug) by Batching Plant cum 5180.00
Item 12.11 (C) iv PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material & Mechinery by Batching Plant cum 3611.00
Item 12.11 (F) iv PCC Grade M35 including OH & CP for Well Foundation (Well Cap) by Batching Plant cum 4814.00
Item No. 3.13 Excavation for Structures (Manual Means) cum 178.00
Item No. 3.13 Excavation for Structures (Mechenical Meanse) cum 49.00
Item 14.1(A) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 4867.00
Item 14.1(B) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 5404.00
Item 14.1(E) RCC Grade M20 for super-structure including OH & CP by Batching Plant cum 6496.00
Item 14.1(C) RCC Grade M30 for super-structure including formwork and excluding OH & CP by Batching Plant cum 3979.00
Item 14.1(C) RCC Grade M30 for super-structure excluding formwork and excluding OH & CP by Batching Plant cum 3316.00
Item 14.2 A Supplying ,fitting and placing HYSD bar reinforcement in super-structure exncluding OH & CP tonne 49567.00
Item 13.6 Supplying, fitting and placing HYSD including OH & CP for sub-structure tonne 67291.00
Item 5.17 Fog Seal sqm 42.00
Item 5.21 Case-I Crack Prevention courses. Case-I Stress Absorbing Membrane (SAM) crack width less than 6 mm sqm 67.00
Item 5.21 Case-II Crack Prevention courses. Case-II Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm sqm 82.00
Item 5.21 Case-IV Crack Prevention courses. Case-III Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % sqm 109.00
Item 5.21 Case-IV Crack Prevention courses. Case-IV Bitumen Impregnated Geotextile sqm 182.00
Item 5.15 Case-I Slurry Seal Case-I 5 mm thickness sqm 70.00
Item 5.15 Case-II Slurry Seal Case-II 3 mm thickness sqm 49.00
Item 5.15 Case-III Slurry Seal Case III 1.5 mm thickness sqm 30.50
Item 5.9 Case-I Surface Dressing Case-I 19 mm nominal chipping size sqm 93.00
Item 5.9 Case-II Surface Dressing Case-II 13 mm nominal size chipping sqm 79.00
CARRIAGE OF MATERIALS WITH LOADING AND UNLOADING
FOR - Murliganj.
CARRIAGE OF MATERIALS(BY TIPPER)BASED ON R.C.D.2022
s-no DESCRIPTION SOURCE UNIT LEAD W.T QTY RATE AMOUNT
A. Loading and Unloading CUM 1.00 123.40 123.40
(i) For Katcha Track t- km 0 1.60 0.00 20.40 0.00
(ii) For Surface Road t- km 213.00 1.60 340.80 8.40 2862.72
Total Per Cum 2986.12
Total Rs Per cum(2986.12x1.15/1.21) 2838.05
2 Bitumenous/ Emulsion(Barauni)
A. Loading and Unloading M.T 1.00 518.40 518.40
(i)For Surface Road t- km 224 1.00 224.00 8.40 1881.60
Total Per M.T 2400.00
Total Rs Per M.T(2400x1.15/1.21) 2280.99
3 GSB (Seikhpura)
A. Loading and Unloading M.T 1.00 123.40 123.40
(i)For Surface Road t- km 220 1.60 352.00 8.40 2956.80
Total Per M.T 3080.20
Total Rs Per Cum (3080.20x1.15/1.21) 2927.46
Coarse Sand koilwar
A. Loading and Unloading CUM 1.00 123.40 123.40
(i) For Katcha Track t- km 1 1.60 1.60 20.40 32.64
(ii) For Surface Road t- km 72.00 1.60 115.20 8.40 967.68
Total Per Cum 1123.72
Total Rs Per cum(1123.72x1.15/1.21) 1067.99
A. Loading and Unloading CUM 1.00 518.40 518.40
(i) For Katcha Track t- km 1 1.00 0.00 20.40 0.00
(ii) For Surface Road t- km 5.00 1.00 5.00 8.40 42.00
Total Per Cum 560.40
Total Rs Per cum(560.40x1.15/1.21) 532.61
GSB WMM DBM BC Kerb chips Sand
CARRIAGE OF MATERIALS WITH LOADING AND UNLOADING
FOR- MURLIGANJ.
CARRIAGE OF MATERIALS( BY TIPPER) BASED ON R.C.D.effective from 01/01/2022
SL NO DESCRIPTION SOURCE UNIT LEAD WT. QTY RATE AMOUNT
Lead-305(P) K.M Koderma
a. Loading and Unloading By Tipper CUM 1 123.40 123.40
(i) For Katcha Track t- km 0 1.60 0 20.40 0.00
(ii)For Surface Road t-km 305 1.60 488 8.40 4099.20
(iii)For Unsurfaced Graveled Road t-km 0 1.60 0 14.10 0.00
Sub Total per cum 4222.60
Stone chips from Koderma to Murliganj Railway Station 430 Km
Stone chips 386 km (1US+6km road form Koderma querry site to Murliganj Rack Point+3 km to work site
(a) From Koderma Querry site to Koderma Rack Point by road 1US+6 KM(P)
a. Loading and Unloading cum 1 123.40 123.40
(i) For Katcha Track t- km 0 1.60 0 20.40 0.00
(ii)For Surface Road t-km 6 1.60 9.60 8.40 80.64
(iii)For Unsurfaced Graveled Road t-km 1 1.60 1.60 14.10 22.56
Sub Total per cum 226.60
(b) Loading and Unloading at Rack point
rack point cum 1 123.40 123.40
(c ) From Koderma Rack point to Murliganj Rack Point 429 KM
Railway freight
Railway freight Class 150 (426 to 450km) tonne 1.60 716.40 1146.24
Add Busy season charges(BSS)(Railway Board Rates matter circular TCR/1078/2015/14 dt.20.07.2015) 15% 1146.24 171.94
Total NTR(Normal Terrif rate) 1318.18
Add Development surcharges (Railway Board Rates matter circular TCR/1078/2015/14 dt.20.07.2015) 5% 1318.18 65.91
Add Terminal charge (UP & Down)(Railway Board Rates circular No 24 of 2018) tonne 1.60 80.00 128.00
Sub Total 1512.08
Add GST 5% on "X"(Railway Board Rates circular No 29 of 2017) 5.00% 1512.08 75.60
Over head charges 8% 1587.69 127.02
Sub Total 1714.70
(d ) FromMurliganj Rack point to work site by road 2 Km(P)
a. Loading and Unloading CUM 1 123.40 123.40
(i) For Katcha Track t- km 0 1.60 0.00 20.40 0.00
(ii)For Surface Road t-km 2.00 1.60 3.20 8.40 26.88
Sub Total per cum 150.28
Total Rs. 2214.98
Hence By Rail head < by Road
Hence By Rail head is permissible
Lead-137K.M.(1 K + 137P) Banka #REF!
a. Loading and Unloading CUM 1 123.40 123.40
(i) For Katcha Track t- km 1 1.60 1.60 20.40 32.64
(ii)For Surface Road t-km 136 1.60 217.60 8.40 1827.84
Total per cum 1983.88
Lead-211(P) K.M Seikhpura)
a. Loading and Unloading By Tipper CUM 1 123.20 123.20
(i) For Katcha Track t- km 0 1.60 0 28.20 0.00
(ii)For Surface Road t-km 211 1.60 337.6 8.40 2835.84
(iii)For Unsurfaced Graveled Road t-km 0 1.60 0 14.10 0.00
Sub Total per cum 2959.04
4 Bitumen/Emulsion
Lead-156(156P) Barauni
a. Loading and Unloading CUM 1 518.40 518.40
(i) For Katcha Track t- km 1 0.00 0.00 28.20 0.00
(ii)For Surface Road t-km 156 1.00 156.00 8.40 1310.40
Total per cum 1828.80
Lead-3 K.M.(1 K + 2 P)
a. Loading and Unloading CUM 1 0.00 0.00
(i) For Katcha Track t- km 1 1.667 1.667 0.00 0.00
(ii) For surface road t- km 2 1.667 3.333 0.00 0.00
Total per cum 0.00
Add labour cess @1% 1% 0.00 0.00
6 Sludge or Manure
Lead-(3 P) K.M beyond 5 km initial lead
a. Loading and Unloading CUM 0 0.00 0.00
(i) For Katcha Track t- km 0 1.449 0 0.00 0.00
(ii)For Surface Road t-km 3 1.449 4.347 0.00 0.00
Total per cum 0.00
Add labour cess @1% 1% 0.00 0.00
7 Steel- by Manual Means and Stacking.
Lead-(5 P) K.M.
a. Loading and Unloading mt 1 402.00 402.00
(i) For Katcha Track t- km 0 1 0 0.00 0.00
(ii)For Surface Road t-km 5 1 5 0.00 0.00
Total per mt 402.00
Add labour cess @1% 1% 474.36 4.74
8 Cement - by Manual Means and Stacking.
Lead-(5 P) K.M.
a. Loading and Unloading mt 1 402.00 402.00
(i) For Katcha Track t- km 0 1 0 0.00 0.00
(ii)For Surface Road t-km 5 1 5 0.00 0.00
Total per mt 402.00
Add labour cess @1% 1% 474.36 4.74
BIHAR INDUSTRIAL AREA DEVELOPMENT AUTHORITY
(A GOVERNMENT OF BIHAR UNDERTAKING)
FINANCIAL BID FORM
CONSTRUCTION OF ROAD, DRAIN, SAFETY & DISASTER RISK REDUCTION BUILDING(CUC) & INSTALLATION OF SOLAR STREET LIGHTS, AT INDUSTRIAL AREA-MURLIGANJ(MADHEPURA)
NAME AND ADDRESS OF THE BIDDER with e-mail id.
QUOTING SHEET FOR BIDDERS
NIT-45/BIADA/2025-26, Group-03
S.NO. BIDDER'S PRICE
NAME OF WORK ESTIMATED AMOUNT ABOVE/BELOW (+) or (-) QUOTED BY CONTRACTOR QUOTED AMOUNT
IN FIGURES IN WORDS
1 CONSTRUCTION OF ROAD, DRAIN, SAFETY & DISASTER RISK REDUCTION BUILDING(CUC) & INSTALLATION OF SOLAR STREET LIGHTS, AT INDUSTRIAL AREA-MURLIGANJ(MADHEPURA) 88,100,485.00
Total Amount in Rs. 88,100,485.00 0.00 0.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT-45.pdf
NIT • 1.96 MB
Technical BID Sheet-NIT-45-MURLIGANJ.xls
NIT • 0.07 MB
MSME BOQ-IA Murliganj 2.xlsx
NIT • 0.98 MB
Corrigendum for NIT 45.pdf
NIT • 0.21 MB
Financial Bid sheet MURLIGANJ.xlsx
NIT • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .