| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC Bid Accepted. Hence, Lowest Bidder L1 |
| 2 | L2₹2.8 Cr+₹8.4 L (3.11%)Rejected-AOC NO 1 344 KOTTAYUR VILLAGE B THURINJIPATTI POST PAPPIREDDIPATTI TALUK DHARMAPURI DISTRICT 635 301 | DHARMAPURI | TAMIL NADU | 635301 | ₹2.8 Cr+₹8.4 L (3.11%) | L2 | Rejected-AOC Bid Rejected. Hence, Highest Bidder L2. |
| Sl No | Description | Qty | Unit | M K SELVA L1 | srinivasa construction L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Bridge across Nallar river along the road from 1/4 of Avinashi – Mettupalayam road to S.Mettupalayam via Arasu Paniyalar Nagar in Avinashi Block of Tiruppur District.
Earthwork excavation in all classes of soil except hard
rock requiring blasting and depositing on bank with all
leads and lifts as per SS20B, including cost of all labour,
equipments and all incidental charges such as Bailing
our water, providing and maintaining necessary
cofferdams, sheeting, shoring bracing and their
subsequent removal, removal of all logs, stumps, grubs
and other deleterious matter and obstructions,
trimming bottom of excavation backfilling, and
clearing the site and disposal of all surplus materials
etc., complete as per relevant standard specification
for DRESSING THE BED UP TO SILL LEVEL. | 146.48 | Cum | 131 ₹19,188.88 Lowest | 135 ₹19,774.8 |
| 2.00 | Earthwork excavation in soft disintegrated rock not
requiring blasting except hard rock requiring blasting
and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all
incidental charges such as Bailing our water, providing
and maintaining necessary cofferdams, sheeting,
shoring bracing and their subsequent removal,
removal of all logs, stumps, grubs and other
deleterious matter and obstructions, trimming bottom
of excavation backfilling, and clearing the site and
disposal of all surplus materials etc., complete as per
relevant standard specification for (OPEN
FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS &
PIERS BELOW SILL LEVEL) | 1,011.21 | Cum | 608 ₹6,14,815.68 Lowest | 626 ₹6,33,017.46 |
| 3.00 | Vibrated Cement Concrete of grade M 15 grade, using
40mm,20mm &10mm ISS size HBG metal including
cost and conveyance of all materials to site including
cost of cement at site including cost of formwork, soft
water, labour charges for mixing, transporting, laying
and curing concrete, working at depths, tools and
plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per
relevant standard specifications for foundation
concrete (below footing, below raft foundation,
below retaining wall,Base course for Apron
&Approach slab) | 22.74 | Cum | 5,269 ₹1,19,817.06 Lowest | 5,432 ₹1,23,523.68 |
| 4.00 | Vibrated Cement Concrete of grade M20 Nominal Mix
using 40mm ISS size HBG graded metal including cost
and conveyance of all materials to site including cost
of cement at site including cost of formwork, soft
water, labour charges for mixing, transporting, laying
and curing concrete , working at depths , tools and
plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for FOOTINGS OF
ABUTMENTAND WINGS BELOW SILL LEVEL | 486.14 | Cum | 6,505 ₹31,62,340.7 Lowest | 6,707 ₹32,60,540.98 |
| 5.00 | Plain Cement Concrete of grade M 20 grade
using 40mm,20mm & 10 mm ISS size HBG metal
including cost and conveyance of all materials to site
including cost of cement at site including cost of
formwork, soft water, labour charges for mixing,
transporting, laying and curing concrete, working at
depths, tools and plants and maintaining of protective
bunds, cofferdams, shoring, strutting etc., complete as
per relevant standard specifications for Sub structure
of Abutment, Pier & wingwall above sill level | 173.78 | Cum | 6,898 ₹11,98,734.44 Lowest | 7,112 ₹12,35,923.36 |
| 6.00 | Vibrated reinforced Cement Concrete of grade M 30
grade using 20 & 12mm ISS size HBG metal including
cost and conveyance of all materials to site including
cost of cement at site including cost of formwork, soft
water, labour charges for mixing, transporting, laying
and curing concrete, working at depths, tools and
plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per
relevant standard specifications for Dirtwall Cum
Bedblock Over Abutments and Bed Block Over Piers | 9.87 | Cum | 10,884 ₹1,07,425.08 Lowest | 11,221 ₹1,10,751.27 |
| 7.00 | Providing and fixing seepage pipes of 100 mm dia. PVC
pipes of required lengths for abutments and wings
including cost and conveyance of all materials to work
site, cost and labour for 900 mm. Dia. Semi spherical
back fill arrangements with 100 mm. size broken
granite chips at the periphery and labour charges for
fixing, etc., to drain of the backfill IN BETWEEN THE
ABUTMENTS AND RETURNS. | 68 | Nos | 201 ₹13,668 Lowest | 207 ₹14,076 |
| 8.00 | Providing and fixing Kraft Paper for full width of
seating of deck slab and including including cost and
conveyance to work site Labour for fixing the same in
correct position and all other incidental charges etc.,
complte. | 29.74 | Sqm | 115 ₹3,420.1 Lowest | 119 ₹3,539.06 |
| 9.00 | Vibrated reinforced Cement Concrete of grade M 30
grade using 20 & 12mm ISS size HBG metal including
cost and conveyance of all materials to site including
cost of cement at site including cost of formwork, soft
water, labour charges for mixing, transporting, laying
and curing concrete, working at depths, tools and
plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per
relevant standard specifications for RCC Deckslab &
Kerb | 143.93 | Cum | 13,565 ₹19,52,410.45 Lowest | 13,986 ₹20,13,004.98 |
| 10.00 | Providing filter media behind the abutments and
wings with clean III graded material 53mm to 5.6mm
to 600mm thick and well compacted in layers with
smaller sized towards the soil and bigger size towards
the wall including cost and conveyance to work site
including all labours and other incidental charges
including hire charges for tools and plants employed
etc., for filter media as per MOST's (Roads Wing)
specifications for Roads and Bridges " Fourth Revision
Cl. 309-3-2-13 and 305 -4-4 etc., complete. | 37.39 | Cum | 1,451 ₹54,252.89 Lowest | 1,496 ₹55,935.44 |
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
19 Aug 2025, 3:00 pmClosed
The Project Director, DRDA, Tiruppur
DRDA, 3rd Floor, District Collectorate, Palladam Road, Tiruppur
Construction of Bridge across Nallar river along from Km 1/4 of Avinashi to Mettupalayam road to S.Mettupalayam via Arasu Paniyalar Nagar in Avinashi Block of Tiruppur District under STATE SPECIAL ASSISTANCE PHASE I/BRIDGE/2025-26.
2025_RDTN_587483_2
DIPR/3980/Tender/2025, Dated.30.07.2025
Open Tender
Civil Works - Bridges
Item Rate
180 days
Tiruppur-Avinashi
Please Refer Tender Documents.
7 documents required · 7 mandatory
₹0
₹2.6 L
DRDA, Tiruppur
9 Oct 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
12 Aug 2025
Amount
Construction of Bridge across Nallar river along the road from 1/4 of Avinashi – Mettupalayam road to S.Mettupalayam via Arasu Paniyalar Nagar in Avinashi Block of Tiruppur District. Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL)
Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (below footing, below raft foundation, below retaining wall,Base course for Apron &Approach slab)
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF ABUTMENTAND WINGS BELOW SILL LEVEL
Plain Cement Concrete of grade M 20 grade using 40mm,20mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Sub structure of Abutment, Pier & wingwall above sill level
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Dirtwall Cum Bedblock Over Abutments and Bed Block Over Piers
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complte.
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Deckslab & Kerb
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
Providing & fixing PVC Expansion joint in between Deck Slab over Abutment & Piers as shown in the drawing including cost & conveyance of Expansion Joint including Shalimar Pad and Joint sealant etc., complete.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500 conforming to IS:1786 2008, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade-1
Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (below footing, below raft foundation, below retaining wall,Base course for Apron &Approach slab) for BASE COURSE BELOW APPROACH SLAB.
Vibrated reinforced cement concrete M 30 Grade, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for Approach Slab
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
Vibrated reinforced Cement Concrete of grade M 30 grade using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Handrail AND POSTS OVER DECK SLAB.
Vibrated Cement Concrete M20 grade using 40mm,20mm & 12mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for parapet wall over wings
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes as per IS 16014:2012, MORTH Clause 2500, of required size, Mesh Type 10 x 12 (D=100mm with tolerance of ± 2%) Zinc Coated, Mesh Wire diameter 3.0 mm, mechanically edged / selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-Charge
Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (below footing, below raft foundation, below retaining wall,Base course for Apron &Approach slab) FOR RIGID APRONS.
Construction of Approach Road, Diversion Road Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using the carted earth with a lead of 2km for formation of Approach Road. For 98% Compaction
For 100% Compaction
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Construction of granular sub-base by providin close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
BITUMINOUS MACADAM Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respect
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification
ROAD MARKING WITH HOT APPLIED THERMOPLASTIC COMPOUND WITH REFLECTORISING GLASS BEADS ON BITUMINOUS SURFACE Providing and Laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass breads as per IRC 35. The Finished surface to be level, uniform and free from streaks and holes etc complete as per MORTH specification No :803
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC- 67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67-2010 Specification (as per MORT & Spec. No. 801) 60 Cm Equilateral triangle (Cautionary) sign Board
Providing and Fixing reflective road studs of category A raised pavement markers made out of Poly carbonate / methyl methercrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromically values conforming to ASTM D428. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH. 33023/10*97- DO .III dt 11.06.97.The height, width and length shall not be less than 15 mm , 90 mm and 100 mm and with minimum re4flective area of 13 sq.cm on each side and the slope to the base shall be 35+/-5 degree . Each reflector shall have a CIL not less than values specified in Table 2 of sais MORTH circular . The strength of detachment of the integrated cylindrical shanks, ( of diameter not less than 19+/-2 mm and height not less than 30+/-2 mm) from the body is to be a minimum value of 500Kgf . Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommandation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORTH specification 804 etc complete
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106.
Dismantling of Existing Structures and Construction of PCC Retaining Wall at CH 85 - 180 m (Both Sides) and CH 220-240m (Both Sides) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS.
Vibrated Cement Concrete of grade M 15 grade, using 40mm,20mm &10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for foundation concrete (below footing, below raft foundation, below retaining wall,Base course for Apron & Approach slab)
Vibrated Plain Cement Concrete of grade M 20 grade, using 40mm,20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT and Returns AND PIERS (FOOTING)
Vibrated Plain Cement Concrete of grade M 20 grade, using 40mm,20mm & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for stem of retaining wall concrete
Providing and fixing of typical informatory sign board/ CIB with Logo as per detailed specifications and drawing communicated by the Direcorate of Rural Development and Panchayat Raj
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
srinivasa construction (BID ID -1432652)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .