Loading…
Loading…
Tender Value
₹80.9 L
EMD Value
₹1.6 L
Closing Date
31 Jul 2026, 3:00 pm5d left
EE,ELD-4,DDA
EE,ELD-4,DDA
Annual Comprehensive Maintenance of lifts installed at Pocket-1B at Sector A-1 to A-4 Narela.
2026_DDA_918882_1
34/EE/ELD-4/DDA/2026-27
Open Tender
Electrical Works
Works
365 days
NARELA
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹1.6 L
27/07/2026 at 11.00 A.M. in the chamber of SE(E)/
24 Jul 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
31 Jul 2026
28 Jul 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Annual comprehensive maintenance of 26Nos. (13-Passengers), Schindler make lifts with 16 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. | - | Per Month | 3,24,748 | - |
| 2 | Annual comprehensive maintenance of 15 Nos. (16-Passengers), Schindler make lifts with 16 landing/opening with ARD at rated speed of 1.75 mtr./ second which includes routine, preventive and break down maintenance including repair / replacement of all worn out items, accessories and control equipments, defective parts with minimum down time as per inventory, terms & conditions enclosed etc. complete as required. | - | Per Month | 1,87,355 | - |
| 3 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993828:-
(1) Freight/Transport fee-1set.
(2) SDIC53.Q anti-sulphur resistor-1set
(3) Module VVVF5+drive T2L/C2 EU/NA-1set
(4) Set motor VVF-1set.
(5) Cross Flow Fan/ULF2-1042CS III-2sets.
(6)LOP cable 1.5mm2,L=3600mm-5 sets
(7)KTC/KTS switch forT2 &C2=217724-8 sets.
(8)Kit LSC154 DO V15/FECT2L/T2R-1 set. | - | Job | 2,76,904 | - |
| 4 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993840:-
(1) Freight/Transport fee-1set.
(2) SDIC53.Q anti-sulphur resistor-1set
(3) Module VVVF5+drive T2L/C2 EU/NA-1set
(4) Set motor VVF-1set. (5)LOP cable 1.5mm2,L=3600mm-3 sets
(7)KTC/KTS switch forT2 &C2=217724-10 sets. | - | Job | 2,32,929 | - |
| 5 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993985:-
(1) Freight/Transport fee-1set.
(2) Module VVVF5+drive T2L/C2 EU/NA-1set
(3) Set motor VVF-1set.
(4)Kit LSC154 DO V15/FECT2L/T2R-1 set.
(5) Load Measuring sensorKL-66-1set.
(6)KTC/KTS switch forT2 &C2=217724-10 sets
(7) KTS 2nd Switch forC2 Landing door-10 sets
(8)Batt_VRLA_12V_12_AH_HD_F2-40C_2K-2 set. (9)Cross Flow Fan/ULF2-1042CS III-1sets.
(10)Landing door panel-1set.
(11) COP-1set
(12) BLOPILG 1.Q(S) -10 sets | - | Job | 4,49,464 | - |
| 6 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993962:-
(1)Freight/Transport fee-1set.
(2)SDIC53.Q anti-sulphur resistor-1set
(3)PCBA CANP 211.Q-1 set
(4))Kit LSC154 DO V15/FECT2L/T2R-1 set.
(5)Module VVVF5+drive T2L/C2 EU/NA-1set
(6) Load Measuring sensorKL-66-1set.
(7)KTC/KTS switch forT2 &C2=217724-10 sets.
(8) KTS 2nd Switch forC2 Landing door -10 set
(9)Batt_VRLA_12V_12_AH_HD_F2-40C_2K-2 set.
(10)Cross Flow Fan/ULF2-1042CS III-2sets.
(11)Landing door panel-1set | - | Job | 3,92,950 | - |
| 7 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993924:-
(1)Freight/Transport fee-1set.
(2)Set motor VVF-1set.
(3)Module VVVF5+drive T2L/C2 EU/NA-1set
(4)SDIC53.Q anti-sulphur resistor-1set
(5)PCBA CANP 211.Q-1 set
(6)Kit LSC154 DO V15/FECT2L/T2R-1 set.
(7)Pit Stop switch assembly-2 set
(8) Load Measuring sensorKL-66-1set.
(9)pulley cpl. for MM TD 20x&TW 201-1 set
(10)Limit SwitchBistabil IP65 w.Tread M20-1 set
(11)Batt_VRLA_12V_12_AH_HD_F2-40C_2K-2 set.
(12)KTC/KTS switch forT2 &C2=217724-10 sets
(13)KTS 2nd Switch forC2 Landing door -10 set
(14)Cross Flow Fan/ULF2-1042CS III-2sets.
(15) COP panel-1set | - | Job | 4,68,727 | - |
| 8 | Supplying and replacement of following damaged & non-working parts of lifts for equipment No.10993939 & Lift equipment no 10993939:-
(1)Freight/Transport fee-2set.
(2)PCBA CANP 211.Q=57618362-2 set
(3)BLOPILG 1.Q(S)-20 sets | - | Job | 1,24,021 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_965642.xls
BOQ • 0.29 MB
NIT34.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].