Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 83 84 SHED NO A1 7 GIDC UMBERGAON GIDC UMBERGAON UMBERGAON VALSAD GUJARAT 396171 | VALSAD | GUJARAT | 396171 | Admitted-Finance |
| 3 | Admitted-Finance 8 1 B PAHARPUR HOUSE DIAMOND HARBOUR ROAD ALIPORE KOLKATA WEST BENGAL 700027 | KOLKATA | WEST BENGAL | 700027 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
Refer Docs
EMD Value
₹50 L
Closing Date
12 May 2025, 12:00 pmClosed
Mr. L. Thavurya, GM (SCM)
EIL GURUGRAM
COOLING TOWER PACKAGE FOR POLYPROPYLENE PROJECT-KOCHI REFINERY OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2025_EIL_850815_1
SS/B895-PPC-PB-T-8010/1008
Open Tender
Miscellaneous Works
480 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹50 L
Yes
AS PER TENDER DOCUMENT
4 Jul 2025
25 Feb 2025
13 May 2025
25 Feb 2025
12 May 2025
30 Apr 2025
25 Feb 2025 - 6 Mar 2025
7 Mar 2025
Amount
COOLING TOWER PACKAGE ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Cooling Towers PPC-CT having 2 working cells and 1 Stand-by cell with each cell capacity 4000 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Chlorine dioxide and Chemical dosing system for cooling water treatment, Third party Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, Erection and Installation of Tower, Mechanical equipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor's scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning, including monitoring, running and maintenance of Chemical dosing system for six months of operation after commissioning, Supply of chemicals and consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days, performance guarantee test run and six months consumption of plant operation after completion of 30 days of trial run post commissioning, and fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning and assistance services during plant operation of the plant for a period of 6(six) months from the date of commissioning.
Total Lumpsum Price (SP-0)
Description of Work / Item(s)
Amount
Lumpsum price for Design and Detailed Engineering of Cooling Tower Package as per DESCRIPTION PROVIDED IN DETAILED SCHEDULE OF PRICES (Form SP-4) & as per Bidding Document.
SP-1= Design and Detailed Engg. prices included in SP-0 Prices
Description of Work / Item(s)
Amount
Lumpsum Price for supply portion for completion of scope of work as per bidding document which includes following but not limited to: Supply of all materials including - procurement , shop fabrication, inspection, expediting, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including Third Party Inspection (TPI) Charges, ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, inland transportation, stevedoring, handling at worksite etc. required for completing and establishing a fully functional Cooling Tower Package as per Bidding Document requirements.
SP-2= Supply Prices included in SP-0 Prices Note: Bidder to include the prices for Built-In Imported content billed to and shipped to in the name of Contractor and/or Owner in INR only. However for Basic Custom Duty and Custom related duties for which Bill of Entry shall be filed in the name of Owner, shall not be included in Supply price.
Description of Work / Item(s)
Amount
Lumpsum Price For Construction/Installation Portion as per requirements detailed out in various sections of Bidding Document: Construction, Fabrication, Erection / Installation, all Testing / Inspection including Inspection at site (as specified in Tender),all works upto and including civil works, commissioning and any other field activity required for completing and establishing a fully functional & operative ASRS Package; any balance field engineering; providing construction / installation aids and all safety devices for construction, site supervision for erection & certification for correct installation of all items/accessoriesby OEMs, if any and completing all works as per the Bidding Document and direction of Engineer-in-Charge. Construction including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, modularisation & erection, installation, testing, Inspection, Training, pre-commissioning / commissioning, Guarantees & PGTR, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document.
SP-3= Construction/Installation price included in SP-0 prices
Description of Work / Item(s)
Amount
COOLING TOWER PACKAGE ON LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: FORM-SP-9
GUARANTEED POWER CONSUMPTION FOR COOLING TOWER FANS PER CELL FOR CT (2+1 CELLS) AND FOR EQUIPMENT IDENTIFIED IN LOADING CRITERIA CHAPTER OF TENDER
Paharpur Cooling Towers Limited (BID ID -3209621)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -3210208)
AS Cooling Technologies India Private Limited (BID ID -3209045)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -3210208)
Paharpur Cooling Towers Limited (BID ID -3209621)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -3210208)
Paharpur Cooling Towers Limited (BID ID -3209621)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -3210208)
HAMON COOLING SYSTEMS PRIVATE LIMITED (BID ID -3210208)
AS Cooling Technologies India Private Limited (BID ID -3209045)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid