Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.8 L+₹6,879.20 (0.28%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jal Dhara Engineers India L1 | MK ENGG.CO. L2 |
|---|---|---|---|---|---|
| 1.01 | Arrangement of safety equipment’s for the protection of staff to execute the work at deep channel and closing the sewage water incoming and outgoing gate for safely execution of dismantling work. | 2 | job | 39,600 ₹46,728 Lowest | 41,000 ₹48,380 |
| 1.02 | Cleaning of complete bar screen by removing of sewage grit, dust with the help of water pressure, chemical processing, emery paper, wire brush and other scrubbing tools for making the complete cleaning for repairing purpose as per job requirement. | 2 | job | 1,29,000 ₹1,52,220 | 1,26,400 ₹1,49,152 Lowest |
| 1.03 | Dismantling / Removal of repairable parts like comb assembly one by one (3 nos), chain, shaft, sprocket, chain guide, wiper plate, bracket and other parts from the bar screen after opening/cutting of all nut bolts, support with the help of SS cutting machine gas cutter, welding machine and re-fastening other fastener and removing of platform by required tools & tackles and handling equipment’s as per site requirement. | 2 | job | 98,400 ₹1,16,112 Lowest | 1,04,800 ₹1,23,664 |
| 1.04 | Strengthening of bar and maintain the gap as per standard of bar screen by fixing of every bar in exact groove with proper level and making alignment of all bar in equal sequence for easily and smooth working of all teeth of comb entering in the bar without any disturbance by using of SS welding process, SS cutting machine and fixing of SS nut bolts after making the hole with threads by using of drill machine and thread tools. The job includes making of straight position of all bend shape bar by using of required tools & tackles as per site requirement. | 2 | job | 5,57,000 ₹6,57,260 Lowest | 5,60,000 ₹6,60,800 |
| 1.05 | Repairing of SS comb of bar screen by making straight position of bend shape of comb and teeth at workshop by using of hydraulic power press machine and maintain the gap of teeth as per gap of bar for making the combination of comb teeth with bar for smooth working by using of required tools & tackles as per site requirement. | 4 | jobs | 1,10,400 ₹1,30,272 | 1,00,000 ₹1,18,000 Lowest |
| 1.06 | Repairing of gear box of bar screen by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 2 | job | 58,600 ₹69,148 | 52,000 ₹61,360 Lowest |
| 1.07 | Repairing of gear box of conveyor belt by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | job | 24,950 ₹29,441 | 22,500 ₹26,550 Lowest |
| 1.08 | Repairing of SS shaft of wiper assembly by making sheet on both side with the help of lath machine and making straight position the job i/c making alignment of wiper assembly with shaft for smooth working as per job requirement. | 2 | job | 57,200 ₹67,496 Lowest | 65,000 ₹76,700 |
| 1.09 | LH & RH Bottom Side Chain Guide arrangement. | 2 | Set | 1,42,400 ₹1,68,032 Lowest | 1,43,200 ₹1,68,976 |
| 1.10 | Nylon Brush for Scrapper | 2 | Set | 29,000 ₹34,220 Lowest | 29,400 ₹34,692 |
Tender Value
Refer Docs
EMD Value
₹49,600
Closing Date
5 Oct 2026, 3:15 pmClosed
EE SDW XII
SECTOR 25 ROHINI STP
Repairing of Johnson make coarse bar screen no. 1 and 2 installed at Rohini Sector-35 SPS
2026_DJB_299178_2
NIT NO. 10(2026-27)
Open Tender
Miscellaneous Works
Item Rate
SECTOR 25 ROHINI STP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹49,600
7 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Arrangement of safety equipment’s for the protection of staff to execute the work at deep channel and closing the sewage water incoming and outgoing gate for safely execution of dismantling work. | 2 | job | - | - |
| 1.02 | Cleaning of complete bar screen by removing of sewage grit, dust with the help of water pressure, chemical processing, emery paper, wire brush and other scrubbing tools for making the complete cleaning for repairing purpose as per job requirement. | 2 | job | - | - |
| 1.03 | Dismantling / Removal of repairable parts like comb assembly one by one (3 nos), chain, shaft, sprocket, chain guide, wiper plate, bracket and other parts from the bar screen after opening/cutting of all nut bolts, support with the help of SS cutting machine gas cutter, welding machine and re-fastening other fastener and removing of platform by required tools & tackles and handling equipment’s as per site requirement. | 2 | job | - | - |
| 1.04 | Strengthening of bar and maintain the gap as per standard of bar screen by fixing of every bar in exact groove with proper level and making alignment of all bar in equal sequence for easily and smooth working of all teeth of comb entering in the bar without any disturbance by using of SS welding process, SS cutting machine and fixing of SS nut bolts after making the hole with threads by using of drill machine and thread tools. The job includes making of straight position of all bend shape bar by using of required tools & tackles as per site requirement. | 2 | job | - | - |
| 1.05 | Repairing of SS comb of bar screen by making straight position of bend shape of comb and teeth at workshop by using of hydraulic power press machine and maintain the gap of teeth as per gap of bar for making the combination of comb teeth with bar for smooth working by using of required tools & tackles as per site requirement. | 4 | jobs | - | - |
| 1.06 | Repairing of gear box of bar screen by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 2 | job | - | - |
| 1.07 | Repairing of gear box of conveyor belt by repairing of mechanical parts worm gear, worm shaft, making bearing seat in housing and at the shaft on both side, replacement of oil seal, bearing 2 nos. includes the machining charge and lubrication. | 1 | job | - | - |
| 1.08 | Repairing of SS shaft of wiper assembly by making sheet on both side with the help of lath machine and making straight position the job i/c making alignment of wiper assembly with shaft for smooth working as per job requirement. | 2 | job | - | - |
| 1.09 | LH & RH Bottom Side Chain Guide arrangement. | 2 | Set | - | - |
| 1.1 | Nylon Brush for Scrapper | 2 | Set | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_399258.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .