Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | L1 | Accepted-Finance L1 |
Tender Value
₹2.2 L
EMD Value
₹2,200
Closing Date
6 Oct 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER /ELECTRICAL SYSTEMS /MTPS1
Superintending Engineer Electrical System Mettur Thermal Power Station I Mettur Dam-636406
MTPSI ES Circle EM II Division SDI Rewiring of the existing aged worn out wirings failed damaged 230 volts single phase plug point boxes at boiler platforms 0 Mtr to 54 Mtr. Areas of UnitI.
2020_EB_180710_1
SE/ES/MTPS1/EMII/OT.42/2020-21
Open Tender
Electrical and Maintenance Works
Works
75 days
MTPS1 METTUR DAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,200
Yes
13 Oct 2020
21 Sept 2020
7 Oct 2020
21 Sept 2020
6 Oct 2020
21 Sept 2020
21 Sept 2020 - 6 Oct 2020
Amount
Fixing the new 12 way vertical 3 phase distribution board (Vermin proof, Contains MCCB, Isolators, Bus bars & Earth connectors) at the 31.2 Mtr Boiler platform of Unit 1 with earth connection and with hoods on top for the protection of the distribution board.
Fixing the new 8 / 4 way horizontal 3 phase distribution board (Vermin proof, Contains ELCB, MCB’s with internal connections) with adaptor box at the 52 Mtr.,41 Mtr, 37 Mtr, 34 Mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & in 0 Mtr Boiler platforms of Unit 1 with earth connection and with hoods on top for the protection of the distribution board.
a. Laying of 3 runs of new 2C x 25 Sq. mm Aluminum Armoured LT power cable from the newly provided junction box at 31.2 Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new floor level distribution boards at 52 Mtr.,41 Mtr, 37 Mtr, 34 mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & 0 Mtr. of unit 1. 0 Mtr. to 15 Mtr.
b. Laying of 3 runs of new 2C x 25 Sq. mm Aluminum Armoured LT power cable from the newly provided junction box at 31.2 Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new floor level distribution boards at 52 Mtr.,41 Mtr, 37 Mtr, 34 mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & ‘0’ Mtr. of unit 1. Above 15 Mtrs.& up to 30mts
c. c. Laying of 3 runs of new 2C x 25 Sq. mm Aluminum Armoured LT power cable from the newly provided junction box at 31.2 Mtr. boiler platform by fixing of clamps at 1 Mtr. intravel to the new floor level distribution boards at 52 Mtr.,41 Mtr, 37 Mtr, 34 mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & 0 Mtr ‘0’ Mtr. of unit 1. Above 30mts
Providing Glanding and termination of the following cable to the junction box. 2C x 25 Sq. mm Aluminum Armoured LT UG cable.
Providing Glanding and termination of the following cable to the junction box 4C x 30-70 Sq. mm Aluminum Armoured LT UG cable.
Disconnecting / removing the defective/ damaged conduit pipes, 230 volts red & black wires, bends, connectors, etc.. from the existing wiring circuit (lighting supply) fed off by the LDB 30 & LDB-26.
Laying / connecting / clamping the new conduit pipes, wires, bends, connectors, junction boxes, with continuous earth wire connection etc. as per requirement in the existing wiring circuit.
Replacing the defective worn-out 230 volts single phases plug point boxes, defective sockets, ON / OFF switches, metal covers with new spares at the 52 Mtr., 41 Mtr, 37 Mtr, 34 mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & in 0 Mtr Boiler platforms of Unit 1. with earth connection and with hoods on top for the protection of the single phases plug point boxes
Fixing the support angle by welding at 1 metre interval on the existing column to lay 3 runs of new 2C x 25 Sq. mm Aluminum Armoured LT power cable from the newly provided junction box at 31.2 Mtr. boiler platform to the new floor level distribution boards at 52 Mtr.,41 Mtr, 37 Mtr, 34 mtr, 31.2 Mtr, 27.7 Mtr, 24.9 Mtr, 21.6 Mtr, 18 mtr,16 mtr,7.6 Mtr & 0 Mtr ‘0’ Mtr. of unit 1 by fixing of clamps at 1 Mtr. intravel.
Consumables (Insulation tape, screws, Binding materials, rust lick, Red oxide , Enamel paint, cotton waste etc.,) LS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .