Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VILLAGE POST PANCHKURA MAHAN HAMIRPUR | HAMIRPUR | HAMIRPUR | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
10 Apr 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC CHITRAKOOT
DWARIKAPURI PURANI BAZAR KARWI CHITRAKOOT
work of Full deposit Scheme under EDSD Mau
2023_DVVNL_793880_1
45/SE/EDCCKT/2022-23
Open Tender
Electrical Works
Piece-work
365 days
KARWI CHITRAKOOT
work of Full deposit Scheme under EDSD Mau
2 documents required · 2 mandatory
₹1,180
www.dvvnl.org
₹10,000
16 Apr 2023
5 Apr 2023
11 Apr 2023
5 Apr 2023
10 Apr 2023
5 Apr 2023
Amount
Cartage of Pole & material from store centre from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
9/11 mtr. STP
8.5 mtr. PCC Pole
11 KV 3x185/3x120/3x70 sq.mm XLPE cable
11 KV outdoor jointing kit for 3x185/3x120/3x70 sq.mm XLPE cable
11 KV Cross arm *V* type
Holding Clamp/F-Clamp
11 KV Disc Insulator
Pin Insulator with Pin
T-off Channel
Top Channel
Dropper Channel
Stay set complete
Earthing rod with fitting
ACSR weasel conductor
25/63 Transformer
Barbed wire
G.I. wire for Guarding
ABC 3x50/3x95/3x120 mm.
Erection of Single support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Single support 9/11 ST Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double Pole support 8.5M PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support PCC Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support 9/11 ST Poles as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection & Grouting of Stay set as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Earthing rod as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of T-off Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Top Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Dropper Channel as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Holding Clamp/F-Clamp as per RESPO manual and as per direction of Engineer In charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Installation of 25/63 kv Transformers
Laying & Sagging and Binding ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
Laying, Sagging and Binding ABC 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
Digging hard and Rocky pits for Pole and Stay as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying of 11 kv XLPE cable 3x185/3x120/3x70 sq.mm XLPE cable as per ISS 1255/1983 of amendment there if by trench less Technology method by deep drilling system. The jop includes the cost of excavation of Earth, laying of cable inside it. The work is to be carried out as per Govt. approved Drg..
Hosting of 11 kv cable on existing/erected support with provision of MS pipe 150mm dia 3 Mtr. Long suitable of 3x185/3x120/3x70 sq.mm cable fixing of proper support and its clamping, jumpering properly as per RESSPO Norms.(All material will be supplied by the contractor)
Installation of Heat Shrinkable type cable jointing kit O/D end Termination suitable for 11 kv XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version thereof if any. (Jointing kit supplied by Dept.)
Fabrication of Hardware materials
11 KV Fuse Set Installation
Guarding of Road crossing & Line
Tree chopping
MAA ELECTRICAL ENERGY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .