Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.8 L+₹875.22 (0.09%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S.Saravanan L2 | M.Venkatesan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete (PWD SOR 2024-25 P29 | 34 | 1M3 | 155 ₹4,185 | 154 ₹4,158 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard | 52 | 1M3 | 5,345 ₹2,56,560 | 5,340 ₹2,56,320 Lowest |
| 3.00 | Providing form work for centring shuttring for all PCC or RCC side walls etc., usig mild steel angles frames and shutters with casurina props for strutting cost is including cost of materials and labour charges etc., complete as directed by the departmental officers for drain | 90 | 1M2 | 462 ₹31,416 | 460 ₹31,280 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 12 | 1M3 | 6,715 ₹60,435 | 6,713 ₹60,417 Lowest |
| 5.00 | Plastering with cement mortar 1:4 mix20 mm thick including cost and conveyance of all materials at site and including cost of cement and all labour charges etc. complete and complying as per standard specification | 23 | 1M2 | 561 ₹12,903 | 558 ₹12,834 Lowest |
| 6.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 68 | 1M2 | 7,360 ₹4,56,320 | 7,356 ₹4,56,072 Lowest |
| 7.00 | Provision for Goods and Service Tax @ 18% | 1 | 1No | 1 ₹1,47,927.42 | 1 ₹1,47,794.58 Lowest |
| 8.00 | Provision for Labour Welfare Fund @ 1% | 1 | 1No | 1 ₹8,218.19 | 1 ₹8,210.81 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
20 Aug 2025, 3:00 pmClosed
Commissioner , Ambur Municipality
Commissioner , Ambur Municipality
CONSTRUCTION OF STORM WATER DRAIN AND PROVIDING CC PAVEMENT AT PAVADI THOPPU 4TH STREET IN WARD NO 27 IN AMBUR MUNICIPALITY.
2025_MAWS_593477_1
E1/390/2025
Open Tender
Civil Works
Works
180 days
Ambur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
Yes
7 Nov 2025
15 Aug 2025
20 Aug 2025
15 Aug 2025
20 Aug 2025
15 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .