Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | ₹12.9 L Quoted ₹12.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.0 LRejected-AOC C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹16.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ANBU ENGINEERING INDIA PRIVATE LIMITED L2 | veeramuthu enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | MS Plate 8 mm thick, Including Loading, transportation &Unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works) | 4 | MT | 1,08,370 ₹4.3 L | 86,720 ₹3.5 L |
| 2.00 | Metallic joint size; 3102 x 4054 x 272mm, style #02, FS for FG duct L & R. | 2 | Nos | 1,03,880 ₹2.1 L | 83,872 ₹1.7 L |
| 3.00 | Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from APH outlet to before Mechanical hopper area. | 100 | M2 | 240 ₹24,000 | 222 ₹22,200 |
| 4.00 | Charges for transporting of 6 mm M.S./ Checkered plates from central store to boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates above 1.5 meter level and welding the same, APH outlet to before Mechanical hopper area. | 84 | M2 | 4,100 ₹3.4 L | 3,459 ₹2.9 L |
| 5.10 | Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.Metallic joint size; 3102 x 4054 x 272mm, style #02, FS for FG duct L & R-2Nos; (7.156 x 2 side) = 14.31 x 2 Nos = 28.62M. Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding. | 28.62 | M | 8,010 ₹2.3 L | 1,812 ₹51,859.44 |
| 5.20 | Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's. | 28.62 | M | 8,010 ₹2.3 L | 5,432 ₹1.6 L |
| 6.00 | Charges for welding eroded initial welding joints in the flue gas duct at APH outlet to before Mechanical hopper area. | 150 | Mtrs | 335 ₹50,250 | 298 ₹44,700 |
| 7.00 | Cleaning the accumulated the ash in side of the flue gas ducts by 9 opening the man hole doors and cleaning the ducts, collecting the accumulated ash in the Gunny bags, bringing to "O" meter at A pass side from APH outlet to before Mechanical hopper area. | 1 | No | 61,450 ₹61,450 | 99,761 ₹99,761 |
| 8.00 | Charges for removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding. | 50 | M | 380 ₹19,000 | 359 ₹17,950 |
Tender Value
Refer Docs
EMD Value
₹14,300
Closing Date
12 Jan 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Flue Gas duct A Pass Rectification of flue gas duct portions from APH outlet to before Mechanical hopper area during Annual Overhaul for the year 2025 26
2026_EB_640746_1
CE SE MI NCTPS I 288 25 26
Open Tender
Power/Energy Projects/Products
21 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,300
Yes
6 May 2026
8 Jan 2026
13 Jan 2026
8 Jan 2026
12 Jan 2026
8 Jan 2026
MS Plate 8 mm thick, Including Loading, transportation &Unloading. Manufacture test certificate shall be furnished. (Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges. The material will be supplied by TNPGCL if available at stores during execution of works)
Metallic joint size; 3102 x 4054 x 272mm, style #02, FS for FG duct L & R.
Providing scaffolding arrangement for renewal/ rectification works in flue gas duct portions from APH outlet to before Mechanical hopper area.
Charges for transporting of 6 mm M.S./ Checkered plates from central store to boiler area, cutting into required size, leading, lifting, positioning on the eroded top portions of the duct wall after removal of wornout plates above 1.5 meter level and welding the same, APH outlet to before Mechanical hopper area.
Renewal of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; Fabrication of protection plate, fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.Metallic joint size; 3102 x 4054 x 272mm, style #02, FS for FG duct L & R-2Nos; (7.156 x 2 side) = 14.31 x 2 Nos = 28.62M. Removal of existing eroded cover plates and refixing / renewal of new cover plates. Work involves expansion joint inspection and fabrication of protection plate, cleaning welding.
Renewal / Reconditioning of metallic expansion joints. Work involves arresting the upstream and down stream of duct, cutting and removal of existing eroded cover plate and metallic expansion joints; Leading, lifting, positioning of new expansion joints, aligning with the duct channel and complete welding; fixing inside the Expansion joints and full welding at gas flow side. Including cost of consumables and T&P's.
Charges for welding eroded initial welding joints in the flue gas duct at APH outlet to before Mechanical hopper area.
Cleaning the accumulated the ash in side of the flue gas ducts by 9 opening the man hole doors and cleaning the ducts, collecting the accumulated ash in the Gunny bags, bringing to "O" meter at A pass side from APH outlet to before Mechanical hopper area.
Charges for removing the existing eroded duct supports, supports for FG duct area and transporting of new pipes/Angles from Central Stores / NCTPS, cutting into required size leading, lifting, positioning and welding.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_767339.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid