Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | L1 | Accepted-AOC Comm | |
| 2 | L2Rejected-AOC 156 INDIRA COMMERCIAL COMPLEX TRANSPORT NAGAR KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | L2 | Rejected-AOC Comm | |
| 3 | Rejected-Technical LAKSHMANPUR SMALL INDUSTRIAL ESTATE VILL LAKSHMANPUR POST LAKSHMANPUR P S DOMJUR DIST HOWRAH | - | Rejected-Technical due to non fulfilment of PQR 5(b and d) |
| Sl No | Description | Qty | Unit | SEI Engineering Works Pvt. Ltd. L2 | BLACK DIAMOND EQUIPMENTS PVT. LTD. L1 |
|---|---|---|---|---|---|
| 1.00For CHP PH-I | |||||
| 1.01 | Frame for Carrying Idler (350)
As per drawing no. 01 | 50 | Nos. | 3,354 ₹3,957.72 Lowest | 3,650 ₹4,307 |
| 1.02 | Frame for Carrying Idler (200)
As per drawing no. 02 | 50 | Nos. | 3,250 ₹3,835 Lowest | 3,650 ₹4,307 |
| 1.03 | Frame for 3-Equal Roll Impact Idler (350)
As per drawing no. 03 | 15 | Nos. | 7,280 ₹8,590.4 | 6,100 ₹7,198 Lowest |
| 1.04 | Frame for 3-Equal Roll Impact Idler (200)
As per drawing no. 04 | 30 | Nos. | 6,890 ₹8,130.2 | 6,100 ₹7,198 Lowest |
| 1.05 | Frame for 3-Equal Roll Impact Transition (100)
As per drawing no. 05 | 3 | Nos. | 13,520 ₹15,953.6 | 4,900 ₹5,782 Lowest |
| 1.06 | Frame for Machine Troughing Idler
As per drawing no. 06 | 3 | Nos. | 6,630 ₹7,823.4 | 4,250 ₹5,015 Lowest |
| 1.07 | Frame for Weighing Scale Idler
As per drawing no. 07 | 3 | Nos. | 15,080 ₹17,794.4 | 4,250 ₹5,015 Lowest |
| 1.08 | Frame for Non-Magnetic Idler
As per drawing no. 08 | 3 | Nos. | 6,708 ₹7,915.44 | 3,650 ₹4,307 Lowest |
| 1.09 | Frame for 3-Equal Roll Troughing Traning Idler (350)
As per drawing no. 09 | 50 | Nos. | 3,354 ₹3,957.72 Lowest | 7,500 ₹8,850 |
Tender Value
₹60.3 L
EMD Value
₹1.2 L
Closing Date
19 Jul 2022, 3:30 pmClosed
A S Rathore
Addl.CE(P AND W), SSTPP, MPPGCL, Dongalia
Procurement of various types Conveyor Roller Frames installed at CHP Phase I and II,SSTPP,MPPGCL Dongalia,Distt.khandwa (M.P.)
2022_MPPGC_199778_1
PT-1907
Open Tender
Miscellaneous Goods
Item Wise
60 days
Addl.CE(P AND W), SSTPP, MPPGCL, Dongalia
Please refer Tender documents.
14 documents required · 14 mandatory
₹2,000
Yes
₹1.2 L
Yes
8 Oct 2025
30 May 2022
22 Jul 2022
30 May 2022
19 Jul 2022
30 May 2022
For CHP PH-I
Frame for Carrying Idler (350) As per drawing no. 01
Frame for Carrying Idler (200) As per drawing no. 02
Frame for 3-Equal Roll Impact Idler (350) As per drawing no. 03
Frame for 3-Equal Roll Impact Idler (200) As per drawing no. 04
Frame for 3-Equal Roll Impact Transition (100) As per drawing no. 05
Frame for Machine Troughing Idler As per drawing no. 06
Frame for Weighing Scale Idler As per drawing no. 07
Frame for Non-Magnetic Idler As per drawing no. 08
Frame for 3-Equal Roll Troughing Traning Idler (350) As per drawing no. 09
Frame for 3-Equal Roll Troughing Traning Idler (200) As per drawing no. 10
Frame for Single Roll Return Traning Idler As per drawing no. 12
Frame for Single Roll Self Cleaning Return Idler As per drawing no. 14
Frame for 3-Roll Troughing Transition Idler As per drawing no. 15
Frame for Single Roll Base Mounted Return Idler As per drawing no. 16
Frame for Staggered Carrying Idler As per drawing no. 17
Frame for Deflector Idler As per drawing no. 18
Frame for Carrying Idler (00) As per drawing no.19
Frame for 2-Roll Return Idler As per drawing no. 20
For CHP PH-II
Frame for 3-Equal roll Troughing Idlers (35°)
Frame for 3-Equal roll Troughing Idlers (20°)
Frame for 3 roll Adjustable Transition Idlers (5°-30°)
Frame for 3 roll Adjustable Transition Idlers (5°-20°)
Frame for 3 roll Adjustable Impact Transition Idlers (5°-30°)
Frame for 3-Equal roll Troughing Training Idlers (35°)
Frame for 3-Equal roll Troughing Training Idlers (20°)
Frame for 3-Equal roll Impact Idlers (35°)
Frame for 3-Equal roll Impact Idlers (20°)
Frame for Single Roll Return Training Idler
Frame for 2-Equal roll V-return idler
Frame for 3-Equal Roll Machined Carrying Idler (35°)
Frame for 3-Equal Roll Weighing Idler (35°)
Frame for 3-Equal Roll Non-Magnetic Troughing Idler Idler (35°)
Frame for 3 Roll staggered Idler (35°)
Frame for Single Roll Deflector Idler
Frame for 2-Equal roll carrying Idler
Frame for 2-Equal roll flat return Idler
SEI Engineering Works Pvt. Ltd.
BLACK DIAMOND EQUIPMENTS PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .