Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical admitted |
| 2 | Accepted-Technical R O SUMOOR NUBRA | LEH LADAKH | LADAKH | 194101 | Accepted-Technical admitted |
| 3 | Accepted-Technical | Accepted-Technical admitted |
Tender Value
₹90.0 L
EMD Value
₹2.1 L
Closing Date
23 Sept 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal at Nungstet. ( Under BADP)
2026_PWD_19512_1
35 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
LEH
Please refer to tender document
4 documents required · 4 mandatory
₹2,000
Payable To Executive Engineer InFC division Leh
₹2.1 L
29 Sept 2026
9 Sept 2026
25 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge.
A. All kinds of soil 50%. | 3,780 | Cum | 208.42 | ₹7,87,827.6 |
| 2 | B. Ordinary rock 25%. | 1,890 | Cum | 383.88 | ₹7,25,533.2 |
| 3 | C. Hard rock 25%. | 1,890 | Cum | 1,095.42 | ₹20,70,343.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 672 | Cum | 6,606.08 | ₹44,39,285.76 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 864 | Sqm | 635.45 | ₹5,49,028.8 |
| 6 | Carriage of material by mechanical transport . A. Cement an avg lead of 180 kms. | 14.78 | M.T | 1,641.04 | ₹24,254.57 |
| 7 | B. Sand an avg lead of 05 kms. | 315.84 | Cum | 201.14 | ₹63,528.06 |
| 8 | C. Stone agg an avg lead of 40 kms. | 598.08 | Cum | 567.45 | ₹3,39,380.5 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_46190.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .