Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 10 A FRIENDS COLONY PATIALA 147001 | PATIALA | PUNJAB | 147001 | ₹1.0 Cr | L1 | Accepted-AOC as per evaluation |
| 2 | L2₹1.1 CrRejected-AOC | ₹1.1 Cr | L2 | Rejected-AOC As per evalaution |
| Sl No | Description | Qty | Unit | BANSAL CONSTRUCTION CO L1 | RADHE CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15cm or 25 cm x 7.5 cm mesh | 7,222 | Sqmt. | 201 ₹14.5 L | 220 ₹15.9 L |
| 2.00 | Tipping wire crates including equipment | 1,389.28 | Cum | 139 ₹1.9 L | 140 ₹1.9 L |
| 3.00 | stone or Kankar block pitching on slopes of guide bandh and protection works | 597 | Cum | 2,827 ₹16.9 L | 2,840 ₹17.0 L |
| 4.00 | Filling stone or spall on side slopes behind pitching | 299 | Cum | 1,527 ₹4.6 L | 1,530 ₹4.6 L |
| 5.00 | Grouting stone filling or pitching with bajri or shingle | 1,962 | Sqmt. | 156 ₹3.1 L | 160 ₹3.1 L |
| 6.00 | Labour for dismantling existing protion of old protection work including cutting old trangger and stacking old stone for re-use. | 123.11 | Cum | 270 ₹33,239.70 | 275 ₹33,855.25 |
| 7.00 | Excavation in soil using hydraulic excavator and hydraulic Tractor Trolly I/C cutting and loading in trolly and transporting to the embankments location with all lifts and leads, disposal carriage for every additional km upto 10km | 6,514.37 | Cum | 111 ₹7.2 L | 115 ₹7.5 L |
| 8.00 | Dressing of earth work new Work or remodeling unit | 854 | Sqmt. | 1.31 ₹1,118.74 | 1.35 ₹1,152.90 |
| 9.00 | Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder sotne 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading stacking complete in all respect as per PWD specifications and Engineer-in-Charge | 1,933.77 | cum | 1,921 ₹37.1 L | 1,924 ₹37.2 L |
| 10.00 | Filling of boulder stone into wire crates hand packed including Re handling of boulder stone from stackyard to site of work lead 0.5 km-1km including loading and unloading as per specifications and instruction of Engineer in Charge | 1,933.77 | cum | 458 ₹8.9 L | 460 ₹8.9 L |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
7 Mar 2026, 11:00 amClosed
EXECUTIVE ENGINEER
Ropar
REHABLITATION OF SPURS ALONG 3-L BUNDH AS PER DESIGN SECTION NEAR VILLAGE DAUDPUR AND PHASSA TO SAVEGUARD NEARBY ABADIES AND C- LANDS (SLICE-I)
2026_WR_162058_1
1865
Open Tender
Civil Works
Chamkaur Sahib Ropar Distt
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹2.2 L
Yes
16 Apr 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15cm or 25 cm x 7.5 cm mesh
Tipping wire crates including equipment
stone or Kankar block pitching on slopes of guide bandh and protection works
Filling stone or spall on side slopes behind pitching
Grouting stone filling or pitching with bajri or shingle
Labour for dismantling existing protion of old protection work including cutting old trangger and stacking old stone for re-use.
Excavation in soil using hydraulic excavator and hydraulic Tractor Trolly I/C cutting and loading in trolly and transporting to the embankments location with all lifts and leads, disposal carriage for every additional km upto 10km
Dressing of earth work new Work or remodeling unit
Supply of Boulder stone as per PWD specification from cheapest quarry as per P.W.D. specifications (weight of boulder sotne 18 to 40 kg should not be less than 90% and weight of boulder stones 3.6 to 18 kg should not exceed 10%) including loading and unloading stacking complete in all respect as per PWD specifications and Engineer-in-Charge
Filling of boulder stone into wire crates hand packed including Re handling of boulder stone from stackyard to site of work lead 0.5 km-1km including loading and unloading as per specifications and instruction of Engineer in Charge
Extra for compensation for ordinary earth/ordinary clay taken form private land without Royality
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_328367.pdf
BOQ Comparative Chart
xlsx
finsummary_328367.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
slice1newfinal.pdf
Tender Documents • 2.43 MB
BOQ_328367.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid