Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27,397Accepted-AOC | L1 | Accepted-AOC Work was Awarded | |
| 2 | L2₹37,000+₹4,000 (12.1%)Rejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | L2 | Rejected-AOC Tender Not Accepted |
Tender Value
Refer Docs
Closing Date
15 Dec 2023, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES EM II Rewinding of failed various capacity of LT motors in boiler area and rewinding of Control transformer (415V/110V) in LT Modules of Unit I II and III LT SWGR
2023_EB_394449_1
CE/SE/ES /TTPS /No.138/2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
TTPS
As per BQR conditions in NIT
5 documents required · 5 mandatory
₹0
Yes
7 Feb 2024
30 Nov 2023
16 Dec 2023
30 Nov 2023
15 Dec 2023
30 Nov 2023
Rewinding of Motors upto 1.1 kW Rewinding charges of 1.1 KW
Rewinding charges of 0.75KW
Rewinding charges of 0.56KW
Rewinding charges of 0.37KW
Rewinding charges of 0.05KW
Rewinding of control transformer in LT modules (415V/110V) Retrieved copper retained by the contractor.
S. MURUGAN CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .