Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC 4 91 C BYPASS ROAD PUDUKOTTAI THOOTHUKUDI 628 103 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628103 | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 26.07.2022 after negotiation | |
| 2 | L2₹35.1 L+₹3.4 L (10.9%)Rejected-Finance 6TH CROSS STREET KAMARAJ NAGAR PALAYAMKOTTAI | PALAYAMKOTTAI | TIRUNELVELI | TAMIL NADU | 627002 | L2 | Rejected-Finance L2 |
Tender Value
₹32.4 L
EMD Value
₹33,000
Closing Date
27 May 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev)/Project Director, DRDA
O/O AC (D) / PD DRDA Thoothukudi
Strengthening of Theri Road to Sivagnanapuram Road Km 0/0 - 1/250 in Thoothukudi Panchayat Union of Thoothukudi District under TNRRIS 2021-22 -20 percentage component of CGF Grant Package No TN/TUT-01 /2022-23 CGF 20
2022_RDTN_232498_1
AC(D)/PD,DRDA,Tuty,Lr.No A10/905/2022 dt09.05.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹33,000
O/O AC (D) / PD DRDA Thoothukudi
14 Nov 2022
17 May 2022
27 May 2022
17 May 2022
27 May 2022
21 May 2022
20 May 2022
90 days
Amount
Strengthening of Theri Road toSivagnanapuram road Km 0/0 - 1/250 in Thoothukudi Block under CGF 20% - 2021-22 Package No.01
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/250
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-1/250
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/250
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WBM surface using 2.5 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15 m
Providing HM stones of size 0.75 x 0.23 x 0.10
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Pothiraj and Co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .