Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
17 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
THE COMMISSIONER
UDHAGAMANDALAM MUNICIPALITY
Construction of Passenger Shelter near Woodside School (Ward No.7) at Udhagamandalam Municipality
2026_MAWS_719930_1
E2/7298/2026-5
Open Tender
Civil Works
Works
90 days
UDHAGAMANDALAM MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
30 Oct 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Passenger Shelter near Woodside School (Ward No.7) at Udhagamandalam Municipality | |||||
| 1.01 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 19 | m³ | - | - |
| 1.02 | Plain Cement concrete 1 : 4 : 8 (one cement, four sand and eight aggregates) using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 3 | m³ | - | - |
| 1.03 | Brick work In CM 1:5 mix using best country bricks of size 23cm x 11.50cm x 5cm having 350kg/cm2 compressive strength and 15% or less water absorbentin the period of 24hours immersement and confirming to ISI specifications.and using the screened sand and all the materials should be approved by the competent technical authorities etc complete complying with standard specification-- | 5 | m³ | - | - |
| 1.04 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm etc. complete complying with standard specification . For Columns | 36 | m2 | - | - |
| 1.05 | For Plinth beam | 10 | m2 | - | - |
| 1.06 | For roof and Beam | 29 | m² | - | - |
| 1.07 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per SS | 650 | kg | - | - |
| 1.08 | Providing and laying in position, standardised concrete Mix M-20 Grade using In-situ Concrete batching plant/ Ready Mix Concrete (RMC) adopting weigh batch method in accordance with IS 456 using 20mm and down graded hard broken granite
stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete,improve workability without impairing strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10- 12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including Conveyance of concrete from batching plant to Work site, Electricity charges and other works & labour cost involved for concrete production, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 9 | m³ | - | - |
| 1.09 | Plastering in cement mortar 1:3 mix 10mm thick using clean screened sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting for plastering for plastering and protecting from other damages till setting of mortar etc.complete complying with standard specification | 18 | m² | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_864554.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .