Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.5 L+₹37,044.21 (3.66%)Admitted-Fee/PreQual/Technical/Finance | ₹10.5 L+₹37,044.21 (3.66%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.5 L+₹37,190.82 (3.67%)Admitted-Fee/PreQual/Technical/Finance | ₹10.5 L+₹37,190.82 (3.67%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | thirumoorthiconstructions L2 | R.Rajan L3 | S.Manimegalai L1 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Dismantling the old damaged Reinforced cement concrete slab etc. complete as per direction of departmental officers etc. completed. | 4 | m3 | 500.3 ₹2,001.2 Lowest | 2,000 ₹8,000 | 4,158.66 ₹16,634.65 |
| 2.00 | 2. Desilting the existing drain etc. complete as per direction of departmental officers etc. completed. | 210 | m3 | 10 ₹2,100 Lowest | 100 ₹21,000 | 84.46 ₹17,736.6 |
| 3.00 | 3. Dismantling the old damaged existing drain etc. complete as per direction of departmental officers etc. completed. | 72 | m3 | 100 ₹7,200 Lowest | 300 ₹21,600 | 469.25 ₹33,785.64 |
| 4.00 | 4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 210 | m3 | 100 ₹21,000 Lowest | 188 ₹39,480 | 180.4 ₹37,884 |
| 5.00 | 5. Plain cement Concrete in 1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete | 34 | m3 | 5,269.95 ₹1,79,178.3 | 5,532 ₹1,88,088 | 4,889.18 ₹1,66,232.27 Lowest |
| 6.00 | 6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 441 | m2 | 387.64 ₹1,70,949.24 Lowest | 390 ₹1,71,990 | 437.96 ₹1,93,141.24 |
| 7.00 | 7. Plain cement Concrete in 1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 74 | m3 | 6,721.56 ₹4,97,395.44 | 6,250 ₹4,62,500 | 5,511.68 ₹4,07,864.26 Lowest |
| 8.00 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 140 | m2 | 309.57 ₹43,339.8 | 300 ₹42,000 | 253.85 ₹35,538.64 Lowest |
| 9.00 | 6. Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 3 | Qtl | 9,542.15 ₹28,626.45 | 8,500 ₹25,500 | 7,824.56 ₹23,473.69 Lowest |
| 10.00 | 7.Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy e | 9 | m2 | 1,181 ₹10,629 | 750 ₹6,750 Lowest | 968.42 ₹8,715.78 |
Tender Value
₹14.8 L
EMD Value
₹14,800
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Reconstruction of existing Storm water Drain with culvert at Peelamedu main road in W.No 51, East zone, Coimbatore Corporation.
2026_MAWS_694674_18
E52/2026-Single Cover
Open Tender
Civil Works - Others
Works
150 days
Coimbatore corporation
As per tender conditions
5 documents required · 5 mandatory
₹0
₹14,800
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Dismantling the old damaged Reinforced cement concrete slab etc. complete as per direction of departmental officers etc. completed. | 4 | m3 | - | - |
| 2 | 2. Desilting the existing drain etc. complete as per direction of departmental officers etc. completed. | 210 | m3 | - | - |
| 3 | 3. Dismantling the old damaged existing drain etc. complete as per direction of departmental officers etc. completed. | 72 | m3 | - | - |
| 4 | 4. Earth work excavation in all soils with initial lead & lift etc. complete as per direction of departmental officers etc. completed. | 210 | m3 | - | - |
| 5 | 5. Plain cement Concrete in 1:4:8 mix (one cement, four sand,eight metal) using 40mm size Hard Broken stone as per the direction of departmental officers etc., complete | 34 | m3 | - | - |
| 6 | 6. Centering with steel shutters including studding with sides and support etc., for drain as per the direction of departmental officers etc., complete | 441 | m2 | - | - |
| 7 | 7. Plain cement Concrete in 1:3:6 mix (one cement, three sand, six metal) using 20mm size Hard Broken stone as per the direction of departmental officers etc. completed. | 74 | m3 | - | - |
| 8 | 8. Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 140 | m2 | - | - |
| 9 | 6. Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 3 | Qtl | - | - |
| 10 | 7.Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy e | 9 | m2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
ITB.pdf
Additional Documents • 0.19 MB
Document.pdf
Tender Documents • 0.59 MB
BOQ_835245.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .