Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.7 LAdmitted-Finance | -0.01% | ₹19.7 L | L1 | Admitted-Finance |
| 2 | L2₹19.7 L+₹196.73 (0.01%)Admitted-Finance | +0.00% | ₹19.7 L+₹196.73 (0.01%) | L2 | Admitted-Finance |
| 3 | L3₹19.9 L+₹19,869.65 (1.01%)Admitted-Finance | +1.00% | ₹19.9 L+₹19,869.65 (1.01%) | L3 | Admitted-Finance |
| 4 | L4₹20.1 L+₹39,542.58 (2.01%)Admitted-Finance SOLAPUR | MAHARASHTRA | 413001 | +2.00% | ₹20.1 L+₹39,542.58 (2.01%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.7 L
EMD Value
₹20,000
Closing Date
10 Jul 2026, 6:00 pmClosed
Add.Ceo Z.P. Solapur
EE2
Improvements to Narale Kodag Babarwasti V.R. 198 Ch.0/000 to 2/00, Tal Sangola.
2026_SOLAP_1314220_1
Improvements to Narale Kodag Babarwasti V.R. 198 Ch.0/000 to 2/00, Tal Sangola.
Open Tender
Civil Works
Percentage
180 days
Solapur
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹20,000
7 Sept 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. SSR 2022-23.153/21/33 Sp.NO .BDW | 406 | sqm | 7 | ₹2,842 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification Including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate) | 603.9 | CuM | 2,564.65 | ₹15,48,792.14 |
| 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. SSR 2021-22 P.No. 23 / 2.29 | 109.2 | CuM | 638.3 | ₹69,702.36 |
| 4 | Spreading hard murum for side width complete Spec. No.: MORTH 408 SSR SSR 2022-23 P.No. 23 / 2.30 | 109.2 | CuM | 79 | ₹8,626.8 |
| 5 | Providing and fixing Information Sign Board of Size 0.90 X 0.60m. Prepared on 16 gauge M.S. Sheet with Horizontal bracing of M.S. Flat on size 25 X 6 mm including Painting with One Coat Zinc Chrome primer and Two coats oil painting including two number of M.S. angle Iron Post of Size 50 X 50 X 6 mm of 2.70 m lomg including Conveying all taxes fixing in Ground with cement concrete1:4:8 block of 45 X 45 X 45 cm size as directed by Engineer in charge etc. complete. R.A. | 1 | No. | 5,094 | ₹5,094 |
| 6 | BASIC TEST OF AGGREGATE…...Water Absorption, Specific Gravity,Impact Value /Crushing Value. | 1 | No. | 2,495 | ₹2,495 |
| 7 | BASIC TEST OF AGGREGATE…..Sieve Analysis. | 1 | No. | 690 | ₹690 |
| 8 | SOIL / MURUM …..Sieve Analysis. | 1 | No. | 690 | ₹690 |
| 9 | TOTAL ROYALTY AMOUNT AS PER RY STATEMENT | 157.51 | No. | 216.18 | ₹34,050.51 |
| 10 | G.S.T. 18% | 1 | No. | 2,94,310 | ₹2,94,310 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
sbd.pdf
Tender Documents • 2.04 MB
BOQ_2253609.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .