Tender Value
₹49.1 L
EMD Value
₹98,200
Closing Date
26 Jul 2026, 5:00 pmClosed
Santosh Kumar
District Engineer, Lakhisarai
Zila Parishad, Lakhisarai
Santosh Kumar
District Engineer, Lakhisarai
Construction of Boundrywall and Nala in Zila parisad Dak Bangla under Suryagarha block
136403
02/2026-27 ZP Lakhisarai (GR-01)
Open Tender
CIVIL
Lakhisarai
• Earnest Money
• Registration
• Work Experience of Similar nature (10%)
• Availability of key items of Contractor's Equipment (Tractor) - 02 No. , Max. Age - 5 Years
• Availability of key items of Contractor's Equipment (Mixture Machine) - 01 No. , Max. Age - 5 Years
Availability of key items of Contractor's Equipment (WATER TANKER) - 01 No. , Max. Age - 5 Years
• Key Personnel (Site Supervisor / Fresh Graduate in Civil or Diploma Civil + 03 Years Exp. Or retired J.E.) - 1 No
• Affidavit
• Time of Completion
• GST & PAN
• Character Certificate issued from S.P. Office for all members
• Name & Address of Bidder with Contact No. & E-mail ID
CIVIL
PERCENTAGE
L1
1
11 documents required · 11 mandatory
₹5,000
Processing Fee: 1180
₹98,200
Conference Hall of Zila Parishad, Lakhisarai
26 Jul 2026
17 Jul 2026
27 Jul 2026
18 Jul 2026
26 Jul 2026
18 Jul 2026
21 Jul 2026
Technical Sheet
Name of Work Construction of Boundrywall and Nala in Zila parisad Dak Bangla under Suryagarha block Cost of Work as per BOQ Rs. 49,07,300.00 Time of Completion in month 6
Sl No. Items Requirement
Introduction of Tenderers Name of the tenderer(s) of tendering firm-telephone no., mobile no. & Email
Address of the head office in India - telephone no., mobile no. & Email
Address of the branch office in India
Nature of Constitution of the firm
Names of partners and their addresses.
1 Earnest Money As per NIT duly pledged in favour of District Engineer, Zila Parishad, Lakhisarai (Pay either online or offline)
Bid Security Amount - Rs. 98200.00 Bid Security Amount - Rs.
2 Time of Completion 6 Months
3 Registration No. AS PER NIT
4 Similar Nature of work (Minimum 10% of estimated amount) Minimum one similar work
5 GST & PAN AS PER NIT
6 Availability of Key equipment (either owned or leased or by procurement)
Type of equipment Max. age as on 04.07.2026 (Years) Nos. Required
Tractor / Tipper / Dumper 5 2
WATER TANKER 5 1
Mixture Machine 5 1
7 Availability of Key personnel
Personnel Qualification Nos. Required
Site Supervisor Fresh Graduate in civil or Diploma Civil + 03 years Experience or retired JE 1
8 Character Certificate issued from S.P. Office for all members AS PER NIT
9 Affidavit in required format as per NIT (Should be after the publication date of the tender) AS PER NIT
Sl.No Item of work Unit Quantity Rate Amount Remarks 4,907,300.00
A Boundary Wall -48.00
1 Earth Work Excavation in boundary wall foundation trenches do-do all complete. Cum 49.07 360.70 17,698.00
2 P/v R.C.C (1:1.5:3) in Pad Footing dodo -all complete. Cum 14.02 5,670.00 79,486.00
3 P/v R.C.C (1:1.5:3) in Pile do-do all complete. Cum 11.42 5,670.00 64,755.00
4 P/v R.C.C (1:1.5:3) in Grade beam do-do all complete. Cum 9.67 5,670.00 54,820.00
5 P/v R.C.C (1:1.5:3) in Column dodo -all complete. Cum 8.11 5,670.00 45,962.00
6 P/v 100A Brickwork CM(1:4) in S/S dodo -all complete. Cum 87.05 5,017.90 436,813.00
7 Extra cost of Brickwork in S/S do-do all complete. Cum 87.05 842.20 73,314.00
8 P/v R.C.C(1:1.5:3) in top wall dodo -all complete Cum 7.66 5,670.00 43,436.00
9 P/v 12mm thickness cement plaster (1:4) do-do all complete. Sqm 905.02 192.20 173,945.00
10 M.S Reinforcement of R.C.C work do-do all complete. Kg 5393.28 94.50 509,665.00
11 P/v Centring and Shuttering to R.C.C work do-do all complete.
12 P/v White Washing with lime (three or more coats) Sqm 905.02 18.90 17,105.00
13 Finishing Walls with Textured Exterior Wall Paint Sqm 905.02 215.20 194,760.00
Carriage of Materials
Carriage Rs 254,491.00
Seigniorage Fee
Seigniorage Fee 10%=Rs 26,142.00
TOTAL Rs 2,131,639.00
B 16' x 15' Entrance Gate
1 Earthwork Excavation in foundation trenches: Cum 4.53 360.70 1,634.00
2 Making 10" Dia bore upto 4m depth below GL: Mtr 20.31 178.30 3,623.00
4 Supplying and filling in plinth with local sand: Cum 0.453 283.30 128.00
5 P/v R.C.C (1:1.5:3) in Stepped Footing: Cum 5.01 5670.00 28,331.00
11 Centering and Shuttering for R.C.C work:
12 M.S Reinforcement (16mm) for R.C.C Work: Kg 1359.15 91.70 124,634.00
Total Rs 226,444.00
Carriage of Materials
Local Sand m³ 0.453 277.2 126.00
Bricks nos 590 0.84013 496.00
Carriage Rs 38,805.00
Seigniorage Fee
Local sand m³ 0.453 141.85 64.00
Bricks Nos 590 5.128 3,026.00
Kiul Sand m³ 5.62 175.8 988.00
Stone Chips m³ 9.35 686.05 6,415.00
Seigniorage Fee 10%=Rs 1,049.00
Total Rs 266,298.00
Additional Allowances & Fabrications
Cost Of Gate 16X10 100000
Cost Of Paint Primer Hinge 12000
Sign Board And Photo 3500
C 3 Nos 12' x 12' Entrance Gate
1 Earthwork Excavation in foundation trenches: Cum 4.53 360.70 1,634.00
2 Making 10" Dia bore upto 4m depth below GL: Mtr 20.31 178.30 3,623.00
4 Supplying and filling in plinth with local sand: Cum 0.453 283.30 128.00
5 P/v R.C.C (1:1.5:3) in Stepped Footing: Cum 4.5 5670.00 25,531.00
11 Centering and Shuttering for R.C.C work:
12 M.S Reinforcement (16mm) for R.C.C Work: Kg 1610 91.70 147,637.00
Total Rs 231,938.00
Carriage of Materials
Local Sand m³ 0.453 277.2 126.00
Bricks nos 415 0.84013 349.00
Kiul Sand m³ 5 960.1 4,801.00
Stone Chips m³ 8.5 3273.92 27,828.00
Cement MT 4.1 458 1,878.00
Carriage Rs 34,982.00
Seigniorage Fee
Local sand m³ 0.453 141.85 64.00
Bricks Nos 415 5.128 2,128.00
Kiul Sand m³ 5 175.8 879.00
Stone Chips m³ 8.5 686.05 5,831.00
Seigniorage Fee 10%=Rs 890.00
Total Rs 267,810.00
Additional Allowances & Fabrications
Cost Of Gate 12X8 70,000.00
Cost Of Paint Primer Hinge 12,000.00
Cost For 1 Gate 328,703.00
Cost For 3 Gates 986,109.00
D Main Drain 250ft
1 Earth Work Excavation in Drain foundation trenches. 111.51 360.7 40,222.00
2 P/v and supplying of local sand. 12.39 287.3 3,560.00
3 P/v 100A B/F/S in drain foundation. 81.32 283.3 23,038.00
6 P/v 12mm thickness cement plaster (1:4). 220.72 192.2 42,423.00
7 P/v Centering and shuttering to R.C.C work. 278.81 211.6 76,204.00
8 M.S Reinforcement of R.C.C work. 6125.0 94.5 578,813.00
Total 938,527.00
Carriage & Seig. 187,754.00
Final Estimate 1,126,281.00
1 Earth Work Excavation in Drain foundation trenches. 34.52 360.7 12,450.00
2 P/v and supplying of local sand. 4.6 287.3 1,322.00
3 P/v 100A B/F/S in drain foundation. 30.2 283.3 8,557.00
5 P/v 100A Brickwork CM(1:4) in F/P. 15.33 5017.9 76,945.00
6 P/v 12mm thickness cement plaster (1:4). 90.61 192.2 17,416.00
Net Amount 132,146.00
Add Cost of Trench Grates 112,000.00
Carriage & Seig & Photos 37,279.00
FINAL ESTIMATED COST 4,907,252.00
Sl.No Item of work Unit Quantity Rate Amount Remarks 4,907,300.00
A Boundary Wall -48.00
1 Earth Work Excavation in boundary wall foundation trenches do-do all complete. Cum 49.07 360.70 17,698.00
2 P/v R.C.C (1:1.5:3) in Pad Footing dodo -all complete. Cum 14.02 5,670.00 79,486.00
3 P/v R.C.C (1:1.5:3) in Pile do-do all complete. Cum 11.42 5,670.00 64,755.00
4 P/v R.C.C (1:1.5:3) in Grade beam do-do all complete. Cum 9.67 5,670.00 54,820.00
5 P/v R.C.C (1:1.5:3) in Column dodo -all complete. Cum 8.11 5,670.00 45,962.00
6 P/v 100A Brickwork CM(1:4) in S/S dodo -all complete. Cum 87.05 5,017.90 436,813.00
7 Extra cost of Brickwork in S/S do-do all complete. Cum 87.05 842.20 73,314.00
8 P/v R.C.C(1:1.5:3) in top wall dodo -all complete Cum 7.66 5,670.00 43,436.00
9 P/v 12mm thickness cement plaster (1:4) do-do all complete. Sqm 905.02 192.20 173,945.00
10 M.S Reinforcement of R.C.C work do-do all complete. Kg 5393.28 94.50 509,665.00
11 P/v Centring and Shuttering to R.C.C work do-do all complete.
12 P/v White Washing with lime (three or more coats) Sqm 905.02 18.90 17,105.00
13 Finishing Walls with Textured Exterior Wall Paint Sqm 905.02 215.20 194,760.00
Carriage of Materials
Carriage Rs 254,491.00
Seigniorage Fee
Seigniorage Fee 10%=Rs 26,142.00
TOTAL Rs 2,131,639.00
B 16' x 15' Entrance Gate
1 Earthwork Excavation in foundation trenches: Cum 4.53 360.70 1,634.00
2 Making 10" Dia bore upto 4m depth below GL: Mtr 20.31 178.30 3,623.00
4 Supplying and filling in plinth with local sand: Cum 0.453 283.30 128.00
5 P/v R.C.C (1:1.5:3) in Stepped Footing: Cum 5.01 5670.00 28,331.00
11 Centering and Shuttering for R.C.C work:
12 M.S Reinforcement (16mm) for R.C.C Work: Kg 1359.15 91.70 124,634.00
Total Rs 226,444.00
Carriage of Materials
Local Sand m³ 0.453 277.2 126.00
Bricks nos 590 0.84013 496.00
Carriage Rs 38,805.00
Seigniorage Fee
Local sand m³ 0.453 141.85 64.00
Bricks Nos 590 5.128 3,026.00
Kiul Sand m³ 5.62 175.8 988.00
Stone Chips m³ 9.35 686.05 6,415.00
Seigniorage Fee 10%=Rs 1,049.00
Total Rs 266,298.00
Additional Allowances & Fabrications
Cost Of Gate 16X10 100000
Cost Of Paint Primer Hinge 12000
Sign Board And Photo 3500
C 3 Nos 12' x 12' Entrance Gate
1 Earthwork Excavation in foundation trenches: Cum 4.53 360.70 1,634.00
2 Making 10" Dia bore upto 4m depth below GL: Mtr 20.31 178.30 3,623.00
4 Supplying and filling in plinth with local sand: Cum 0.453 283.30 128.00
5 P/v R.C.C (1:1.5:3) in Stepped Footing: Cum 4.5 5670.00 25,531.00
11 Centering and Shuttering for R.C.C work:
12 M.S Reinforcement (16mm) for R.C.C Work: Kg 1610 91.70 147,637.00
Total Rs 231,938.00
Carriage of Materials
Local Sand m³ 0.453 277.2 126.00
Bricks nos 415 0.84013 349.00
Kiul Sand m³ 5 960.1 4,801.00
Stone Chips m³ 8.5 3273.92 27,828.00
Cement MT 4.1 458 1,878.00
Carriage Rs 34,982.00
Seigniorage Fee
Local sand m³ 0.453 141.85 64.00
Bricks Nos 415 5.128 2,128.00
Kiul Sand m³ 5 175.8 879.00
Stone Chips m³ 8.5 686.05 5,831.00
Seigniorage Fee 10%=Rs 890.00
Total Rs 267,810.00
Additional Allowances & Fabrications
Cost Of Gate 12X8 70,000.00
Cost Of Paint Primer Hinge 12,000.00
Cost For 1 Gate 328,703.00
Cost For 3 Gates 986,109.00
D Main Drain 250ft
1 Earth Work Excavation in Drain foundation trenches. 111.51 360.7 40,222.00
2 P/v and supplying of local sand. 12.39 287.3 3,560.00
3 P/v 100A B/F/S in drain foundation. 81.32 283.3 23,038.00
6 P/v 12mm thickness cement plaster (1:4). 220.72 192.2 42,423.00
7 P/v Centering and shuttering to R.C.C work. 278.81 211.6 76,204.00
8 M.S Reinforcement of R.C.C work. 6125.0 94.5 578,813.00
Total 938,527.00
Carriage & Seig. 187,754.00
Final Estimate 1,126,281.00
1 Earth Work Excavation in Drain foundation trenches. 34.52 360.7 12,450.00
2 P/v and supplying of local sand. 4.6 287.3 1,322.00
3 P/v 100A B/F/S in drain foundation. 30.2 283.3 8,557.00
5 P/v 100A Brickwork CM(1:4) in F/P. 15.33 5017.9 76,945.00
6 P/v 12mm thickness cement plaster (1:4). 90.61 192.2 17,416.00
Net Amount 132,146.00
Add Cost of Trench Grates 112,000.00
Carriage & Seig & Photos 37,279.00
FINAL ESTIMATED COST 4,907,252.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 02 2026-27 SURYAGARHA.pdf
NIT • 9.16 MB
18025_Technical SheetGr01.xls
NIT • 0.04 MB
18878_TenderDocsGr01.doc
NIT • 0.48 MB
NIT 02 2026-27 SURYAGARHA.pdf
NIT • 9.16 MB
BOQ Surygarha.xlsx
NIT • 0.02 MB
BOQ Surygarha.xlsx
NIT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .