Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
3 Oct 2026, 3:00 pm6d left
CWA(WnS)II
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE CHIEF WATER ANALYST (WnS)- II HAIDERPUR WATER WORKS DELHI 110085
Repair and Servicing of Existing Absorption systems with replacement of caustic tank with allied works at Post Chlorination system (North and South), Water Treatment Plant Haiderpur Phase-I under CWA (WnS)-II.
2026_DJB_299017_1
NIT No. 08(26-27)/CWA(WnS)II
Open Tender
Miscellaneous Works
Works
120 days
HAIDERPUR WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Online sabpaisa portal Allahabad Bank
₹50,000
25 Sept 2026
25 Sept 2026
3 Oct 2026
25 Sept 2026
3 Oct 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | North Chlorine Leak Absorption System Replacement by Supply and Installation of Caustic Re Circulation Pump, PP Pump
Pump Capacity- 1HP
Flow- 10 M3/hr
MOC-PP
Base Frame-MS | 1 | No. | - | - |
| 2.01 | Replacement by Supply and Installation of 6 M3 PPFRP/MS FRP Caustic Storage Tank
PP Sheet Thickness- 3MM
FRP Thickness-5MM
Level Indicator Nozzle-2 Nos, 1” Provided
Drain, Overflow Nozzle- 2Nos, 1” Provided
Water Inlet and Main Hole Nozzle- 1” Provided | 1 | No. | - | - |
| 3.01 | Providing Caustic Solution for Caustic Tank | 1 | Lot | - | - |
| 4.01 | Repairing, Servicing and Overhauling of Centrifugal Blower,
Replace by 7.5 HP Motor, III Phase, Induction Type, Make CG,
ABB, Bharat Biz lee etc
Replacement of MS FRP Impeller
Repairing of MS Frame and Blower Fiber Body by Grinding, Welding, etc. | 1 | No. | - | - |
| 5.01 | Repairing and Servicing of Agitator Assembly by replacement of Shaft and Impeller
Winding Coil prepared and installed in motor
Change the Terminal Plates of Motor
Oiling and Greasing of Motor
Grinding and Finishing of Agitator Assembly | 1 | No. | - | - |
| 6.01 | Repairing and Servicing, Painting of Blower, ducting Line | 1 | Lot | - | - |
| 7.01 | South Chlorine Leak Absorption System Replacement by Supply and Installation of Absorption Tower, PPFRP/MS FRP
Grinding and clean the outside structure of Absorption Tower, Repairing of Flanges and Nozzles
Filled the PP Paul Rings inside the Absorption Tower
Repairing and Jointing of Mist Eliminator
Replacement of Diffuser+B30 | 1 | No. | - | - |
| 8.01 | Repair and Servicing of Caustic Re circulation Pump
Overhauling of Caustic Pump Motor
Winding work of Caustic Pump Motor
Oiling and Greasing of Motor and PP Pump
Fabrication of Base Frame of Caustic Re circulation Pump | 1 | No. | - | - |
| 9.01 | Replacement by Supply and Installation of 6 M3,
PPFRP/MS FRP
Fabricated with MS Sheet
FRP Lining inside the Tank
Providing and fixing the Level Indicator Nozzles
Providing and fixing of Drain and Overflow Nozzles | 1 | No. | - | - |
| 10.01 | Repairing and Servicing of Centrifugal Blower
Repairing and Servicing of Blower Motor
Winding of Motor Coil
Change the Terminal Plates and Bush | 1 | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_398986.xls
BOQ • 0.29 MB
NITNO08doc.pdf
Tender Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .