| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L Quoted ₹10.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.6 LRejected-AOC TAMIL NADU | PUDUKKOTTAI | TAMIL NADU | 613301 | ₹11.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SUSAND AGENCIES | MENAKA CONSTRUCTION ENGINEERS |
|---|---|---|---|---|---|
| 1.00 | Filter cleaning work:
Charges for Filter cleaning work in stage I & II - Removing the filters from the frames of AHUs/Package units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames - If necessary, replacing the damaged filters with new/reconditioned filters. | 24 | Opn | 57,000 ₹67,260 | 62,712 ₹74,000.16 |
| 2.00 | Filter cleaning work:
Charges for filter cleaning work in Stage III - Removing the filters from the frames of AHUs/Package Units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames -If necessary, replacing of the damaged filters with new/reconditioned filters. | 24 | Opn | 57,000 ₹67,260 | 62,712 ₹74,000.16 |
| 3.00 | Cooling coil cleaning work:
Charges for cleaning the cooling coil of the AHUs/Package Units, in stage I & II by Soap water washing. | 12 | Opn | 1,08,000 ₹1.3 L | 1,18,800 ₹1.4 L |
| 4.00 | Cooling coil cleaning work:
Charges for cleaning the cooling coil of AHUs in Stage III, by Soap water washing | 12 | Opn | 1,08,000 ₹1.3 L | 1,18,800 ₹1.4 L |
| 5.00 | Condenser Cleaning Work:
Charges for cleaning the condensers of AC plants and Package units in Stage I, II & III. Dismantling the end covers at both sides of condenser - Providing dummy plates in pipes for arresting water leak - Admitting water & air into the tubes and cleaning the inner surfaces of tubes using brush - removing dummy plates and re-fixing the end covers by providing the rubber gaskets. [Materials - Contractor scope]. | 12 | Opn | 72,000 ₹84,960 | 79,200 ₹93,456 |
| 5.10 | Material Cost: ( Contractor’s Scope)
Rubber Gasket 5 mm thick for pumps. | 1 | LS | 2,063 ₹2,434.34 | 2,270 ₹2,678.60 |
| 6.00 | V' - Belt and Bearing Related Work:
Charges for checking the performance of the bearings and Alignment of 'V' Belts in AHUs and Package units - If necessary, Replacing the bearings and 'V' belts. | 372 | Nos | 1,76,700 ₹2.1 L | 1,94,556 ₹2.3 L |
| 7.00 | Grease Application Work:
Charges for greasing the bearings in AHUs and package Units. | 372 | Nos | 1,11,600 ₹1.3 L | 1,22,760 ₹1.4 L |
| 8.00 | Compressor Oil related work:
Charges for compressor oil related work in the AC plant - Draining oil from oil chamber of compressor - Removing oil chamber cover - Cleaning/renewing the suction and discharge oil filters - Cleaning the oil lines - Fixing the oil chamber cover - Topping up of oil - Leak testing and commissioning. | 6 | Opn | 86,250 ₹1.0 L | 94,878 ₹1.1 L |
| 8.10 | Material Cost: ( Contractor’s Scope):
Servo Friz F 57 Oil | 100 | Ltrs | 21,300 ₹25,134 | 24,000 ₹28,320 |
Tender Value
Refer Docs
EMD Value
₹9,100
Closing Date
2 Jan 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM II ACP Stage I II III Cleaning of filters cooling coils condensers cooling towers and greasing of bearings in AC Plants and periodical overhauling of pumps equipments from 01.04.2026 to 31.03.2027
2025_EB_634436_1
CE/SE/O/TTPS/Spec.No.73/26-27
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,100
Yes
CE/TTPS
23 Mar 2026
20 Dec 2025
3 Jan 2026
20 Dec 2025
2 Jan 2026
20 Dec 2025
20 Dec 2025
Filter cleaning work: Charges for Filter cleaning work in stage I & II - Removing the filters from the frames of AHUs/Package units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames - If necessary, replacing the damaged filters with new/reconditioned filters.
Filter cleaning work: Charges for filter cleaning work in Stage III - Removing the filters from the frames of AHUs/Package Units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames -If necessary, replacing of the damaged filters with new/reconditioned filters.
Cooling coil cleaning work: Charges for cleaning the cooling coil of the AHUs/Package Units, in stage I & II by Soap water washing.
Cooling coil cleaning work: Charges for cleaning the cooling coil of AHUs in Stage III, by Soap water washing
Condenser Cleaning Work: Charges for cleaning the condensers of AC plants and Package units in Stage I, II & III. Dismantling the end covers at both sides of condenser - Providing dummy plates in pipes for arresting water leak - Admitting water & air into the tubes and cleaning the inner surfaces of tubes using brush - removing dummy plates and re-fixing the end covers by providing the rubber gaskets. [Materials - Contractor scope].
Material Cost: ( Contractor’s Scope) Rubber Gasket 5 mm thick for pumps.
V' - Belt and Bearing Related Work: Charges for checking the performance of the bearings and Alignment of 'V' Belts in AHUs and Package units - If necessary, Replacing the bearings and 'V' belts.
Grease Application Work: Charges for greasing the bearings in AHUs and package Units.
Compressor Oil related work: Charges for compressor oil related work in the AC plant - Draining oil from oil chamber of compressor - Removing oil chamber cover - Cleaning/renewing the suction and discharge oil filters - Cleaning the oil lines - Fixing the oil chamber cover - Topping up of oil - Leak testing and commissioning.
Material Cost: ( Contractor’s Scope): Servo Friz F 57 Oil
Cooling Tower Cleaning Work: Charges for complete cleaning of cooling towers. Draining the water - Removing the choking particles like slurry, mud, scales of rust etc in tank - Scrubbing and removing the algae growth in Louvers and surroundings -Admitting fresh water.
Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit III, Conference Hall, DCS I, DCS II, Service Building and switch yard I with motor capacity of 3.7 KW to 7.5 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
Material Cost: (Contractor’s Scope) Bearing No : 6306
Material Cost: (Contractor’s Scope) Bearing No : 4304
Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit IV & V CW and chiller pump and Unit I & II CW pumps with motor capacity of 15 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
Material Cost: (Contractor’s Scope) Bearing No : 6308
Material Cost: (Contractor’s Scope) Bearing No : N 308
Material Cost: (Contractor’s Scope) Gland rope of various sizes.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_759156.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid