| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.4 Craccepted-finance | ₹1.4 Cr | accepted-finance |
Tender Value
₹1.0 Cr
EMD Value
₹2 L
Closing Date
1 Apr 2026, 10:00 pmClosed
Hubli Electricity Supply Company Limited
Construction of 05 nos of 11kV link lines for a distance of 18.3 Rkms from 33 KV Hulkund,33KV Bhatakurki and 110 KV Ramdurga sub stations in Ramdurg Division on Total turn key basis.
HESCOM/2025-26/EL/WORK_INDENT1081
HESCOM/2025-26/EL/WORK_INDENT1081
Open
Electrical
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
₹2,590
₹2 L
1 Apr 2026
16 Mar 2026
2 Apr 2026
20 Mar 2026
23 Mar 2026
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
HT line in Rkms LT line in Rkms DTC in Nos
Details of existing commitments and on-going works to be completed during next 13 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B =A*1*1.5-B
Where 'N'= 13 months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22,2022-23, 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next " 13 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "13 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
ZONE : BELAGAVI
CIRCLE : BELAGAVI
DIVISION : RAMDURG
SUB DIVISION : RAMDURG
Construction of 05 nos of 11kV link lines for a distance of 18.3 Rkms from 33 KV Hulkund,33KV Bhatakurki and 110 KV Ramdurga sub stations in Ramdurg Division on Total turn key basis.
NAME OF THE STATION 33/11 KV HULAKUND 33/11 KV Batakurki 110/33/11 kv Ramdurga
Section Hualakund Batakurki Ramdurg Rural
NAME OF THE EXISTING FEEDER F-3 GUDAGOPPA F-2 SALAPUR F-7 KADARAKOPPA (A) F-7 KADARAKOPPA (B) F-16 BOCHABAL Total Qty
Sl. No Particulars Unit
1 9 Mtr. RCC Pole 145 Kg WL No 5 4 4 5 4 22
2 9 Mtr. PSCC Pole 200kG WL No 28 0 6 10 30 74
3 9 Mtr. PSCC Pole 200kG WL (Hard Laterrite Soil) No 12 0 10 22
4 9 Mtr. PSCC Pole 200kG WL (Hard Rockl) Nos 15 15
5 11KV ,3 Phase Aerial Bunched Cable 3x120+1x95 Sqmm (Insulated Messenger Wire) Kms. 3.09 3.09
6 Cable Straight through Joint kits suitable for 120 Sqmm set/3 Nos 18 18
7 11 Kv AB Cable Termination kits for 95 to 120 Sqmm set/3 Nos 18 18
8 11 KV Horizontal arms with HTST support, clamps, bolts, nuts and washers for RCC pole Set 5 4 8 4 21
9 11 KV Horizontal arms with HTST support, clamps, bolts, nuts and washers for PSC poles Set 220 245 88 220 773
10 Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Sets 3 2 1 3 9
11 11kv, 5KN polymeric Pin insulator No 354 515 132 354 1355
12 11kV 45 KN polymeric insulator No 60 42 36 60 198
13 Suspension Clamp Assembly 16 to 70 mm (Excluding pole clamp & Eye Hook) set 90 90
14 Pole clamp for HTY/LT AB cable _MS set 90 90
15 Eye Hook (flat type) for fixing clamps set 90 90
16 Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sqmm (Excluding pole clamps and Eye Hook) Set 36 36
17 End caps Nos 30 30
18 11 KV Lighting Arrester, Metal Oxide 10 kV, 5 kA Polymeric Type with ground disconnector set/3 Nos 6 6
19 Spiral earth electrode No 45 15 10 15 44 129
20 Guy set complete with No 15 Strain Insulator and Concreting Materails Set 6 6 4 18 6 40
21 Concreting of Guy sets with Boulders, Mud sand No's 6 10 6 18 6 46
22 Rabbit ACSR Conductor 1.5% Sag Kms. 12.18 15.22 6.69 12.18 46.27
23 PG Clamps for Rabbit No's 30 24 18 24 96
24 EG Stirrups with GI Wire lacing Set of 2Nos 44 30 6 44 124
25 Caution / Danger Board No 15 15 6 15 51
26 H frame for mounting GOS Set 3 2 1 3 9
27 11 Kv, 200 Amps, Single Break GOS Nos 3 2 1 3 9
28 Height Piece for 9 mtr PSC poles to avoid crossing (calculated considering Material+Labor Charges 10 8 4 39 61
29 Grounding connection for messenger wire No 12 12
30 R & R off Rabbit ACSR Conductor 1.5% Sag Kms. 9 10 4.46 9 32.46
Abstract of Proposed Link Line of Haveri Division
Sl No Sub Division Proposed Nos RKm Estimate Cost (In Lakh) Remarks
Revised Abstract of Proposed Link Line of Haveri Division
Sl No Sub Division Proposed Nos RKm Estimate Cost (In Lakh) Remarks
BENEFIT TO RATIO AND PAY BACK PERIOD CALUCLATION
Techno - Economical Feasibality Study Using PERSENT WORTH CALUCLATION by DCF Method
Sl No Particular Formula ALL
1 Interest Charges A 10%
2 O&M Charges B 1.10%
3 Project Life C 25Years
4 Annuity Charges D 9.07
5 Capital Investment in Rs E #REF! 4039382 2249756
6 Energy Rate Per KWH at 11kv BUS F 8.3
7 Annual O&M Expenses in Rs G=E*B #REF!
8 Present Worth of Annual Expenses During the Life of Assests in Rs H=G*D #REF! 14762.63179
9 Present Worth of Cash Outflow in Rs I=H+E #REF!
10 Annual Reduction of Energy Losses in KWH J #REF! 139827.76
11 Annual Benifit due to Reduction of Energy Losses in Rs K=J*F #REF!
12 Prasent Worth of cash in flow HVDS in Rs (Total Benefit in Reduction of Annual EnergyLosses During Life period of Assets) L=K*D #REF! 53247
13 Benefit to Investment ratio M=L/I #REF!
14 Payback Period in Years N=I/K #REF!
Annual energy loss Before Bifurcation 2015379
Annual energy loss After Bifurcation 1267952
Annual Reduction of Energy Losses in KWH 747427
11 KV Link line works to be taken up
Sl.No Circle Division Sub Division Existing Station Existing feeder Existing Details Residual Details Proposed Station Type of Station New /Augmentation/Additional /Upgradation/Existing Probable date of commissioning for new /additional/augmentation sub station Name of the proposed feeder Proposed Connected load Proposed Length of line in R Kms Total Length in KM Proposel+Residuel Estimate cost in lakhs Estimate cost Existing Proposed Residual Energy Savings (in MU) %VR CB Ratio Breaker availability Yes/No Priority Cost per Km
Peak load in Amps Connected load Length of the line in Km %VR Connected load Length of the line %VR
1 Haveri Haveri Hanagal 33/11 kv MUSS Kalakeri F6 KANNESHWAR 195 2128 10.29 6.31 1127 6.85 1.61 4.7 33/11 kv MUSS Kalakeri Existing Siddeshwar 2882 7.3 9.21 32.3 3229083.0 0.9 0.4 0.1 0.42 0.22 2.17 4.77 Breaker available 5 4.40 4.769155825
2 Haveri Haveri Hanagal 33/11 kv MUSS Sheshagiri F11 HIREKAUNSHI 188 3126 12 6.64 1983 8.1 3.02 3.62 33/11 kv MUSS Sheshagiri Existing Lokparmeshwari 1983 12 15.24 40.7 4065741.0 0.8 0.12 3.85 2.07 Required 6 3.39 2.06604405
3 Haveri Haveri Hanagal 33/11 kv MUSS Sheshagiri F3 KONANAKOPPA 190 1916 10.29 5.56 1127 6.85 1.76 3.8 33/11 kv MUSS Laxmipur Existing Shiragod 1916 12 10.29 43.4 4340513.0 1.7 1.5 0.0 0.16 0.15 2.17 2.42 Required 7 3.62 2.419068898
4 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F8 KAREKYATANAHALLI 190 2028 7.75 2.52 1127 6.85 1.76 0.76 110/33/11 kv MUSS Tilavalli Existing Varada 1667 6 9.2 26.2 2623060.0 0.9 0.3 0.2 0.38 0.15 9.22 4.00 Required 8 4.37 4.002958377
5 Haveri Haveri Haveri 33/11kV Hosaritti F10-Melamuri 200 4847 10.23 24.07 1703 6.85 5.22 18.85 33/11kV Hosaritti Existing Melamuri-1 2904 7.5 14.35 39.1 3914041.0 1.11 0.50 0.09 0.52 0.25 5.38 4.47 Available 1 5.22 4.471082444
6 Haveri Haveri Haveri 33/11kV Gandhipur F5-Agasanamatti IP 200 3723 13.15 29.27 1980 8.5 11.14 18.13 33/11kV Gandhipur Existing Agasanamatti-1 1743 8 16.5 41.0 4101631.0 1.35 0.12 0.72 0.51 0.25 4.58 4.27 Available @ 33KV Gandhipur 2 5.13 4.26659541
7 Haveri Haveri Haveri 110/33/11kV Haveri F7-Kurubagonda 225 5638 20.05 46.19 3019 15.64 21.57 24.62 110/33/11kV Haveri Existing Kurubagonda-1 2444 7 22.64 35.9 3589552.0 3.70 0.50 0.93 2.27 0.20 14.37 3.90 Required 3 5.13 3.90020816
8 Haveri Haveri Haveri 33/11kV Kerimattihalli F12-Kallapur 170 4272 17.54 38.99 1877 11.49 12.05 26.94 33/11kV Kerimattihalli Existing Kallapur-1 2395 9.5 20.99 49.4 4938199.0 2.70 0.91 0.37 1.42 0.32 21.92 4.54 Required 4 5.20 4.536066692
9 Haveri Haveri Haveri 33/11kV Gandhipur F2-Kallihal 200 3669 14.65 30.76 1816 8.4 9.96 20.8 33/11kV Gandhipur Existing Kallihal-1 1853 9.5 13.2 49.4 4938199.0 1.42 0.59 0.25 0.58 0.31 9.96 4.39 Required 5 5.20 4.394314607
10 Haveri Haveri Haveri 110/11kV Basavanakatti F7-Kanavalli IP 200 4607 10.8 23.85 1703 6.85 5.49 18.36 110/11kV Basavanakatti Existing Kanavalli-1 2904 8 14.85 41.0 4101631.0 1.90 1.10 0.18 0.62 0.26 23.39 4.44 Available @110KV Basavankatti 6 5.13 4.437259227
11 Haveri Haveri Haveri 33/11kV Kerimattihalli F1-Veerapur NJY 160 4900 17.65 28.68 2530 9.4 9.82 18.86 33/11kV Kerimattihalli(110KV HVR) Existing Veerapur NJY-2 2370 6 15.4 30.8 3077477.0 0.55 0.08 0.17 0.31 0.20 9.04 4.55 Breaker available 7 5.13 4.549181034
12 Haveri Haveri Haveri 110/33/11kV Guttal F6-Kurugunda 200 8097 12.2 29.72 5537 9.35 16.08 13.64 110/11kV Basavanakatti Existing Kurugunda-1 2735 9 18.35 46.1 4613709.0 0.97 0.05 0.39 0.53 0.30 4.36 4.55 Available @110KV Basavankatti 8 5.13 4.551652477
13 Haveri Haveri Haveri 33/11kV Hosaritti F2-Bommanakatti IP 208 4407 11.85 18.15 1565 3.7 2.28 15.87 110/11kV Basavanakatti Existing Bommanakatti-1 2842 9.5 13.2 49.4 4938199.0 1.89 0.77 0.41 0.71 0.35 21.64 4.96 Not required (Y Operation) 9 5.20 4.961322944
14 Haveri Haveri Haveri 33/11kV Gandhipur F3-Karadigudda IP 160 2905 18.55 31.2 1163 8.05 5.27 25.93 33/11kV Gandhipur Existing Anandavana (Karadigudda-1) 1742 9.5 18.05 49.4 4938199.0 1.07 0.38 0.21 0.48 0.31 18.68 4.39 Required 11 5.20 4.394314607
15 Haveri Haveri Haveri 33/11kV Kerimattihalli F5-Kerimattihalli IP 160 3968 11.3 20.24 1640 6 4.5 15.74 33/11kV Kerimattihalli Existing Kerimattihalli-1 2364 9.5 16 49.4 4938199.0 0.90 0.28 0.13 0.49 0.31 14.34 4.39 Required 13 5.20 4.394314607
17 Haveri Haveri Savanur 110/33/11KV Savanur F-4 Ichangi EIP 212 7436 21.4 36.92 3819 12.65 12.06 33/11KV Hattimattur Existing F-4 Ichangi EIP 3617 6.5 33.25 33.6 3361906.0 0.1 0.0 0.0 0.0 0.23 21.47 4.79 Not required (Y Operation) 6 5.17 4.788950078
18 Haveri Haveri Shiggaon 110/11kV Shiggaon F6-Mallur IP 180 3422 15.2 15 1040 5.7 9.5 110/11kV Shiggaon Existing F6-Mallur IP -1 2971 7.1 12.8 31.9 3193088.0 0.42 0.08 0.08 0.3 0.21 7.4 4.60 Not required (Y Operation) 1 4.50 4.603693979
19 Haveri Haveri Shiggaon 110/11kV Shiggaon F2-Dundashi IP 195 4062 17.9 30.22 1579 13.2 12.81 110/11kV Adavisomapur Existing Dundashi -1 2168 10.05 23.2 49.8 4978064.0 0.5 0.1 0.1 0.3 0.11 15.93 1.55 New breaker available at 110 KV Dundashi 2 4.95 1.54678606
20 Haveri Haveri Shiggaon 33/11kV Bommanahalli F9-Shadagaravalli 150 2869 15.9 15.1 1402 11.5 4.6 33/11kV Bommanahalli Existing F9-Shadagaravalli -1 1429 6.6 18.1 34.9 3488154.0 0.28 0.03 0.06 0.19 0.19 6.4 3.83 Not required (Y Operation) 4 5.29 3.832972971
21 Haveri Haveri Shiggaon 33/11kV Bankapur F8-Chandapur 184 2403 12.6 9.3 1151 9.7 3.1 33/11kV Bankapur Existing F8-Chandapur -1 1415 7 16.7 31.1 3113043.0 0.5 0.1 0.2 0.21 0.21 6.5 4.72 Required at 33 KV Bankapur 6 4.45 4.722067765
22 Haveri Haveri Shiggaon 110/11kV Shiggaon F12-Madli 210 4099 24.25 39.2 1492 17.05 8.7 110/11kV Adavisomapur Existing Madli IP-1 1930 6.8 23.85 33.4 3341175.0 0.4 0.1 0.1 0.19 0.23 15.79 4.82 Not required (Y Operation) Interlink 7 4.91 4.818664093
23 Haveri Haveri Shiggaon 33/11kV Shiggaon F3-Jekinkatti 210 3604 31.9 43.5 2163 24 14.2 33/11kV Shiggaon Existing F3-Jekinkatti -1 1654 7.2 31.2 37.6 3760517.0 1.5 0.8 0.2 0.44 0.26 9.6 4.84 Not required (Y Operation) 8 5.22 4.839760065
24 Haveri Haveri Shiggaon 33/11kV Shiggaon F4-Kurushapur 196 2891 22.7 20.5 752 8.8 1.2 33/11kV Shiggaon Existing F4-Kurushapur -1 1914 7.1 15.9 37.2 3719491.0 1.4 0.0 0.5 0.9 0.24 11.3 4.52 Required at 33 KV Shiggaon 9 5.24 4.51674705
25 Haveri Haveri Shiggaon 33/11kV Hulugur F5-Belavalakoppa 160 2129 24.7 23.27 1854 21.85 11.48 110/11kV Ramanakoppa Existing Belavalakoppa-1 1854 8.3 30.15 40.7 4069661.0 0.6 0.1 0.1 0.3 0.28 11.48 4.82 New breaker available at 110 KV Ramanakoppa 10 4.90 4.816125962
26 Haveri Haveri Shiggaon 33/11kV Bankapur F3-Kundur 120 2580 13 11.3 1366 11.6 4.3 33/11kV Bankapur Existing F3-Kundur -1 1214 6.2 17.8 32.4 3238044.0 0.6 0.1 0.1 0.4 0.21 3.8 4.54 Not required (Y Operation) 11 5.22 4.539777718
27 Haveri Haveri Shiggaon 33/11kV Bankapur F6-Hunagund 194 3220 13.1 14.6 1643 11.1 5 33/11kV Bankapur Existing F6-Hunagund -1 1552 6.9 18 36.3 3626910.0 0.6 0.1 0.1 0.5 0.23 6.9 4.44 Idle Avaiable at 33 KV Bankapur 12 5.26 4.439040395
28 Haveri Haveri Shiggaon 33/11kV Bankapur F5-Kalyan IP 130 4133 17.2 20.8 1503 6.5 2.2 33/11kV Bankapur Existing F5-Kalyan IP -1 1259 6.5 13 34.4 3441584.0 0.8 0.2 0.2 0.5 0.23 5.1 4.68 Not required (Y Operation) 13 5.29 4.678078466
Total 226.1 1105.9 110586967 6.56 4.15 Not required (Y Operation) 13 4.89
11 KV Link line works to be taken up
Sl.No Circle Division Sub Division Existing Station Existing feeder Existing Details Residual Details Proposed Station Type of Station New /Augmentation/Additional /Upgradation/Existing Probable date of commissioning for new /additional/augmentation sub station Name of the proposed feeder Proposed Connected load Proposed Length of line in R Kms Total Length in KM Proposel+Residuel Estimate cost in lakhs Estimate cost in lakhs Existing Proposed Residual Energy Savings (in MU) %VR CB Ratio Breaker availability Yes/No Priority Cost per Km
Peak load in Amps Connected load Length of the line in Km %VR Connected load Length of the line %VR
2 Haveri Haveri Haveri 33/11kV Kerimattihalli F3-Sangur IP 160 2582 7.8 13.63 902 4.4 2.96 10.67 33/11kV Kerimattihalli Existing Sangur-1 1680 4 8.4 20.5 2053315.0 0.58 0.25 0.05 0.28 0.13 9.8 4.43 Not required (Y Operation) 14 5.13 4.431857752
3 Haveri Haveri Haveri 33/11kV Kerimattihalli F7-Gourapur IP 170 1865 14.95 30.11 1052 11.5 12.46 17.65 33/11kV Kerimattihalli Existing Gourapur-1 813 4 15.5 20.5 2053315.0 1.11 0.11 0.29 0.71 0.13 5.32 4.43 Not required (Y Operation) 15 5.13 4.431857752
4 Haveri Haveri Haveri 33/11kV Kerimattihalli F8-Herur IP 160 2056 8.7 15.77 413 3.45 1.5 14.27 33/11kV Kerimattihalli Existing Herur-1 1643 4 7.45 20.5 2053315.0 0.89 0.27 0.14 0.48 0.14 8.61 4.77 Required 17 5.13 4.772769887
5 Haveri Haveri Savanur 110/33/11KV Savanur F-6 Maruthipura EIP 210 5748 17.02 27.51 2142 9.32 6.81 110/33/11KV Savanur Existing Maruthipura-1 3606 4.57 26.34 24.9 2486043.0 1.7 0.2 0.7 0.80 0.16 17.4 4.51 Not required (Y Operation) 3 5.44 4.505229284
6 Haveri Haveri Savanur 110/33/11KV Savanur F-15 Kalalkonda NJY 64 2944 26.35 8.46 1892 26.35 6.58 110/33/11KV Savanur Existing Kalalkonda-1 1015 2.533 36.95 17.98 1706372.00 0.24 0.02 0.12 0.10 0.10 2.04 3.89 AB cable by overhead due to ab cable fault 4 7.10 3.893214683
7 Haveri Haveri Savanur 110/33/11KV Savanur F-3 Plantation EIP 200 3556 11.1 9.66 1917 7.6 4.54 110/33/11KV Savanur Existing Plantation-1 1641 3.55 14.25 21.2 2124378.0 0.3 0.1 0.1 0.1 0.13 4.99 4.28 Not required (Y Operation) 5 5.98 4.284369115
8 Haveri Haveri Savanur 110/33/11KV Savanur F-7 Kurubarmallur EIP 210 5131 12.55 20.6 1351 3.6 18.03 110/33/11KV Savanur Existing Kurubarmallur-1 3780 4.57 14.05 22.6 2257098.0 0.1 0.0 0.1 -0.0 0.15 11.3 4.65 Not required (Y Operation) 8 4.94 4.652193177
9 Haveri Haveri Shiggaon 33/11kV Hulugur F3-Basavanal IP 150 2946 11.4 9.2 1904 11.8 7.35 33/11kV Hulugur Existing F4-Kengapur IP 2408 4.5 16.3 17.2 1722800.0 0.3 0.0 0.2 0.2 0.11 8.34 4.47 Not required (Y Operation) Interlink 5 3.83 4.469468307
10 Haveri Haveri Shiggaon 110/11kV Shiggaon F11-Bannur 195 2160 16.65 20.07 1828 15.2 8.15 110/11kV Shiggaon Existing F-11 Bannur -1 1679 3.1 18.3 16.2 1619858.0 0.4 0.1 0.1 0.2 0.11 10.31 4.75 Required 14 5.23 4.753503085
GRAND TOTAL 39.3 #REF! #REF! 20454299
2 Haveri Haveri Hanagal 33/11 kv MUSS Hanagal F3 KAMANAHALLI 200 3126 12 6.64 1143 12 3.85 33/11 kv MUSS Hanagal Existing Chikkeri Hosalli 1143 4 12 24.0 0.13 3.85 3.80 Not required (Y Operation) 5.99 3.798963843
3 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F-7YALIWALA 198 1706 7.35 3.44 904 5.75 1.3 33/11 kv MUSS Bommanahalli Existing Yaliwal 1706 6 0.3 34.1 0.17 2.17 3.49 Not required (Y Operation) 5.68 3.490306188
4 Haveri Haveri Hanagal 33/11 kv MUSS Laxmiur F9 SAVIKERI 198 3858 21.45 15.07 1203 6.05 1.48 33/11 kv MUSS Laxmiur Existing Balihalli 1678 6.09 12.65 36.9 0.36 3.85 6.84 Not required (Y Operation) 6.05 6.83762168
5 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F-5NITAGINKOPPA 180 1690 12.75 6.9 751 12.75 6.9 33/11 kv MUSS Bommanahalli Existing Yllur Plat 1690 5.08 12.75 26.5 0.17 2.17 4.49 Not required (Y Operation) 5.22 4.491618602
6 Haveri Haveri Hanagal 33/11 kv MUSS Bommanahalli F4 BADAMAGATTI 195 1731 7.08 2.1 1077 8.95 3.52 33/11 kv MUSS Bommanahalli Existing Nellikoppa 1731 2 7.08 11.7 0.12 2.17 7.19 Not required (Y Operation) 5.84 7.191220547
5 Haveri Haveri Shiggaon 33/11kV Shiggaon F7-Motalli NJY 65 1616 37.76 9.58 1015 27.93 3.5 110/11kV Shiggaon Existing Motalli NJY-1 576 9.3 37.23 47.1 0.16 1.5 2.38 Canceled 5.06 2.37911494
6 Haveri Haveri Shiggaon 33/11kV Shiggaon F2-K.S.R.P 75 5068 19.58 10.5 3880 16.23 6.95 110/11kV Shiggaon Existing F10-Shiggaon 7500 0.243 16.473 12.4 0.09 5.5 5.09 Canceled 50.94 5.089272299
16 Haveri Haveri Haveri 110/33/11kV Guttal F1-Hounsi 200 3606 10.55 25.64 1978 6.05 10.49 110/33/11kV Guttal Existing Hounsi-1 1628 9.5 15.55 59.3 0.23 4.81 2.71 Required 6.24 2.71406789
7 Haveri Haveri Haveri 33/11kV Kerimattihalli F8-Herur IP 160 2056 8.7 15.77 413 3.45 1.5 33/11kV Kerimattihalli Existing Herur-1 1643 4 7.45 20.5 0.29 6.28 9.92 Required 5.13 9.920543122
11 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F2 JALI 200 1891 10.19 5.35 1064 9.98 3.33 110/33/11 kv MUSS Tilavalli Existing Yattinhalli 1891 7 10.19 40.8 0.13 6.87 2.23 Required 5.83 2.229976223
12 Haveri Haveri Hanagal 110/33/11 kv MUSS Tilavalli F4 KALAGUDDI 195 1940 7.75 2.47 1127 6.85 1.76 110/33/11 kv MUSS Tilavalli Existing Hallibail 1940 8.33 7.75 48.0 0.17 6.87 2.48 Required 5.76 2.478974546
13 Haveri Haveri Hanagal 33/11 kv MUSS Belagalapeth F6 MASANAKATTI 200 2782 12.86 10.19 1754 10.3 5.13 33/11 kv MUSS Belagalapeth Existing Ramapur 2782 8 2.35 35.6 0.37 2.17 7.27 Required 4.45 7.267908871
14 Haveri Haveri Hanagal 33/11 kv MUSS Belagalapeth F4 KADASHETTIHALLI 200 3195 11.87 8.68 2418 8.72 5.34 33/11 kv MUSS Belagalapeth Existing Savasagi 3195 12 11.87 56.9 0.25 2.17 3.08 Not required (Y Operation) 4.74 3.076157215
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
ZONE : HUBBALLI
CIRCLE : HAVERI
DIVISION : HAVERI
SUB DIVISION : HAVERI, HANGAL, SHIGGAON, SAVANUR
LINK LINE ABSTRACT
SUB DIVISION : HAVERI
NAME OF THE STATION 110/33/11kV Haveri 200
NAME OF THE EXISTING FEEDER Kurubagonda
ESTIMATE COST in Rs. 3589552 3589552 Material Cost Labour Cost
Sl. No Particulars Unit Kurubagond -1 TOTAL Rate Amount Rate Amount
HT Line (RKM) 0.39408867 0.39
2 9 Mtr. PSCC Pole 200kG WL No 0 0 4199 0 1742 0
11 Mtr. PSCC Pole 365kG WL 0 0 7913 0 2583 0
3 RCC Pole - 8 Mtr Long, 115 Kg WL Nos. 0 0 5129 0 1425 0
3 PSC Pole - 8 Mtr Long, 115 Kg WL Nos. 0 0 3699 0 1425 0
3 RCC Pole - 8 Mtr Long, 115 Kg WL for stud Nos. 4 4 5129 20516 1425 5700
3 PSC Pole - 8 Mtr Long, 115 Kg WL for stud Nos. 0 0 3699 0 1425 0
4 2 Pin cross for Stud Nos. 8 8 266 2128 160 1280
Special 3Pin cross for Stud 0 0 1151 0 160 0
5 H.T X arms with HTST supports bolts & nuts etc (RCC) Set 4 4 646 2584 272 1088
6 H.T X arms with HTST supports bolts & nuts etc (PSCC) Set 0 0 643 0 272 0
6 LT 4 Pin cross arm for RCC Set 0 0 423 0 160 0
6 LT 4 Pin cross arm for PSC Set 0 0 420 0 160 0
7 Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Sets 2 2 20928 41856 5392 10784
8 11kv, 5KN polymeric Pin insulator No 18 18 205 3690 0 0
9 11kV 45 KN polymeric insulator No 6 6 186 1116 0 0
10 Spiral earth electrode No 2 2 239 478 93 186
11 Guy set complete with No 15 Strain Insulator and Concreting Materails Set 4 4 1170 4680 593 2372
12 Concreting of Guy sets with Boulders, Mud sand No's 4 4 0 0 250 1000
13 Rabbit ACSR Conductor 1.5% Sag Kms. 1.2 1.2 58537 70244.4 4361 5233.2
14 PG Clamps for Rabbit No's 0 0 102 0 0 0
15 EG Stirrups with GI Wire lacing Set of 2Nos 0 0 276 0 160 0
16 Caution / Danger Board No 0 0 150 0 80 0
17 Anti Climbing Divice Kg 0 0 89 0 42 0
18 Guarding Material Span 0 0 4140 0 1194 0
Guarding between HT Road crossing(Including 4 pin "X" Span 0 0 4900 0 762 0
Croos Arm With clamps & bolts,Nuts por Gurding Set 0 0 420 0 160 0
20 GOS 200A single break Nos 2 2 9450 18900 1104 2208
21 H - Frame Set for 11kV, 200Amps Single Break 005 Mounting - Nos 2 2 4332 8664 323 646
22 Complete erection of M-Type Towers 2 2 394980 789960 22798 45596
13 R & R off Rabbit ACSR Conductor 1.5% Sag Kms. 0 0 0 0 4361 0
Sub-Total (I) 978968.4 79577.2
RCC / PSC 9 Mtr Pole No #REF! 1742 #REF!
RCC / PSC 8 Mtr Pole No #REF! 1742 #REF!
Horizantal Cross arms Set #REF! 272 #REF!
Weasel Condcutor Kms. #REF! 3180 #REF!
Sub-Total (I) 0 #REF!
GRAND Total 978968.4 #REF!
Energy Savings 24.170316
ESTIMATE COST 315413
CB Ration 1.427110381
Sl No Particular Formula Kurubagond -1
1 Interest Charges A 10%
2 O&M Charges B 1.10%
3 Project Life C 25Years
4 Annuity Charges D 9.07
5 Capital Investment in Rs E 315,413
6 Energy Rate Per KWH at 11kv BUS F 8.3
7 Annual O&M Expenses in Rs G=E*B 3470
8 Present Worth of Annual Expenses During the Life of Assests in Rs H=G*D 31469
9 Present Worth of Cash Outflow in Rs I=H+E 346882
10 Annual Reduction of Energy Losses in KWH J 9821
11 Annual Benifit due to Reduction of Energy Losses in Rs K=J*F 81514
12 Prasent Worth of cash in flow HVDS in Rs (Total Benefit in Reduction of Annual EnergyLosses During Life period of Assets) L=K*D 739335
13 Benefit to Investment ratio M=L/I 2.13
14 Payback Period in Years N=I/K 4.26
Construction of 39 nos of 11kV link lines from various S/s For a distance of 209.7 Km in Hangal and Savanur sub div of Haveri Division on total turn key and lumpsum basis.
Sl. No. Particulars Savanur Hangal Material Erection Total
Grand Total (Material cost+ Labour Cost) #REF! #REF! #REF!
1 Material cost #REF! #REF! #REF! #REF!
2 Labour charges #REF! #REF! #REF! #REF!
3 GST @ 18% on labour charges #REF! #REF!
4 Contribution towards Employee Provident Fund & ESI Charges on Total labour charges at 16.25% #REF! #REF!
5 Transportation cost from stores to site @ 2% on material cost #REF! #REF!
6 Watch and ward cost @ 1% on material cost #REF! #REF!
7 Insurance cost against theft & accident @ 1% on material cost #REF! #REF!
8 Performance guarantee and loss of interest on margin money fo BG @ 2.5% of the value of BG #REF! #REF! #REF!
9 Total Cost (1 to 9) #REF! #REF! #REF!
Tender Component #REF! #REF!
Construction of 39 nos of 11kV link lines from various S/s For a distance of 209.7 Km in Hangal and Savanur sub div of Haveri Division on total turn key and lumpsum basis.
Sl. No. Particulars Haveri Shiggaon Basavanakatte Adavisomapur Total
Grand Total (Material cost+ Labour Cost)
1 Material cost 0 0 0 0 0
2 Labour charges 0 0 0 0 0
3 GST @ 18% on labour charges #REF!
4 Contribution towards Employee Provident Fund & ESI Charges on Total labour charges at 16.25% #REF!
5 Transportation cost from stores to site @ 2% on material cost #REF!
6 Watch and ward cost @ 1% on material cost #REF!
7 Insurance cost against theft & accident @ 1% on material cost #REF!
8 Performance guarantee and loss of interest on margin money fo BG @ 2.5% of the value of BG #REF!
9 Total Cost (1 to 9) #REF!
Tender Component
Sl. No. Particulars Total
1 Material cost (Exclusive of GST) 978968
2 Labour charges (Exclusive of GST) 79577
3 BASIC RATE 1058546
4 Area Specific Loading on Basic Rates (Sl No. 3) wherever applicable 0
5 Applicable GST on Sl No. 3 & 4 190538
6 Cost of Estimate (Sum of Sl No. 3 to 5) (Amount Put To Tender) 1249084
7 Statutory Charges as per actuals (Inspectorate Charges, Civic Body Charges, Compensation Etc.,) 3000
8 Total Cost of Estimate (Sum of Sl No. 6 & 7) 1252083.8
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
8 tender capacity.xlsx
Others - Tender capacity • 0.02 MB
1 NIT 1081.docx
Others - NIT • 0.11 MB
7 Annexures.doc
Others - Annexure • 0.16 MB
9 Advisory NOte.pdf
Others - Advisory note • 0.67 MB
13 KPTCL Cicrcular insurance surety bond.pdf
Others - Circular • 1.59 MB
6_section-v_SCC KW4INDENT 1081.doc
Others - SCC • 0.09 MB
2_section-i IFB INDENT 1081.doc
Others - IFB • 1.54 MB
10 FD417EXP-12-2024-Dtd-09-08-2024.pdf
Others - Fd Circular • 0.12 MB
4_section-iii_GCC INDENT 1081.doc
Others - GCC • 0.13 MB
5_section-iv_ECC INDENT 1081.doc
Others - ECC • 0.09 MB
11 Ramdurg- Bhatkurki hulkund ramdurg Indent 1081 BOQ.xlsx
Others - BOQ • 1.06 MB
3_section-ii_ITB INDENT 1081.doc
Others - ITB • 0.11 MB
12 Stamp Duty Circular 02 03 2024.pdf
Others - Stamp Duty • 0.09 MB
Download all tender documents and submit your bid