Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC VILL P O CHINCHURIA DIST PASCHIM BARDHAMAN PIN 713378 W B | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹1.7 L | 1 | Accepted-AOC Eligibel L-1 bidder. |
| 2 | 2₹1.7 LRejected-Finance VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | ₹1.7 L | 2 | Rejected-Finance Quoted more than L-1 bidder. |
| 3 | 3₹1.7 LRejected-Finance HARIPUR BARDHAMAN BARDHAMAN 713323 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713323 | ₹1.7 L | 3 | Rejected-Finance Quoted more than L-1 bidder. |
| Sl No | Description | Qty | Unit | CHAKRABORTY AND COMPANY L1 | NANTU KAZI L3 | M/S MAA DALDALI ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01Material Cost | ||||||
| 1.02 | Main shaft Input shaft, idler shaft, input shaft cover. | 1 | nos | 15,450 ₹15,450 | 18,000 ₹18,000 | 16,000 ₹16,000 |
| 1.03 | Main shaft Input shaft, idler shaft, input shaft cover. | 1 | set | 13,390 ₹13,390 | 14,000 ₹14,000 | 14,000 ₹14,000 |
| 2.00 | Spacer 35mm, Snap ring, Spacer ring, Spit ring-02 nos, detend plunger, Spring-detend, gasket selector houding, selector shaft oil seal. | 1 | set | 746 ₹746 | 750 ₹750 | 750 ₹750 |
| 2.01 | Gear 1st | 1 | nos | 8,240 ₹8,240 | 8,250 ₹8,250 | 8,250 ₹8,250 |
| 2.02 | Gear 2nd | 1 | nos | 6,695 ₹6,695 | 6,700 ₹6,700 | 6,700 ₹6,700 |
| 2.03 | Gear 3rd | 1 | nos | 6,180 ₹6,180 | 6,200 ₹6,200 | 6,200 ₹6,200 |
| 3.00 | Gear 4th | 1 | nos | 6,180 ₹6,180 | 6,200 ₹6,200 | 6,200 ₹6,200 |
| 3.01 | Sleeve 4th Gear | 1 | nos | 1,545 ₹1,545 | 1,550 ₹1,550 | 1,550 ₹1,550 |
Tender Value
₹1.6 L
EMD Value
₹2,100
Closing Date
26 Mar 2026, 5:00 pmClosed
AE EnM
S.B.AREA
Repairing of Complete Gear Box of Diesel Bowser No. WB 37 C 7806 under S. B. Project.
2026_ECL_356694_1
GM/SBA/EnM/Tender/25-26/122
Open Tender
Electrical and Maintenance Works
15 days
S.B.Project
Please refer tender document.
4 documents required · 4 mandatory
₹2,100
10 Apr 2026
16 Mar 2026
27 Mar 2026
16 Mar 2026
26 Mar 2026
16 Mar 2026
16 Mar 2026 - 19 Mar 2026
Item Description/ Heading
Material Cost
Main shaft Input shaft, idler shaft, input shaft cover.
Main shaft Input shaft, idler shaft, input shaft cover.
Gear 1st
Gear 2nd
Gear 3rd
Gear 4th
Sleeve 4th Gear
Output flange-08 holes
Reverse idler Gear
Gear shift lever, Gear shift folk & Gear shift knob
Main shaft oil seal, input shaft oil seal
Taper Roller bearing, bearing bush, needle bearing, spigot bearing
Synchro pack SA
Sleeve reverse gear
Gear joint assembly, CSO mounting bracket, SA control tube
Labour Cost:
Geare box dismantling, reparing, fitting and testing etc, Labour Cost: (Skilled manpower 04 nos for 7 days @ Rs 760.00 and Semi Skilled manpower 04 nos for 07 days @ Rs 632.00)
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_369569.pdf
techsummary_369569.pdf
finance_369569.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.60 MB
Tendernotice_3.pdf
PDF • 1.07 MB
BOQ_369569.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid