| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.0 CrAdmitted-Finance | +4.99% | ₹52.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹52.0 Cr+₹3.0 L (0.06%)Admitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | +5.05% | ₹52.0 Cr+₹3.0 L (0.06%) | L2 | Admitted-Finance |
| 3 | L3₹52.9 Cr+₹95.0 L (1.83%)Admitted-Finance | +6.91% | ₹52.9 Cr+₹95.0 L (1.83%) | L3 | Admitted-Finance |
| 4 | L4₹53.0 Cr+₹99.5 L (1.91%)Admitted-Finance | +7.00% | ₹53.0 Cr+₹99.5 L (1.91%) | L4 | Admitted-Finance |
| 5 | L5₹53.0 Cr+₹1.0 Cr (2.02%)Admitted-Finance NEAR SABJI MANDI OPP SHIV DHARAMKANTA PUGAL ROAD BIKANER RAJASTHAN | BIKANER | BIKANER | RAJASTHAN | +7.11% | ₹53.0 Cr+₹1.0 Cr (2.02%) | L5 | Admitted-Finance |
Tender Value
₹49.5 Cr
EMD Value
₹99 L
Closing Date
8 Aug 2026, 6:00 pmClosed
ce ignp bikaner
OFFICE OF THE CHIEF ENGINEER IGNP BIKANER
Renovation Repair and Modernization of Kolayat Lift Canal System
2026_IGNP_574136_5
CE 01 OF 2026-27
Open Tender
Civil Works - Canal
Percentage
548 days
GIRAJSAR
As per ttender documents
3 documents required · 3 mandatory
₹10,000
Xen Kolayat Lift Diviion IGNP Bikaner
₹99 L
Yes
BIKANER
7 Sept 2026
9 Jul 2026
10 Aug 2026
9 Jul 2026
8 Aug 2026
9 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt Clearance/removal of blown sand,
undressed with combined lead up to 50
m from lined canal section a. For FSD up
to 1 m.CARRIAGE OF MATERIALS
EXCLUDING LOADING, UNLOADING
AND STACKING (Rate in Rs.) Earth upto
1/2 km | 1 | cum | 36 | ₹35.96 |
| 2 | Centering & shuttering with plywood or steel sheets including strutting, propping, bracing both ways and removal of form work for foundation in basement rafts beam, bases of columns etc up to plinth level including material. | 0.29 | sqm | 95 | ₹27.55 |
| 3 | LDPE film 250 micron as per IS specification | - | kg | 178 | - |
| 4 | Cement concrete for sleeper cast in situ 1:3:6 (1 cement : 3 Bajari (Coarse sand) : 6 grit
(graded coarse aggregate) 20 mm nominal size) including use of mechanical mixer, scaffolding ,
form work, dressing, excavation of earth, laying tar paper , finishing, refilling of earth in the sides of sleeper, curing etc. as per specifications complete in all respect including cost of tar paper.In side slopeSize 75 x 150 mm | 0.29 | RM | 66 | ₹19.14 |
| 5 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layerswith Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator atOMC, and compacting with smooth wheel roller to achieve the desired density, complete as perMoRTH Specification Clause 401. For Bikaner For Grading III Material | - | cum | 468 | - |
| 6 | Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor) | 0.16 | cum | 21 | ₹3.38 |
| 7 | Gravel work.Gravel (in loose form in non cohesive binding material) work in excavation withuse of pick axe, undressed with combined lead up to 50 M with percentage of gravel or kankar.More than 40% to 60% | - | cum | 110 | - |
| 8 | Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined
lead up to 200 mtrsCompaction of earthwork Extra for laying earth in 15 to 20 cm layers, watering, dressing butexcluding cost of Rolling. | 0.16 | cum | 83 | ₹13.36 |
| 9 | Providing and fabricating steel reinforcement for R.C.C. work including straightening, cutting
bending, placing in position and bindings complete including cost of binding wire in foundation andsuper structure 4.5 mtr. height above plinth level. Hot rolled deformed (IS 1139) cold twisted (IS :1786) bars. | 1 | MT | 79,990 | ₹79,910.01 |
| 10 | Earth work excavation in Ordinary soil, undressed inclusive of all lift but with combined lead up to 50 mtrs Extra for additional lead beyond 350 m up to 400 in ordinary soil. | - | cum | 135 | - |
stage.html
html • 0.00 MB
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
kolayat.pdf
Tender Documents • 3.71 MB
BOQ_1021293.xls
BOQ • 0.31 MB
corigumdum.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .