Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.4 LAccepted-AOC V P O NALPUR P O KHARKHODA DISTT MEERUTH UP | MEERUT | UTTAR PRADESH | 245206 | ₹6.4 L Quoted ₹7.2 L | 1 | Accepted-AOC awarded |
| 2 | 2₹7.5 L+₹23,548 (3.25%)Rejected-AOC | ₹7.5 L+₹23,548 (3.25%) | 2 | Rejected-AOC not found lowest |
| 3 | 3₹7.6 L+₹30,328 (4.18%)Rejected-AOC DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹7.6 L+₹30,328 (4.18%) | 3 | Rejected-AOC not found lowest |
| 4 | 4₹10.0 L+₹2.8 L (38.0%)Rejected-AOC | ₹10.0 L+₹2.8 L (38.0%) | 4 | Rejected-AOC not found lowest |
| 5 | 5₹13.4 L+₹6.1 L (84.6%)Rejected-AOC | ₹13.4 L+₹6.1 L (84.6%) | 5 | Rejected-AOC not found lowest |
Tender Value
₹5.7 L
EMD Value
₹11,417
Closing Date
12 Oct 2020, 5:00 pmClosed
Executive Engineer
JSD Reckong Peo
Survey investigation for preparation of DPR for providing sewerage system to Village Pangi in GP Pangi Tehsil Kalpa DIstt. Kinnaur H.P.
2020_HPIPH_41306_1
RKP-KNR00-7082
Open Tender
Civil Works
Item Rate
60 days
Reckong Peo
Please refer Tender documents.
2 documents required · 2 mandatory
₹400
EE Reckong Peo
₹11,417
Yes
25 Mar 2021
3 Oct 2020
13 Oct 2020
3 Oct 2020
12 Oct 2020
3 Oct 2020
Amount
Providing consultancy service and preparation of DPR of Sewerage System to Village Pangi in G.P. Pangi Tehsil Kalpa Distt. Kinnaur H.P. • Structural and hydraulic design of all components of STPs and Sewer Network and proposed structures as necessary. • Detailed design and drawings of all electromechanical equipment proposed as necessary. • Preparation and submission of all required drawings and DPRs. • Detailed Estimate of Project including O&M. • Bid document prepare after approval of final DPR. • Interaction / discussion with client for getting DPR approval. • Getting all the relevant approvals of the competent authorities. • The scope of this work is broadly as follows:
• To reconfirm all proposed project components and identify, specify and undertake required surveys and investigations as necessary. • To conduct site visits, perform situation analysis and preliminary assessment based on available information, present ground status and prepare Inception Report with proposed design criteria / Plan. • To confirm land acquisition requirements and assess each site’s environmental aspects for detailed design of the project component. • To carry out detailed topographical surveys for producing digitalized drawings using Total Station for contouring on a grid of 15m x 15m or smaller; for preparation of plans of built-up areas, for longitudinal sections, cross sections and detailed alignment plans; and for fly leveling. • To carry out preliminary surveys, geo-technical & other investigations including sewage analysis reports. • To carry out DDPR as per CPHEEO Manuals and other relevant guidelines covering Feasibility Studies, Conceptual Plans and Preliminary Engineering Designs with estimates. • Detailed designs in accordance with best engineering practice, drawings, cost estimates and for all components in close coordination with all stakeholders. The designs shall meet the particular requirements and shall be sufficiently detailed to ensure clarity and understanding by the contractors and will be incorporated into DPR to be submitted for approval at competent level. All the components as delineated in the project scope will require detailed engineering design survey, and water and wastewater analysis shall be carried out. All surveys and investigations shall be accurate and plotted for review of the Department. • The estimate shall be prepared on the basis of prevailing Analysis of Rates (AOR) of the Jal Shakti Department. For Non-SOR items, if any, adopting market rate, proper rate analysis will be carried out in consultation with Department’s officials. • Bidding Documents: After approval of Detailed Project Reports at all competent levels, the Consultant will prepare Bid Packaging plan in accordance with the project phasing / sequencing approved in final DPR. The Bidding Documents shall be prepared as per Standard Procurement Manual (under approval stage) of the Department; along with tender specifications, tender drawings, and bill of quantities (BOQ) etc. complete. The Bid Documents shall be got approved at competent level. • To prepare action plan for O&M of the new and upgraded (if any) infrastructures. • To prepare a detailed implementation schedule, PERT Chart and management plan covering all stages of the implementation process to ensure coordination and minimization of disruption to the general public.
ENVIRO CONNECT
Sanjay Kumar
C AND E CONSULTANCY
MAHENDER SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .