Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | -27.05% | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.8 L+₹59,643.92 (9.66%)Admitted-Finance | -20.00% | ₹6.8 L+₹59,643.92 (9.66%) | L2 | Admitted-Finance |
| 3 | L3₹7.1 L+₹97,714.51 (15.8%)Admitted-Finance GHAZIABAD NAGAR NIGAM | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | -15.50% | ₹7.1 L+₹97,714.51 (15.8%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹1.0 L (16.5%)Admitted-Finance | -15.00% | ₹7.2 L+₹1.0 L (16.5%) | L4 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹84,247
Closing Date
3 Sept 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Hariparvat Zone, Room No. 88 Work regarding the installation of an open gym at Ganpati City Park.
2026_DOLBU_1179648_1
03-08-2026/NAGAR NIGAM AGRA/03-09-2026/23
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹84,247
17 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil mixed with moorum/shingle, kankar requiring the use of special tools & plant such as pick axes sabbals etc. foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. | 59.85 | cum | 145 | ₹8,678.25 |
| 2 | Providing and laying cement concrete in 1:5:10 (1 Cement :5 Fine Sand :10 Stone Ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. | 13.3 | cum | 5,250 | ₹69,825 |
| 3 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors. | 19.95 | cum | 6,500 | ₹1,29,675 |
| 4 | Supply and installation and jointing of 500mmx500mm EPDM rubber mat flooring of thickness 24mm puling all labour material T&P etc. all complete (Rate as per JHS JSCL MR). | 133 | sqm | 1,995 | ₹2,65,335 |
| 5 | Supply and fixing of Chest Press Double. | 1 | Nos | 60,000 | ₹60,000 |
| 6 | Supply and fixing of Leg Press Double. | 1 | Nos | 45,000 | ₹45,000 |
| 7 | Supply and fixing of Triple Twister. | 1 | Nos | 32,000 | ₹32,000 |
| 8 | Supply and fixing of Shoulder Holder Double. | 1 | Nos | 33,000 | ₹33,000 |
| 9 | Supply and fixing of Air Walker. | 1 | Nos | 34,500 | ₹34,500 |
| 10 | Supply and fixing of Doublebar. | 1 | Nos | 39,500 | ₹39,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_2218149.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .