Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 Cr+₹25.8 L (26.8%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | POWERTECH ENGINEERS L1 | SHANZ POWERTECHS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of 145KV Disconnector Switch/Isolator as per Clause 1 of Specification | 10 | Each | 5,49,200 ₹54,92,000 Lowest | 9,50,000 ₹95,00,000 |
| 2.00 | Removal of 145KV Disconnector Switch/Isolator as per Clause 2 of Specification | 10 | Each | 10,000 ₹1,00,000 Lowest | 30,000 ₹3,00,000 |
| 3.00 | Type Test of 145KV Disconnector Switch/Isolator at NABL accredited laboratory as per Clause 3 of Specification. | 1 | Each | 40,00,000 ₹40,00,000 | 23,19,000 ₹23,19,000 Lowest |
| 4.00 | Supply and Installation of Hot Dipped Galvanised structural steel as per Clause 4 of Specification | 200 | Kg | 130 ₹26,000 Lowest | 130 ₹26,000 Lowest |
| 5.00End Termination of Control Cables as per Clause 5 of Specification | |||||
| 5.10 | End Termination of 4C X 2.5 Sq.mm control cables | 30 | Each | 354 ₹10,620 Lowest | 2,000 ₹60,000 |
| 5.20 | End Termination of 10C X 2.5 Sq.mm control cables | 10 | Each | 590 ₹5,900 Lowest | 1,000 ₹10,000 |
Tender Value
₹1.3 Cr
EMD Value
₹3.0 L
Closing Date
7 Sept 2026, 6:00 pmClosed
Chief Engineer and Head TSD
Technical Service Division BARC, Trombay, Mumbai-400085
Supply, Installation, Testing and Commissioning of 145KV Disconnector Switch/ Isolator and associated works at BARC, Trombay.
2026_BARC_919287_1
BARC/TSD/ET/17/2026-2027
Open Tender
Electrical Works
Item Rate
456 days
BARC, Trombay, Mumbai
As per tender document.
5 documents required · 5 mandatory
₹0
₹3.0 L
Conference Room, 2nd FL, TSD
24 Sept 2026
28 Jul 2026
11 Sept 2026
28 Jul 2026
7 Sept 2026
28 Jul 2026
28 Jul 2026 - 6 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing and Commissioning of 145KV Disconnector Switch/Isolator as per Clause 1 of Specification | 10 | Each | - | - |
| 2 | Removal of 145KV Disconnector Switch/Isolator as per Clause 2 of Specification | 10 | Each | - | - |
| 3 | Type Test of 145KV Disconnector Switch/Isolator at NABL accredited laboratory as per Clause 3 of Specification. | 1 | Each | - | - |
| 4 | Supply and Installation of Hot Dipped Galvanised structural steel as per Clause 4 of Specification | 200 | Kg | - | - |
| 5End Termination of Control Cables as per Clause 5 of Specification | |||||
| 5.1 | End Termination of 4C X 2.5 Sq.mm control cables | 30 | Each | - | - |
| 5.2 | End Termination of 10C X 2.5 Sq.mm control cables | 10 | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_966066.xls
BOQ • 0.21 MB
TECHNICAL_BID_BARC_TSD_ET_17_2026_2027.xls
Tender Documents • 0.27 MB
NITHINDI.pdf
Tender Documents • 1.03 MB
Specification.pdf
Tender Documents • 0.07 MB
TenderDocument.pdf
Tender Documents • 1.34 MB
PROFORMAOFSCHEDULE.pdf
Tender Documents • 0.63 MB
SCHEDULE_A.pdf
Tender Documents • 0.76 MB
MANPOWERRECOVERY.pdf
Tender Documents • 0.50 MB
NITENGLISH.pdf
Tender Documents • 0.69 MB
Corrigendum_2.pdf
PDF • 0.04 MB
Corrigendum.pdf
PDF • 0.04 MB
Corrigendum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .