Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -50.00% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | -49.51% | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.3 LAdmitted-Finance | -47.11% | ₹5.3 L | L3 | Admitted-Finance |
| 4 | L4₹5.8 LAdmitted-Finance | -42.11% | ₹5.8 L | L4 | Admitted-Finance |
| 5 | L5₹5.8 LAdmitted-Finance | -41.67% | ₹5.8 L | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
6 Apr 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_306843_2
e-NIT No.205 of 2025-26 Dated 27-03-2026
Open Tender
Civil Works
90 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹20,000
25 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 253.05 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 14.63 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) | - | Cum | 5,733.6 | - |
| 4 | Dumping stone including cost of stones in Horizontal on level | - | cum | 937.9 | - |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | - | cum | 218.4 | - |
| 6 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.
Non-pressure NP-4 class (Medium duty) R.C.C. pipes 900 mm dia. | - | metre | 6,081.65 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc | - | sqm | 628.95 | - |
| 8 | Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand / aggregate Avg lead up to 13 kms . | 134.47 | cum | 318.31 | ₹42,803.15 |
| 9 | Carriage of stone avg lead 08 km | - | cum | 291.45 | - |
| 10 | Carriage of HPC Avg lead up to 90 km by MT | 5 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_996018.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid