| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
18 Aug 2020, 12:00 pmClosed
SUPREINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, MEERUT
DEPOSIT WORK RUNNING CONTRACT DIFFERENT SITES AT 33 KV SUB STATION RAGHUNAGHPUR, GEJHA, UKHLINA AND JAANI IN THE AREA OF EDSD III BHOLA UNDER EDD III PALLAVPURAM, MEERUT
2020_PVVNL_494825_1
29/EDC/MT/2020-21
Open Tender
Electrical Works
Lump-sum
30 days
WORKS
DEPOSIT WORK RUNNING CONTRACT DIFFERENT SITES AT 33 KV SUB STATION RAGHUNAGHPUR, GEJHA, UKHLINA AND JAANI IN THE AREA OF EDSD III BHOLA UNDER EDD III PALLAVPURAM, MEERUT
3 documents required · 3 mandatory
₹590
SUPREINTENDING ENGINEER
₹2,000
Yes
18 Aug 2020
20 Jul 2020
18 Aug 2020
20 Jul 2020
18 Aug 2020
20 Jul 2020
Amount
Cartage of following material from store center Meerut JE Store including loading & unloading at both ends maximum distance up to 40 Km. :–
PCC Pole8.5 mtr long/ST pole 11 mtr long.
Line materials such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire Acsr weasel conductor, GI wire, Ms angle iron & Ms channel, TPMO, Fuse set etc.
10 KV to 100 KV T/f including complete related material required for transformer. 10 KV to 100 KV T/f including complete related material required for transformer.
Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :–
PCC Pole8.5 mrt long/ST pole 11 mtr long.
Line materials such as 11 KV Cross arms 11 KV pin, 11 KV pin insulator, 11 KV Disc, Stay rod, Stay wire Acsr weasel conductor, GI wire, Ms angle iron & Ms channel, TPMO, Fuse set etc.
10 KV to 100 KV T/f including complete related material required for transformer. 10 KV to 100 KV T/f including complete related material required for transformer.
Erection of PCC pole 8.5 mtr long/STP Pole 11 mtr long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of all 11 KV H.T/L.T. line accessories.
Erection of Double pole on PCC pole 8.5 mtr after digging a pitt of size 1.20 x 0.60 x 1.6 mtr in all type of Soil for each pole including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of MS angle and MS channel, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators.
Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT side of T/F.
Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories.
Erection of stay rod complete after digging a pit of size 1.20 x0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.
Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting stringing of proper sagging of ACSR Rabbit conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
Laying lifting & sagging of LT line with ACSR weasel Conductor including proper binding & jumpring.
3 phase 4 wire line
2 phase 3 wire line.
1 phase 2 wire line.
Laying lifting and sagging of LT ABC cable of size 350/395+1x35+1x16sqmm
Fixing of LT distribution box on support and making the proper connection.
Eartingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire.
Removeal of Old & Damaged Conductor from L.T./H.T. Line by opening the bindings Jumpers & Making its roll including proper stacking at site.
Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories .
Laying lifting & sagging of LT line with ACSR Rabbit Conductor including proper binding & jumpring.
3 phase 4 wire line.
2 phase 3 wire line.
Providing and fixing Bamboo Strip in L.T. Line 3 Phase 4 Wire & 2 Phase 3 wire Line with Proper Binding
Providing and fixing stay clamps .
Providing and fixing Holding clamps .
Providing and fixing LT clamps .
Providing and fixing LT Insulator clamps .
Providing and fixing Stay Insulator.
Providing and fixing Bolt and Nuts .
M/S JAI SHIV SHAKTI ENTERPRISES
SATISH ELECTRICALS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .