Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance 21 5 34 3 SADA SAGAR COLONY AYODHYA FAIZABAD 224123 | AYODHYA | FAIZABAD | UTTAR PRADESH | 224123 | -0.50% | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L1₹7.8 LAdmitted-Finance | -0.50% | ₹7.8 L | L1 | Admitted-Finance |
| 3 | L2₹7.9 L+₹3,941.17 (0.50%)Admitted-Finance KAUSHAL PURI COLONY DISTRICT AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | +0.00% | ₹7.9 L+₹3,941.17 (0.50%) | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹78,850
Closing Date
31 Jul 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Subash chandra bose ward me cc sadak va nali nirman karya as per Nit 10
2026_DOLBU_1170305_10
419/NNA/2026
Open Tender
Civil Works
Percentage
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
MC
₹78,850
1 Sept 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in excavation in ordinary soil etc all complete St. No. 251 | 12 | Cum | 125 | ₹1,500 |
| 2 | P/LP.C.C. work in 1:6:12 all complete Work SI No 273 | 3 | Cum | 3,950 | ₹11,850 |
| 3 | Class 150 brick work in 1.4 Csand all complete. SI No 305b | 2.94 | Cum | 5,390 | ₹15,846.6 |
| 4 | P/L of C.C. in 1:2:4 with cement, c/sand and stone grit etc all complete. SI No 279b | 1.47 | Cum | 7,850 | ₹11,539.5 |
| 5 | 12 mm thick plaster in 1:3 with cement and c/sand etc all complete | 44.8 | Cum | 190 | ₹8,512 |
| 6 | Supply & Laying of G.S.B. etc all complete work. | 42 | Sqm | 3,866.86 | ₹1,62,408.12 |
| 7 | S/L of 125 micron Polythene sheet etc all complete. | 420 | Sqm | 25 | ₹10,500 |
| 8 | Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering | 50.4 | Cum | 9,070 | ₹4,57,128 |
| 9 | P/mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect NON METALLIC C.C | 420 | Sqm | 96.25 | ₹40,425 |
| 10 | RCC work in 1:2:4 with cement c/sand and 20mm stone grit etcall complete | 4.5 | Cum | 8,400 | ₹37,800 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_2196263.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .