Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99.7 LAdmitted-Fee/PreQual/Technical/Finance 01 DUDWAN KUPWARA DUDWAN KUPWARA JAMMU KASHMIR 193222 UDYAM JK 12 0031214 | KUPWARA | JAMMU AND KASHMIR | 193222 | -22.75% | ₹99.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹99.8 L+₹6,453.90 (0.06%)Admitted-Fee/PreQual/Technical/Finance | -22.70% | ₹99.8 L+₹6,453.90 (0.06%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 Cr+₹83,900.70 (0.84%)Admitted-Fee/PreQual/Technical/Finance | -22.10% | ₹1.0 Cr+₹83,900.70 (0.84%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.0 Cr+₹1.3 L (1.27%)Admitted-Fee/PreQual/Technical/Finance | -21.77% | ₹1.0 Cr+₹1.3 L (1.27%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.3 Cr+₹27.9 L (28.0%)Admitted-Fee/PreQual/Technical/Finance | -1.11% | ₹1.3 Cr+₹27.9 L (28.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
11 Jun 2026, 4:00 pmClosed
Executive Engineer RnB Handwara
hand div
Construction of ACR, Biology room, Chemistry room ,Computer room,Library room, Physics room at BHSS Magam
2026_PWDJK_311495_3
NIT NO 12 OF 2025-26
Open Tender
Civil Works
Percentage
180 days
Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
Executive Engineer RnB Handwara
₹2.6 L
Yes
29 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottom lift up to 1.5m including back filling available earth in rooms and disposal of surface earth as per direction of site engineer . | 304.42 | cum | 256.85 | ₹78,190.28 |
| 2 | Providing and laying of stone soling/boulders (Hand Packed) including ramming, dressing and watering and carriage up to site. | 43.89 | cum | 900 | ₹39,501 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal) crushed incl all carriages | 44.32 | cum | 5,552 | ₹2,46,064.64 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth Level. 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) incl all carriages | 52.83 | cum | 7,800 | ₹4,12,074 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate20mm nominal) crushed incl all carriages | 148.3 | cum | 6,700 | ₹9,93,610 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl all carriages | 136.76 | cum | 10,017 | ₹13,69,924.92 |
| 7 | Reinforcement of R.C.C work including straightening, cutting, bending, placing in position and binding all complete with TMT Bars. | 16,700 | kgs | 123.2 | ₹20,57,440 |
| 8 | Centering and Shuttering including strutting and propping etc and including removal of same . | - | - | - | - |
| 9 | Foundations, footings, bases of columns etc. for mass concrete. | 460.5 | Sqm | 286.35 | ₹1,31,864.18 |
| 10 | Centering and Shuttering including strutting and propping etc and including removal of same .Suspended floors, roofs, landings, balconies and access platform | 681.88 | Sqm | 718.2 | ₹4,89,726.22 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_1008543.xls
BOQ • 0.26 MB
COrrigendumnitNITNo12Final.pdf
PDF • 0.12 MB
extensionnoticeNIT12.pdf
PDF • 0.65 MB
CorrigendiumFFF.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .