Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 CrAccepted-AOC 94 101 ELECTRONIC COMPLEX PARDESHIPURA INDORE MADHYA PRADESH 452010 UDYAM MP 23 0003779 23AAGCS1664P1ZZ B R M S G M | INDORE | MADHYA PRADESH | 452010 | ₹14.2 Cr Quoted ₹14.3 Cr | L1 | Accepted-AOC Being L1 after negotiation |
| 2 | Rejected-Technical | - | - | Rejected-Technical As the minimum average annual turnover (INR 60 crore) criteria during preceding 3 financial years for OEM of major machinery not met. |
| 3 | Rejected-Technical A 67 SECTOR 57 NOIDA 201301 UP | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Rejected-Technical As the minimum average annual turnover (INR 60 crore) criteria during preceding 3 financial years for OEM of major machinery not met. |
Tender Value
Refer Docs
EMD Value
₹45 L
Closing Date
10 Jun 2025, 5:00 pmClosed
Director
Director, Directorate of Vocational Education and Training, Mumbai
REQUEST FOR PROPOSAL FOR ESTABLISHMENT OF INDUSTRIAL ROBOTICS (IR) LAB AT 3 MAHARASHTRA INTERNATIONAL CENTRE IN MAHARASHTRA
2025_DVET_1167126_1
293/2025-26/MIC-05
Open Tender
Laboratory and scientific equipment
Nagpur, Amravati
as per RFP documents
6 documents required · 6 mandatory
₹30,000
Yes
₹45 L
Yes
DVET, Mumbai 01
24 Sept 2025
3 Apr 2025
11 Jun 2025
3 Apr 2025
10 Jun 2025
10 Apr 2025
3 Apr 2025 - 7 Apr 2025
8 Apr 2025
Amount
CAPEX: Design, procure, install, commission machines, tools and equipment for establishment of Industrial Robotics (IR) Labs as per the BOQ mentioned in Annexure IX A and IX B for:
1. Location: Amaravati
2. Location: Mumbai
3. Location: Nagpur
Operational expenditure should include following components but not limited to : 1. Instructors’ Remuneration for 3 years 2. Consumables (Stationary, Instructional Materials, etc.) 3. Raw Materials for practical training in IR Lab 4. Maintenance of inventory 5. Course Administration costs, if any 6. Housekeeping and allied costs towards maintenance of labs 7. Cost of insurance for manpower, machinery and equipment deployed by the bidder for a period of 3 years 8. Any other incidental expenses
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ.xls
BOQ • 0.39 MB
Tenderdocument.pdf
Tender Documents • 2.83 MB
Download all tender documents and submit your bid