Loading…
Loading…
Tender ID
Tender Value
₹21.5 L
EMD Value
₹2.1 L
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Div- Prayagraj
Executive Engineer Minor Irrigation Div- Prayagraj
Construction of Chhidi-2 Checkdam Village- Chhidi Block -Jasara District - Prayagraj
2026_UPMID_1147583_10
141/M.I./AC./NIVIDA SUCHNA/2026-27 DATE 02-05-2026
Open Tender
Civil Works
Percentage
60 days
as per Work/Item Description
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,800
Executive Engineer Minor Irrigation Division
₹2.1 L
Yes
13 May 2026
13 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in ordinary kanker mixed hard soil I/c 1.50 m lift and 30 m.lead. | 401.08 | Cum | 81 | ₹32,487.48 |
| 2 | Earth work excavation in ordinary kanker mixed hard soil I/c 1.50m to 3.0 m lift and 30 m.lead. | 581.74 | Cum | 91 | ₹52,938.34 |
| 3 | Removal of slush from Nala bed before excavation s.soil | 27.6 | Cum | 111.85 | ₹3,087.06 |
| 4 | E/W excavation in foundation in mar,kabar ordinary & kanker mixed saturated soil beyond 2.0 m lift &10 m lead | 228.77 | Cum | 119.6 | ₹27,360.89 |
| 5 | P.C.C. Work in 1:3:6 cement sand & 20-40 mm stone- ballast I/c cost of materials labour etc. as per required. | 128.49 | Cum | 4,897.95 | ₹6,29,337.6 |
| 6 | R.C.R. stone masonary work in 1:4 cement sand morter I/c the cast of material labour etc. required. for proper complition of the work in foundation. | 38.19 | Cum | 5,427.26 | ₹2,07,267.06 |
| 7 | R.R. stone masonary work in 1:4 cement sand morter I/c the cast of material labour etc. required for proper complition of the work in foundation. & Super Struture | 112.28 | Cum | 4,594.85 | ₹5,15,909.76 |
| 8 | R.C.R. stone masonary work in 1:4 cement sand morter I/c the cast of material labour etc. required for proper complition of the work in superstructure | 59.75 | Cum | 5,427.26 | ₹3,24,278.79 |
| 9 | C.C.Work 1:2:4 cement, sand, 9- 20 mm stone granite grite I/c cast of materials labour etc.as per Required | 32.26 | Cum | 7,005.78 | ₹2,26,006.46 |
| 10 | Plaster work 1:3 cement sand mortar on stone masonary I/c cast of material, labour etc.Required proper completion of work. | 63.81 | Sqm. | 221.59 | ₹14,139.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2147462.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .