Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹10.3 L+₹29,999.70 (3.00%)Accepted-Finance 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | L2 | Accepted-Finance ok |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
23 Jul 2026, 1:00 pmClosed
prashasak and Vdo
Gram Panchayat dhaniswamiyan
Tinshed nirman karya rajkiya uchch madhyamik vidhalay ramdevra (prathmik kaksha ke bachchon hetu)
2026_PRD_575470_1
G.P.dhaniswamiyan /2026-27/48-52 DATE 16.07.2026
Open Tender
Civil Works
Percentage
Gram Panchayat dhaniswamiyan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Gram Panchayat dhaniswamiyan
₹20,000
Yes
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15 cm. To cover the ground surface by cutting the average soil and removing vegetation and small plants and lifting of raw material and shrubs for 1.5 meters and putting them up to a distance of 50 meters. | 450 | SQM | 7.81 | ₹3,514.5 |
| 2 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a distance of 50 meters. | 11.66 | SQM | 178.46 | ₹2,080.84 |
| 3 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 4 sand : 8 ballast and cutting, including lowland. | 1.46 | CUM | 3,447.65 | ₹5,033.57 |
| 4 | Cement Concrete 1:1.5:3 Pouring and supplying the mixture into the reinforced cement concrete, pressing in roof slabs, balconies, beams, lintles, etc., etc., but the cost of steel and shuttering, including restrictions, etc., and leveling the surface with 1:3 cement spices, etc. | 10.13 | CUM | 4,651.83 | ₹47,123.04 |
| 5 | The work of cutting, folding and placing and tying iron for RCC work is done to supply. | 574.7 | KG | 93.28 | ₹53,608.02 |
| 6 | The function of iron in the grill/gate etc., including cutting, plating and applying flat corneas, t and chainls etc. BSR Item 63 | 6,857.8 | KG | 102.72 | ₹7,04,433.22 |
| 7 | Installation and supply of green or yellow lit roof expo corrugated sheets (anti-corrosion, sealing and weather proof and lamp resistant). Analysis 3.5 X for 4.5 = 15.75 m2 | 245.3 | SQM | 598.55 | ₹1,46,824.32 |
| 8 | Coating the prize panel into 3 layers so that there is a single aura (to give even shade) to create an even surface on the new task/ old work. | 122.65 | SQM | 145.02 | ₹17,786.7 |
| 9 | 110 mm diameter PVC. Other necessary materials including pipe insertion | 95 | SQM | 138.72 | ₹13,178.4 |
| 10 | Photo and board | 1 | Nos | 2,000 | ₹2,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
052.pdf
Tender Documents • 2.55 MB
BOQ_1023309.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .