Loading…
Loading…
Tender Value
₹58.8 Cr
EMD Value
₹1.2 Cr
Closing Date
13 May 2026, 11:00 amClosed
Yes (up to 2 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
13 conditions · 2 needing a document upload
Mentioned in attached tender document
Mentioned in attached tender document
6 conditions · 2 needing a document upload
Mentioned in attached tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mentioned in attached tender document.
Design, manufacture, SITC of Microprocessor based Electronic Interlocking system (RDSO Spec No. RDSO/SPN/192/2019 Ver. 2 with latest amendment) at Budha Pushkar (Alteration, indoor & outdoor work), Pushkar, Nand, Kod, Riyan, Bhesra Kalan, Katyasani stations along with SITC of various indoor & outdoor Signalling & Telecom Systems/gears. The work includes excavation of trench, laying of cables in Polyolefin duct/RCC half round pipes/GI Pipe/DWC/HDPE/trench etc., casting of foundations of MACLS Signals/apparatus cases, supply-installation of point machines, Apparatus cases, MACLS signals, Track circuit equipment (DC Track Circuit & single MSDAC in all stations yards), Earthing, Data loggers, ELD, FACS, AFDAS, IoT based RDPMS etc. The work includes addition/alteration in the existing Electronic Interlocking (Kyosan make EI) at Budha Pushkar Station & associated indoor and outdoor works in c/w New BG Line in Pushkar - Merta Section. The work also includes Signalling and telecom work for shifting of existing S&T gears (LC Gates, Signals and location boxes, S&T cables, HASSDAC/SSDAC, etc.) for removal of infringements of S&T gears coming in alignment of New BG Line. The telecom work includes design, supply, installation, configuration, testing and commissioning (SITC) of Telecom indoor and outdoor equipment including IP-MPLS system with power supply arrangement, trenching, laying, jointing and termination of 4*48 fibre OFC (Two on each side of the track) cable along with Fibre management system & Telecom Asset management system and 6 Quad cable along with provision of passenger amenities including IPIS at Pushkar & Katyasani and other telecom works at stations, block sections, TSS/SP/SSP etc. in c/w New BG Line work in Pushkar - Merta Section of Ajmer division of North Western Railway.
SnT-C-AII-26-01
SnT-C-AII-26-01
Open
Works - General
24 Months
Ajmer, Rajasthan
₹0
₹1.2 Cr
13 May 2026
18 Apr 2026
29 Apr 2026
14 items across 1 schedule · ₹3,36,27,277.12 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply of Field IOT Devices/ Field Transmission Unit (FTU)with Basic Functioning of capturing the parameters from the field gears like DC track Circuit, AFTC, Axle Counters, Signals,point Machines, LC Gate, etc with communication hardware to transmit the data to the station gateway system in any variant or combinations of channels in FTU 's/ Field Iot Devices with sum of combinations of all channels of various FTU's/ Field Iot Devices across the station yard (Field IOT device shall support minimum 8 channels) confirming to FRS RDSO/RDPM/FRS/2021 dtd 06.05.2021 or latest. (Per Unit means Channel) Inspection- RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 2646.00 | 4,198.98 | 1,11,10,501.08 |
| 2 | Supply of non intrusive type current sensors Variant : 0-1 Amp DC/0-10 Amp DC /0-1A AC as per RDSO/ RDPM/FRS/2021 dates 06.05.2021 or latest. Note: The sensors can be external or can be mounted/integrated in the IoT Device Inspection-RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 1040.00 | 5,366.35 | 55,81,004 |
| 3 | Supply of galvanically isolated voltage transducers or voltage sensor or voltage sensing channel with high impedence and minimum circuit loading ( in no case shall be more than 5 mA Variant : 0-10 V DC/ 0-50 V DC/ 0-150 V DC, 0-150 V AC as per RDSO/RDPM/FRS/2021 dates 06.05.2021 or latest. Note: The sensors or Voltage sensing channel can be external or can be mounted/integrated in the IoT Device. Inspection-RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 1606.00 | 5,357.09 | 86,03,486.54 |
| 4 | Supply of IOT device for sensing 110V DC Battery bank parameters including current and voltage transducers as per RDSO/RDPM/FRS/2021 dates 06.05.2021 or l a t e s t . Inspection-RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 6.00 | 1,49,518.79 | 8,97,112.74 |
| 5 | Supply of vibration sensors for point machine as per RDSO/RDPM/FRS/2021 dates 06.05.2021 or latest . Inspection-RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 55.00 | 6,215.62 | 3,41,859.1 |
| 6 | Supply of SPD/Data Isolation module for protection of voltage/data . Inspection-RITES Inspection charges: Borne by Railways Payment terms: 100% after supply | Numbers | 30.00 | 3,627.53 | 1,08,825.9 |
| 7 | Supply of RDPMS (Remote monitoring and predictive maintenance System) as per RDSO/RDPM/FRS/2021 dtd 6 May 2021 or Latest with following- A)Field Gateway- As per FRS clause 6.9.1 Primary Media: Wireless media on LoRA, Zigbee or any open source technology in free band of wireless spectrum. In case of connectivity issue on the open source free band wireless system due to higher distance or due to other technical reason, 4G/LTE may be used for that location & Secondary Media :OFC/Copper/WIFI, As per FRS clause 6.5 Protocol(Field to station) : MQTT, SNMP2, MODBUS in addition to OPC-UA may also be used for transfer of data from field IOT device to Service function diagnostic collector and to Central server/Cloud. B)Edge GatewayAs per FRS clause 6.9.5: For communication from Station to Cloud, existing optical fibre network of Railtel may be used. For redundancy 4G/LTE may be used along with OFC network . Asper FRS clause 6.4- Protocol(Station to cloud): OPC-UA should preferably be used to transfer diagnostic data from the connected systems (IoT) to the service function Diagnostics collector (Local server/Edge device) and to Central server/Cloud. MQTT, SNMP2, MODBUS in addition to OPC-UA may also be used for transfer of data from field IOT device to Service function diagnostic collector and to Central server/Cloud. C)Local Console- Station Specific data of all gears shall be available to gateway and shall be accessible even in absence of internet to maintainer. It should be of any reputed make i7 /4GB/256GB SSD/Windows 11/ Intel Integrated Graphics, 32inch Display of Reputed Make & UPS 600VA or better D)Web server: As per FRS clause 7.9, Gateway shall be remote accessible over 4G as well as ethernet for Updating firmware ,Operating System, Data log & export configuration, also provision to export data to any desired IP. Configuring polling interval, Calibrations of FTU channels Configuring wireless channel for each FTU from either RF/LORA/WLAN & any other required function. E)Analog Input :60 or Higher F) Serial Port :Rs 232, Rs485, G)Provision for LAN & WAN port. H)Data Handling Capacity :512 input or higher. It includes any other item to make RDPMS functional as per RDSO RDPM/FRS/2021 dtd 6 May 2021 or Latest to be provided by the firm. ( 01 Set means 01 Station/Auto Section) Inspection- RITES, Any other item not being inspected by RITES will be inspected by Consignee) Inspection charges: Borne by Railways Payment terms: 100% after supply | Station | 6.00 | 2,94,639.2 | 17,67,835.2 |
| 8 | Supply of: (a)GPS based Maintenance Information system (b)Mobile application (IOS & Android) c)Provision for cloud access,UI,configuration, database& report generation along with integration of Remote Diagnostic & Predictive Maintenance System including tools for alerts analysis & System generated Maintenance schedule. (i) Inspection: Consignee (ii) Inspection charges: None (iii) Payment terms: 80% after supply & 20% after commissioning | Station | 6.00 | 4,17,878.28 | 25,07,269.68 |
| 9 | Supply of Diagnostic Tool Kit :1* Leakage clamp meter of reputed make (Koico 3540 or similar),1 * Multimeter of reputed make (Rishabh 410 or Similar),1* Android tablet of reputed make (Lenovo Tab M10 FHD Plus Tablet or Similar/better), 1 * Label Printer,10* caste for label Printer (Brother Label Printer PT H105 or similar/better). (i) Inspection- Consignee (ii) Inspection charges: None (iii) Payment terms: 100% after supply | Numbers | 6.00 | 1,00,262.35 | 6,01,574.1 |
| 10 | Installation, Testing and Commissioning of FTU's/ Field Iot Devices totalling per channels of Current / Voltage. (Per Unit means Channel) (i) Inspection-Consignee (ii) Inspection charges: None (iii) Payment terms: 100% after Execution | Numbers | 2646.00 | 154.91 | 4,09,891.86 |
| 11 | Installation, Testing and Commissioning of non intrusive type current sensors & voltage sensors. (i) Inspection-Consignee (ii) Inspection charges: None (iii) Payment terms: 100% after Execution | Numbers | 2646.00 | 429.58 | 11,36,668.68 |
| 12 | Installation, Testing and Commissioning of IOT device for sensing 110V DC Battery bank parameters including current and voltage transducers as per RDSO/RDPM/FRS/2021 dates 06.05.2021 or latest (i) Inspection- Consignee (ii) Inspection charges: None (iii) Payment terms: 100% after Execution | Numbers | 6.00 | 25,655.25 | 1,53,931.5 |
| 13 | Installation, testing & Commissioning of Vibration Sensor. (i) Inspection-Consignee (ii) Inspection charges: None (iii) Payment terms: 100% after Execution | Numbers | 55.00 | 1,001.6 | 55,088 |
| 14 | Installation, Testing & Commissioning of Indoor Equipments including supply of all accessories, wiring materials, connectors, etc required. (i) Inspection-Consignee (ii) Inspection charges: N o n e (iii) Payment terms: 100% after Execution | Station | 6.00 | 58,704.79 | 3,52,228.74 |
| Schedule total | ₹3,36,27,277.12 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GeneralCondition.pdf
ATTACHMENT
ConditionSignalling.pdf
ATTACHMENT
ConditionTelecom.pdf
ATTACHMENT
Conceptplans.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .