| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical TB proceeding communicated on 21.02.2025 |
| 3 | Not Admitted-Fee/PreQual/Technical PO HAZARA OLD HOSHIARPUR ROAD VILLAGE DHADDA JALANDHAR 144025 | JALANDHAR | PUNJAB | 144025 | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | SRI BAPUJI CONSTRUCTIONS PVT LTD L1 |
|---|---|---|---|---|
| 1.00 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, including cost of all materials all labour, lifts, loading, unloading transporting etc., complete as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief. | 3,275 | Rmt | 4,103.4 ₹1,34,38,635 Lowest |
| 2.00 | Providing & laying Plain/Reinforced Cement Concrete in open foundation complete as per drawing & technical specification for Pipe Culvert complete as per Drawing and Technical Specifications, including cost of all materials, formwork, centering, vibrating, compacting,all labour, usage charges of machinery, lead, lifts, loading, unloading transporting, stacking, curing, finishing the exposed faces etc., complete. (excluding cost of steel and fabrication charges) PCC Grade M15 using batching plant transit mixer & Concrete pump as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief. | 315.11 | Cum | 5,600.99 ₹17,64,927.96 Lowest |
| 3.00 | Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305 including all labour, usage charges of all machinery etc., complete as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief. | 409.64 | cum | 107 ₹43,831.84 Lowest |
| 4.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.including all labour, usage charges of all machinery etc., complete. (for new roads) ii) (A) By Mechanical Means in Light Jungle as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief. | 1.11 | Ha | 32,600 ₹36,146.88 Lowest |
| 5.00 | Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, all labour, usage charges of machinery, lifts, loading, unloading stacking,transporting etc., complete as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief. ( ii) Grading -II 13mm (Nominal Size)) | 1,495.38 | Sqm | 432.31 ₹6,46,465.57 Lowest |
| 6.00 | Stripping excess soil from shoulder surface to achieve the approved level and compaction with plate compactor as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief. | 13,660 | Sqm | 35.9 ₹4,90,394 Lowest |
| 7.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. 2.50mm thick as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief. | 900 | Sqm | 682.63 ₹6,14,367 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.4 L
Closing Date
22 Jan 2025, 4:30 pmClosed
EE NH Bangalore
O/O EE NH Bangalore
Providing crash barrier and road safety works from Km 21 600 to Km 21 700 Km 26 400 to Km 26 750 Km 31 300 to Km 31 400 Km 34 400 to Km 34 600 Km 37 000 to Km 37 600 Km 43 650 to Km 44 200 LHS Km 49 350 to Km 49 600 Km 50 400 to Km 51 000 RHS Km 51
2025_MoRTH_844536_1
NIT NO 11/2024-25 dated 15.01.2025
Open Tender
Civil Works - Roads
Works
60 days
Hoskote Kanakapura
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
As per NIT
₹2.4 L
21 Feb 2025
15 Jan 2025
23 Jan 2025
15 Jan 2025
22 Jan 2025
15 Jan 2025
Amount
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, including cost of all materials all labour, lifts, loading, unloading transporting etc., complete as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief.
Providing & laying Plain/Reinforced Cement Concrete in open foundation complete as per drawing & technical specification for Pipe Culvert complete as per Drawing and Technical Specifications, including cost of all materials, formwork, centering, vibrating, compacting,all labour, usage charges of machinery, lead, lifts, loading, unloading transporting, stacking, curing, finishing the exposed faces etc., complete. (excluding cost of steel and fabrication charges) PCC Grade M15 using batching plant transit mixer & Concrete pump as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief.
Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305 including all labour, usage charges of all machinery etc., complete as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.including all labour, usage charges of all machinery etc., complete. (for new roads) ii) (A) By Mechanical Means in Light Jungle as per specification and as per the direction of the Engineer-In-Charge for successful completion of workon the direction of Engineer-in-Chief.
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2, including cost of all materials, all labour, usage charges of machinery, lifts, loading, unloading stacking,transporting etc., complete as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief. ( ii) Grading -II 13mm (Nominal Size))
Stripping excess soil from shoulder surface to achieve the approved level and compaction with plate compactor as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. 2.50mm thick as per specification and as per the irection of the Engineer-In-Charge for successful completion of work on the direction of Engineer-in-Chief.
Bidder Name
SRI BAPUJI CONSTRUCTIONS PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .