| Sl No | Description | Qty | Unit | K.Narayanan Civil Contractor L1 | DEVANSH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001. Construction of 30000 Litres capacity OHT Tank at Sadanapalli H/o. Billanakuppam. Estimate Amount: 1971000/- | |||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth. A) First depth of 2m | 46.24 | Cum | 261.14 ₹12,075.11 | 261.14 ₹12,075.11 |
| 3.00 | B)Second depth of 1m | 8.06 | Cum | 261.14 ₹2,104.79 | 261.14 ₹2,104.79 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.45 | Cum | 1,696.24 ₹4,155.79 | 1,696.24 ₹4,155.79 |
| 5.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers. | 2.77 | Cum | 5,259.85 ₹14,569.78 | 5,259.85 ₹14,569.78 |
| 6.00RCC in M30 GRADE using graded aggregates of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers | |||||
| 7.00 | For items 1.5m to 4.5m Below GL. Footing | 7.59 | Cum | 9,081.72 ₹68,930.25 | 9,081.72 ₹68,930.25 |
| 8.00 | For items 0m to 1.50m Below GL | 1.75 | Cum | 8,944.33 ₹15,652.58 | 8,944.33 ₹15,652.58 |
| 9.00 | For items 0m to 4.5m Above GL | 2.83 | Cum | 9,083.99 ₹25,707.69 | 9,083.99 ₹25,707.69 |
| 10.00 | For items 4.51m to 7.32m Above GL | 2.23 | Cum | 9,359.1 ₹20,870.79 | 9,359.1 ₹20,870.79 |
Updated dates
Tender Value
₹19.7 L
EMD Value
₹20,000
Closing Date
17 Mar 2026, 3:00 pmClosed
The Block Development Officer, Veppanapalli
The Block Development Officer, Veppanapalli
Krishnagiri District, Veppanapalli block, NABARD (RIDF XXIX) 2025-2026, Construction of 30000 Litres Cpacity OHT at Sadanapalli H/o. Billanakuppam. Pkg.No. 2025-2026 VNPI 29
2026_RDTN_668135_1
ROC_NO_4455_2025_A2_27_11_2025
Open Tender
Civil Works
90 days
Veppanapalli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
The Block Development Office, Veppanapalli
9 May 2026
27 Feb 2026
17 Mar 2026
27 Feb 2026
17 Mar 2026
27 Feb 2026
2 Mar 2026
1. Construction of 30000 Litres capacity OHT Tank at Sadanapalli H/o. Billanakuppam. Estimate Amount: 1971000/-
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth. A) First depth of 2m
B)Second depth of 1m
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers.
RCC in M30 GRADE using graded aggregates of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers
For items 1.5m to 4.5m Below GL. Footing
For items 0m to 1.50m Below GL
For items 0m to 4.5m Above GL
For items 4.51m to 7.32m Above GL
For items 7.32m to 10.98m Above GL
For items 10.98m to 14.64m Above GL
For items Above 14.64m to 18.30m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding
I) Plane Surface
Below GL
ABOVE GL to 3.30m
Curved Surface
0 to 3.30m from floor level
Square column Below G.L.
Ground level to 3.30 m
Square column 3.31 to 4.30m
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Departmental officers
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc. RCC inner Ladder as per sub estimate. R.C.C. 1:1/2:3 using 20mm HBG Stone
R.C.C. 1:1/2:3 using 20mm HBG stone
Shuttering charges by using MS angle and MS sheet
Steel fabrication, placing and fixing of steel including cost of steel and binding wire etc., complete
Hoisting the inner access ladder and fixing in position as directed by the departmental officers
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by Departmental officers. Mosquito proof
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by Departmental officers
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixed with 12mm dia Fastner Bolt 75mm long and as directed by Departmental officers
Vertical pipes at 0.45m spacing ( 3.142 * 5.34m / 0.45m = 38 nos)
Harizontal pipes over Vertical pipes ( 3.142 * 5.34m = 16.77m)
Supply and delivery of MS Base plate 40 x 6 mm thick for Hand Rails at 0.45 m height ( Horizantal ) Weight 1.99 kg / m = 3.14 *5.34 m = 16.77 m. Total Weight 16.77 m X 1.90 kg = 30.86 kg
Supply and delivery of MS Base plate of 100 x 100 x 6 mm thick over cover slab for fixing of 32 mm GI Pipes (Medium) Pipes vertical (approximately 0.750 grams for each) WR-M00051
Supply and fixing of Anchoor fastner bolt 12 mm dia of 75 mm long in the base plates
Labour charges for Fabirication of MS flates and GI Pipes. 32 mm dia GI Ppes cutting charges
32 mm dia GI Pipes Welding charges
MS Plates cutting charges
MS Flates Welding charges
Painting of Iron works. MS Flats ( 40 X 6 mm ) 80 + 12 = 92 mm
32 mm dia GI Ppes Horizantal ( 3.142 * 16.77 m * 0.034 m = 1.79 sqm) and 32 mm dia GI Ppes Vertical = 38 nos x 0.90 m x0.034 m - 1.16sqm ( 1.79 + 1.16 =2.95 )
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications. CI man hole cover
Provision for pipe connection arrangements
65mm Ø GI pipes for over flow & 1xl
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 90degree Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer Medium
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
50mm Ø GI coupler
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers
Provision for Soak pit as per sub estimate
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Provision for distribution pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete. Pipe Trench for 63mm 4ksc pipe
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers. Pipe Trench, 63mm 4ksc pipe
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe including laying and jointing,
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe laying & jointing
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mmPVC Ball Valve
Provision sub Estimate for Pumping Pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete. Pipe Trench for 75mm 4ksc pipe
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers. Pipe Trench for 75mm 6ksc pipe
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
75mm 6KSCPVC Pipe including laying and jointing,
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
75mm 6KSCPVC Pipe laying & jointing
75mm PVC Elbow
75mm PVC Tee
75mm PVC End Cap
75 mmPVC Ball Valve
Provision for Chlorinator as per sub Estimate
90mm dia PVC pipe
63mm dia PVC pipe
32mm dia PVC pipe
63 x20mm PVC saddle
90 x63mm PVC reducer coupler
63mm x 50mm PVC reducer coupler
PVC gate valve 90mm dia
PVC gate valve 63mm dia
32mm PVC Elbow
32mm PVC End cap
90mm PVC End cap
Cost of brackets for PVC pipes
Labour charges for fixing the PVC pipes and specials including all charges
Contingencies
Provision for Name Board
Provision for Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.62 MB
tb29.pdf
Tender Documents • 0.35 MB
pb29.pdf
Tender Documents • 0.19 MB
BOQ_802762.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid