| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC VILL SARANGPUR HABASPUR DISTRICT PURBA BARDHAMAN PIN 713401 | HABASPUR | PURBA BARDHAMAN | WEST BENGAL | 713401 | ₹6.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹7.0 L+₹96,238 (15.9%)Rejected-Finance | ₹7.0 L+₹96,238 (15.9%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹7.0 L+₹96,518 (16.0%)Rejected-Finance GUSHKARA COLLEGE ROAD GUSHKARA DIST PURBA BARDHAMAN | GUSHKARA | PURBA BARDHAMAN | WEST BENGAL | ₹7.0 L+₹96,518 (16.0%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹7.0 L
EMD Value
₹14,019
Closing Date
22 May 2026, 11:00 amClosed
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
FMP at Damodar Left Embankment in between ch. 39.00 to 47.00 km under Amirpur (I) Section of Edilpur (I) Sub-Division within Damodar Canal Division during the year 2026-27 (2nd Call).
2026_IWD_1024197_1
WBIW/EE-I/DCD/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
150 days
Amirpur (I) Section
Please refer Tender documents.
7 documents required · 7 mandatory
₹14,019
Yes
11 Jun 2026
15 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in closing ghoges in embankments including cutting, filling, puddling with water and ramming including all leads and lifts, if necessary | 118.4 | Cum. | 128.71 | ₹15,239.26 |
| 2 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 696 | Mtr. | 34.56 | ₹24,053.76 |
| 3 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary | 368 | Mtr. | 13.11 | ₹4,824.48 |
| 4 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 96 | Mtr. | 26.22 | ₹2,517.12 |
| 5 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levellingasper direction ofthe Engineer-in-charge within a lead of,
A) Beyond 1.00 metre and upto 2.00 km. For compensation for earth for land owned and arranged by construction add Rs.25.00 per cum extra over rate of E/W for land owned arranged by the Department & for royalty charge on earth @ 29.00 per cum and cesses charge @ 5.30 per cum as per Govt. notification which will be paid on production of necessary document in support of payment made towards the royalties. | 447.7 | Cum. | 330.48 | ₹1,47,955.9 |
| 6 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny/poly cement bags (minimum 25nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire with in a lead of 150 m. and all lifts in river slope or bed by cutting trenches up to 50cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth /sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:-Volume of each earth /sand filled bags should not be less than 0.028 m 3.Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary. | 138 | Each. | 498.17 | ₹68,747.46 |
| 7 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 72,800 | Sqm. | 2.38 | ₹1,73,264 |
| 8 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling willnot beaccepted ) , andstacking withina lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 3,132 | Each. | 8.34 | ₹26,120.88 |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 3,132 | Each. | 7.15 | ₹22,393.8 |
| 10 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 3,132 | Each. | 3.58 | ₹11,212.56 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
2911i.pdf
Tender Documents • 1.26 MB
BOQ_2517114.xls
BOQ • 0.24 MB
1.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .