Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12.9 L
EMD Value
₹12,920
Closing Date
29 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (BP)
BDO Office, Salem Panchayat Union
Salem District - Salem Block - Upgradation of the Road from Erumai kuttai palam road to deaf and dumb school road H/O Kondappanaickenpatty - SFC(DP) - 2022 - 2023
2023_RDTN_296263_1
Roc.No.1262/2022/A2
Open Tender
Civil Works
Item Wise
90 days
BDO Office, Salem Panchayat Union
As per tender Document
3 documents required · 3 mandatory
₹0
₹12,920
3 Apr 2023
20 Mar 2023
29 Mar 2023
20 Mar 2023
29 Mar 2023
20 Mar 2023
Amount
Upgradation of the road from Erumai Kuttai Pallam Road to Deaf and Dumb School Road H/O Kondappanaickenpatty
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Complete as directed by the departmental oficers.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious Macadam (BM) 50mm thick Overlay using paver after repairs to cracks and pot holesfiling, mixed in hot mix plant of drum type using paving bitumen 60/70 penetration grade as per IS 73 and CMR Bit plast and percentage of bitumen shall be 4.5% by weight of total mix aggregates shall conform to grading 2 of table 500 - 4 of clause 507 of MORT&H specification with all leads and lifts etc., complete and as directed by the Engineer. overlay using paver after repairs to cracks and pot holes filling, mixed in hot mix plant of drum type using paving Bitume 60/70 penetration grade as per IS 73 and percentage of bitumen shall be 4.5% by weight of total mix aggregates shall conform to grading 1 of table 500-4 of clause 507of MORT&H specifications with all leads and lifts etc., complete and as directed by the Engineer.
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
sithan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .