| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹64,301 (0.56%)Rejected-Finance NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | ₹1.2 Cr+₹64,301 (0.56%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
11 Aug 2023, 3:00 pmClosed
The Project Director
RDDA Ramanathapuram
Ramanathapuram District - MGSMT/PMK-07/2022-23 Paramakudi Block
2023_RDTN_346689_35
R6/1332/2023/19.06.2023
Open Tender
Civil Works
Item Rate
180 days
RDDA Ramanathapuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.2 L
Yes
RDDA Ramanathapuram
20 Oct 2023
25 Jul 2023
11 Aug 2023
25 Jul 2023
11 Aug 2023
25 Jul 2023
25 Jul 2023
Amount
Clearing the scrub Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
Providing and fixing of sign board 60 cm Circle (Mandatory Sign)
Providing and fixing of Name board
Part II: Strengthening of the road from NH87 To ilanthaikulam road Km 0/000-0/490
Clearing the scrub Jungle with out uprooting including all labour charges
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Providing and fixing of Name board
Part III: Strengthening of the road from NH87To Ariyanenthal AD colony road Km 0/000-0/860
Clearing the scrub Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
Providing and fixing of sign board 60 cm Circle (Mandatory Sign)
Providing and fixing of Name board
Part IV: Strengthening of the road from Thinaikulam to Kalaiyur road Km 0/000-0/890
Clearing the scrub Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 25mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
Hecta metre stone
Providing and fixing of sign board 60 cm Circle (Mandatory Sign)
Providing and fixing of Name board
Provision for Toe wall as per sub Estimate
Earthwork excavation and depositing on bank with initial lead and list in all classes of soils except hard rock reg. blasting etc., complete as per SS 20B for foundation.
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
CC1:3:6 mix using 40 mm ISS HBG metal including cost and conveyance and all lanour charges etc complete
Part I:Strengthening of the road from NH87 To Thinaikulam road Km 0/000-880
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II: Strengthening of the road from NH87 To ilanthaikulam road Km 0/000-0/490
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part III: Strengthening of the road from NH87To Ariyanenthal AD colony road Km 0/000-0/860
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part IV: Strengthening of the road from Thinaikulam to Kalaiyur road Km 0/000-0/890
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JEEVANANTHAM CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .