| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Finance E 78 VRUNDAVAN COTTAGE INDUSTRIAL PARK NR RAMOL TOLL PLAZA RAMOL ROAD RAMOL AHMEDABAD GUJARAT 382449 UDYAM GJ 01 0094364 24EAMPM2395J1Z8 R M | AHMADABAD | GUJARAT | 382449 | ₹20.3 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 LAdmitted-Finance 1ST FLOOR PLOT NO 16 MAHARSHI DAYANAND SARASVATI MARG SECTOR 88 FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | ₹20.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R S ENGINEERING WORKS L1 | M/s A TO Z NDT SOLUTIONS (P) LTD L2 |
|---|---|---|---|---|---|
| 1.00 | strenqthening of Head Gear of Pit No. 3 (i) Supply Transportation Loading-Unloading
Painting (Primer -1 Coat & Aluminum Color 1
Coat) of ISMC 300.90, ISMB 350, and 16 mm &
12 mm Thick Plate as per the drawing (7975Kg x 110) = 877250.00/- (ii) HT Nut - Bolts (10.9 Grade) (1 LS @ 56000) (iii) Labour Charges for Fabrication and Erection work (85 Hds X 1388.06) = 117985.00/- (iv) Hydra Charges. (High-Capacity Long Boom) (8 Days x 9500)= 76000.00/- (v) Welding Electrode (22 Nos. x 460)= 10120.00/- (vi) DA Cylinder (10 Nos. x 2475)= 24750.00/- (vii) Oxygen Cylinder (22 nos x 289)= 6358.00/- (viii) Hiring Charges of Welding Machine, Grinding Machine, Cutting Machine, Cutting Set and Other Tools-Tackles (1 LS x 25577)= 25577.00/- (ix) Overhead Profit @ 10% = 119404.00/- | 1 | NOS. | 12,08,369 ₹12,08,369 | 12,47,772 ₹12,47,772 |
| 2.00 | strenqthening of Head Gear of Pit No. 1 (i) Supply Tran$portation Loading-Unloading
Painting (Primer -1 Coat & Aluminum Color 1
Coat) of ISMC 300.90 and 16 mm Thick Plate as
per the drawing (3046 Kg x 110)=335060.00/- (ii) HT Nut - Bolts (10.9 Grade) (1 LS @ 25189.00) (iii) Labour Charges for Fabrication and Erection work (45 Hds X 1388.06) = 62463.00/- (iv) Hydra Charges. (High-Capacity Long Boom) (4 Days x 9500)= 38000.00/- (v) Welding Electrode (16 Nos. x 460)=7360.00/- (vi) DA Cylinder (6 Nos. x 2475)= 14850.00/- (vii) Oxygen Cylinder (14 nos x 289)= 4046.00/- (viii) Hiring Charges of Welding Machine, Grinding Machine, Cutting Machine, Cutting Set and Other Tools-Tackles (1 LS x 15600)=15600.00/- (ix) Overhead Profit @ 10% = 50256.8/- | 1 | NOS. | 5,08,600 ₹5,08,600 | 5,25,183 ₹5,25,183 |
| 16.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 3,09,054.42 ₹3,09,054.42 | 3,19,131.9 ₹3,19,131.9 |
Tender Value
₹22.0 L
EMD Value
₹27,600
Closing Date
26 Dec 2025, 5:00 pmClosed
General Manager, Kunustoria Area
O/O The General Manager, Kunustoria Area, P.O - Toposi, Paschim Bardhaman, 713362, (W.B)
Strengthening of Head Gear structure as recommended in structural stability report of Pit No 01 n 03 of Kunustoria Colliery under Kunustoria Area
2025_ECL_349145_1
ECL/KNT/EnM)/e-Ten/25-26/26 Dt 05.12.2025
Open Tender
Miscellaneous Works
30 days
Kunustoria Colliery
As per NIT
4 documents required · 4 mandatory
₹27,600
13 Jan 2026
10 Dec 2025
27 Dec 2025
10 Dec 2025
26 Dec 2025
11 Dec 2025
11 Dec 2025 - 15 Dec 2025
Amount
strenqthening of Head Gear of Pit No. 3 (i) Supply Transportation Loading-Unloading Painting (Primer -1 Coat & Aluminum Color 1 Coat) of ISMC 300.90, ISMB 350, and 16 mm & 12 mm Thick Plate as per the drawing (7975Kg x 110) = 877250.00/- (ii) HT Nut - Bolts (10.9 Grade) (1 LS @ 56000) (iii) Labour Charges for Fabrication and Erection work (85 Hds X 1388.06) = 117985.00/- (iv) Hydra Charges. (High-Capacity Long Boom) (8 Days x 9500)= 76000.00/- (v) Welding Electrode (22 Nos. x 460)= 10120.00/- (vi) DA Cylinder (10 Nos. x 2475)= 24750.00/- (vii) Oxygen Cylinder (22 nos x 289)= 6358.00/- (viii) Hiring Charges of Welding Machine, Grinding Machine, Cutting Machine, Cutting Set and Other Tools-Tackles (1 LS x 25577)= 25577.00/- (ix) Overhead Profit @ 10% = 119404.00/-
strenqthening of Head Gear of Pit No. 1 (i) Supply Tran$portation Loading-Unloading Painting (Primer -1 Coat & Aluminum Color 1 Coat) of ISMC 300.90 and 16 mm Thick Plate as per the drawing (3046 Kg x 110)=335060.00/- (ii) HT Nut - Bolts (10.9 Grade) (1 LS @ 25189.00) (iii) Labour Charges for Fabrication and Erection work (45 Hds X 1388.06) = 62463.00/- (iv) Hydra Charges. (High-Capacity Long Boom) (4 Days x 9500)= 38000.00/- (v) Welding Electrode (16 Nos. x 460)=7360.00/- (vi) DA Cylinder (6 Nos. x 2475)= 14850.00/- (vii) Oxygen Cylinder (14 nos x 289)= 4046.00/- (viii) Hiring Charges of Welding Machine, Grinding Machine, Cutting Machine, Cutting Set and Other Tools-Tackles (1 LS x 15600)=15600.00/- (ix) Overhead Profit @ 10% = 50256.8/-
Total impact of GST for the purpose of CTC
M/s A TO Z NDT SOLUTIONS (P) LTD (BID ID -1205638)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.72 MB
Tendernotice_2.pdf
PDF • 1.24 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_361871.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid