Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 LAccepted-Finance VPO SANTOKHGARH TEHSIL DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹1.2 L | L-1 | Accepted-Finance Being Lowest |
| 2 | L-2₹1.3 L+₹17,074.35 (14.5%)Rejected-Finance | ₹1.3 L+₹17,074.35 (14.5%) | L-2 | Rejected-Finance Not Lowest |
| 3 | L-3₹1.4 L+₹21,667.45 (18.4%)Rejected-Finance | ₹1.4 L+₹21,667.45 (18.4%) | L-3 | Rejected-Finance Not Lowest |
| 4 | L-4₹1.5 L+₹32,151.70 (27.3%)Rejected-Finance | ₹1.5 L+₹32,151.70 (27.3%) | L-4 | Rejected-Finance Not Lowest |
| 5 | L-5₹1.6 L+₹40,139.70 (34.1%)Rejected-Finance R O VILLAGE PO NANGAL KHURD TEHSIL HAROLI DISTRICT UNA HP | ₹1.6 L+₹40,139.70 (34.1%) | L-5 | Rejected-Finance Not Lowest |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
2 Aug 2026, 10:30 amClosed
Executive Engineer Haroli Division HPPWD Haroli
Executive Engineer Haroli Division HPPWD Haroli
Restoration of rain damages on link road to Harijan Basti Beetan Km 0/00 to 1/300 and link road mohalla Kutta to Sant Danguwale Km 0/00 to 1/300, link road to village Bhadrian to Jongpur Km 0/00 to 0/750 and link road to village Gondpur to Jaichand t
2026_PWD_140018_1
J4 Restoration of rain damages on link road to Harijan Basti Beetan Km 0/00 to 1/300 and link road m
Open Tender
Civil Works
Percentage
Haroli
Please refer to bidding document
13 documents required · 13 mandatory
₹350
₹4,000
11 Aug 2026
27 Jul 2026
2 Aug 2026
27 Jul 2026
2 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of hydraulic excavtor 0.90 cum. fited with rock breaker on through rate basis for making drain and side cuttings in hard rock( where blasting is prohibted) as per direction of the Engineer-in-charge .The cost of Lubricant diesel etc. and wages of operational staff will be borne by the contractor including carriage of material within all leads and lifts and other incidentials. | 167 | Per Hour | 1,100 | ₹1,83,700 |
| 2 | Hiring of Tractor with Trolley 3.00cum. capacity to be deployed for disposing/carring of material like earth kankar moorum, shingles and boulder etc. including cost of fuel, oil lubricants and wages of operational staff any repair breakge during operaation will be carried out by the owner at his risk and cost including shifting of Tractor with Trolley from one place to other and six hours per day will be required working hours . | 8 | Per Day | 2,000 | ₹16,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_207540.xls
BOQ • 0.25 MB
sbd4.pdf
Tender Documents • 6.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .